AVRO Museum - All Entries
"Fig. 1 Three-View General Assembly" CF-105 Avro Arrow
"First Flight" 40th Anniversary Dinner
$45,000,000 jet plant biggest Canada works see Avro staff 15,000
1,000 Orendas and Sabres produced / Avro Canada appointments
1,500 Back in Plants by Friday
1/7 scale Avro C-102 Jetliner - Fuselage Former Design Reference
10 year service certificate
10 years later former PM's views are unchanges, Arrow Decision was right on: Diefenbaker
1000 Aircraft Photos website - Avrocar
1000 Aircraft Photos website - C-102 Jetliner
1000 Aircraft Photos website - CF-100
1000 Aircraft Photos website - CF-105
1000 Orendas and Sabres Produced / Avro Canada Appoinments
1000 delivered… more on the way
11 Steps To Survival (1971 version)
11 Steps to Survival (1980 version)
13 significant years in story of Avro
14022 Dec 8 1954
14211 Mar 8 1955
14253 Mar 23 1955
14737 Dec 7 1955
15...20,000 lbs. of Thrust and more…
15375 Oct 18 1956
15691 Feb 14 1957
15948 June 13 1957
16433 Oct 24 1957
16437 Oct 25 1957
16451 Oct 29 1957
17676 Nov 25 1958
17810 Dec 22 1958
17818 Dec 22 1958
17820 Dec 22 1958
17881 Jan 10 1959
17894 Jan 13 1959
17919 Jan 20 1959
17929 Jan 21 1959
17948 & 17949 Jan 28 1959
17966 Feb 3 1959
17983 Feb 4 1959
18 municipalities plan Arrow Support
18025 Feb 14 1959
18032 Feb 17 1959
18040 Feb 19 1959
18052 Feb 23 1959
18072 Feb 26 1959
18075 Feb 27 1959
18378 May 14 1959
18393 in Duxford UK, Oct `79
18528 June 19 1959
18534 at Belgium Air Force Museum, Apr 11, 1981
18561 June 30 1959
18569 July 2 1959
18587 July 7 1959
18619 on Malton Pedestal in 1970's
18708 Aug 13 1959
18719 Aug 14, 1959
188 shocked and bewildered as Nobel's Orenda Plant Closes
19079 Nov 19 1959
19130 Dec 3 1959
19374 Jan 29 1960
19397 Feb 4 1960
19406 Feb 6 1960
19420 Feb 9 1960
19435 Feb 16 1960
1945 Avro Canada
1950 SBAC Show
1956 Industry Review
1957 Christmas Mailing List
1957 Directory and Buyer's Guide - Directory Section
1958 - Year of decision - Commitments for NATO, NORAD Keystone to Industry's Development
1958 Annual Report
1959 Annual Report
1959 Avrocar Testing Pt2/2 250226-06 | Footage Farm
1967 Aviation Directory of Canada
1999 The story of the Avro Arrow from Dream to Legend
1999 The story of the Avro Arrow from Dream to Legend
1999 The story of the Avro Arrow from Dream to Legend
1st Air Division: CF-100's to strengthen Canada's NATO role
1st flight of C-102 Jetliner on Aug 10, 1949
2 photos - Arrow Replica at AETE Cold Lake with CF-18 and Tutor & replica fenced off - AETA X added to tail
201 in flight showing left side of a/c
201 landing gear failure - accident Damage - Fig. 26
201 landing gear failure - accident Damage - fig 28
201 landing gear failure - accident Damage - fig. 1
201 landing gear failure - accident Damage - fig. 10
201 landing gear failure - accident Damage - fig. 12
201 landing gear failure - accident Damage - fig. 14
201 landing gear failure - accident Damage - fig. 15
201 landing gear failure - accident Damage - fig. 4
201 landing gear failure - accident Damage - fig. 5
201 landing gear failure - accident Damage - image
201 landing gear failure - accident Damage - image 1
201 landing gear failure - accident Damage - image 10
201 landing gear failure - accident Damage - image 11
201 landing gear failure - accident Damage - image 12
201 landing gear failure - accident Damage - image 13
201 landing gear failure - accident Damage - image 15
201 landing gear failure - accident Damage - image 16
201 landing gear failure - accident Damage - image 17
201 landing gear failure - accident Damage - image 18
201 landing gear failure - accident Damage - image 19
201 landing gear failure - accident Damage - image 2
201 landing gear failure - accident Damage - image 20
201 landing gear failure - accident Damage - image 21
201 landing gear failure - accident Damage - image 22
201 landing gear failure - accident Damage - image 23
201 landing gear failure - accident Damage - image 24
201 landing gear failure - accident Damage - image 25
201 landing gear failure - accident Damage - image 26
201 landing gear failure - accident Damage - image 27
201 landing gear failure - accident Damage - image 28
201 landing gear failure - accident Damage - image 29
201 landing gear failure - accident Damage - image 3
201 landing gear failure - accident Damage - image 30
201 landing gear failure - accident Damage - image 31
201 landing gear failure - accident Damage - image 32
201 landing gear failure - accident Damage - image 33
201 landing gear failure - accident Damage - image 34
201 landing gear failure - accident Damage - image 35
201 landing gear failure - accident Damage - image 36
201 landing gear failure - accident Damage - image 37
201 landing gear failure - accident Damage - image 38
201 landing gear failure - accident Damage - image 39
201 landing gear failure - accident Damage - image 4
201 landing gear failure - accident Damage - image 40
201 landing gear failure - accident Damage - image 41
201 landing gear failure - accident Damage - image 5
201 landing gear failure - accident Damage - image 6
201 landing gear failure - accident Damage - image 7
201 landing gear failure - accident Damage - image 8
201 landing gear failure - accident Damage - shows 40,000 lbs jack under left wing
201 landing gear failure - accident Damage - shows wheels on ground
201 landing gear failure - accident Damage201 landing gear failure - accident Damage - image 14
244 from Avro in Acton area
25203 Test
2nd CF-100 jet in crash, pilot lives
3 Allan Jackson replica stories
3 Canadair Sabres (F86) in formation over Mont-Saint-Hilaire
3 Canucks in Flight
3 documents - Report bibliography on Zero Launch Rec'd from Astia July 29, 1958. Arrow 2A Zero Length Launch (Avro Technical Dept). Arrow 2A Zero Length Launch Investigation (Avro Aircraft Oct 1958).
3 reports on AVRO VTOL Program. Avro VTOL Program Remmended taskings in general order of priority. Observations concerning the Avro Circular Platform aircraft. Review of PV-704/606A Program
3- 4"x6" Photos of Model of the Avro Jetliner
3/4 view of Arrow RL-201 on Rollout Day (Negative) see See AC.1999.3.1
3/4 view of Arrow RL-201 on Rollout Day (Print) see See AC.1999.3.1
3/4 view of Arrow RL.201
30203 Dec 31 1958
30373 Nov 15 1961
32 Color Schematic Drawings of the Arrow 1 Fuel System
4 Canucks in Flight
4,500 ask job action for Avro
406 Wing marks Battle of Britain observances at CF-100 monument
409 Sqn CF-100's in flight
40th Anniversary speeches
47 Years Later, It's Still Arrow Dynamic
4th Annual Dinner 10 year club
50 Years of Flight - Milestones Along the Way
50 years: The end of an aviation era?
50-Passenger Jetliners
50th anniversary of flight opportunity for appraisal
53 Years ago today… the arrow is cancelled… and canada returns to Research and Development obsurity
55 Years Ago - Avro Arrow Maiden Flight
5th Anniversary Dance Souvenir Programme - Engineering Division Gas Turbine - May 30 1951 Club Kingsway
62 Minutes to New York by Canada-built Jetliner
675 mph Jet Fighter, Canada's First Reported Nearly Ready at Malton
7,000 Metro Jobs scrapped with Arrow
7-4400-1, Aerodynamic Three View
75 S.T. PROPOSED ALUMINIUM SKINS - C-105 drawing 7-4400-1W-01
8.5"x11" Black and White Photo of Arrow RL-201 on Approach for Landing (Side View)
8.8x11 inch Black and White Photo of Avro Jetliner Just before Touchdown
9968 June 21 1950
A Boost from Industry
A Brief Technical Description of the Avrocar AVRO/SPG/TR174
A Canadair Project - Building the Sabre
A Canadian View of recent developments in Aerodynamic Research
A Canadian dream flies high
A Celebration of Canadian Technology - The Iroquois Engine Program
A Cross Section view of Canada's Aircraft Industry
A Flesh and Blood Saucer - 1961
A Forward Look at air defense: Canada's new concept of Continental Air Power
A Glimpse into the Future - CAN-CAR Wings over Canada
A High Speed Canadian Wind Tunnel
A History of Air Defense of Canada 1948-1997
A History of Avro Arrow in the Cold War
A Jet Blade Anti-Corrosive
A Jet Too Soon; Politics and Aviation in Canada; the Disassembly of an industry, Part 1
A Jet's higher operating costs can still give more profit
A Jetblown Lancaster - The Orenda takes to the Air
A Limey at Heart
A Limited Technical Evaluation of the Arrow Interceptor System (U)
A Look Back
A Mount for the Iroquois
A Photo Tour of Avro Museum - Ogden location
A Piece of Cake - Flying the C-102
A Place for the Arrow in his heart
A Proposal for Long Range Jet Transport
A Report on Canada's Aircraft Industry
A Retractable Rocket Pod
A Review of Promising Future Avro Projects - development program report No. 9
A Review of some Temperature and Thermal Stress Considerations related to Surersonic Aircraft design as derived from experience in the design of the Avro Arrow
A Revisionist perspective on the Avro Arrow
A Roar becomes a rumble - Test Beds fot the Iroquois
A Seven Jet B47
A Short History of Avro Canada "There Never Was an Arrow"
A Significant Achievement
A Study of 650 Computer Costs, Alternative Methods and New Applications
A Study of First Line Maintenance and Turnaround Facilities for Arrow 2. Report 72/GEO/3 - Vol. 1 of 2
A Study of Proposal to Improve the Aerodynamic Characteristics of the C-104
A Study of Weapons Coverage obtained by Scrambling the CF-105 on Penetration of the Mid-Canada Line
A Swarm of Engineers
A Year of Growth in Canada's Aircraft Industry
A brief note on the C-105 intakes
A description of the rumbling, buzzing and banging within the Arrow propulsion system Report No. 70/INT AERO/27
A directory of Canadian military aircraft
A hint of things to come
A lean and hungry look
A long straight furrow
A man and his Arrow
A man with the Right Stuff
A mount for the Iroquois A USAF TB-47B Serving with the RCAF
A new powerful weapon for use with CF-100's, radar-aimed rockets, will soon be standard armament on Mk. 4 models
A new system for collection and utilization of field data on reliability and maintenance of weapons systems Report 70/REL 00/1
A piece of history found in Olds
A preliminary evaluation of the overall accuracy of an I. R. I. G. flight test instrumentation system
A preliminary report on the base facilities required at RCAF Cold Lake for the Arrow 2 development & demonstration programme. Issue 2
A preliminary report on the base facilities required at RCAF Cold Lake for the Arrow 2 development and demonstration programme
A rare bird: the Sparrow
A review of the Arrow flutter programme
A review of the maintenance and reliability aspects of the Arrow control surface and trailing edge components
A review of the maintenance and reliability aspects of the Arrow control surface and trailing edge components
A status to Preserve
A study of proposals to improve the aerodynamic characteristics of the A.V. Roe Canada Limited C-104 supersonic fighter projects
A summary of high speed wind tunnel test results for the Avro CF-105, and their effects on estimated performance
A year of Production for Canada's Aircraft Industry
A. V. Roe Canada V. T. O. project: revised general plan for preliminary wind tunnel testing at N. A. E., Ottawa
A.C.A.I. 24 - "Soviet Capabilities and Probable Courses of Action Against North America - 1 July 1957"
A.C.A.I. 34 - "Soviet Capabilities and Probable Courses of Action Against North America in a Major War Commencing in Mid-1958"
A.V. Roe & Co. Ltd Tudor II ad
A.V. Roe & Co. Ltd Tudor IV ad
A.V. Roe (Cnada) Ltd.
A.V. Roe / Orenda Reunion & Nobel Test est. Walk at Perry Sound, Ontario
A.V. Roe Canada 10th anniversary dinner - A Souvenir in Story and pictures
A.V. Roe Canada VZ-9 Avrocar Flying Disc Progress Report #1 - 1959
A.V. Roe Canada VZ-9 Avrocar Flying Disc Progress Report #2 - 1960
A.V. Roe Canada appoints Three
A.V. Roe Canada in 1948 with parking pass
A.V. Roe Trivia
A.V. Roe Trivia (Quiz)
A.V. Roe at airshow
A.V. Roe head denies Layoff was intended to embarassment
A.V. Roe in '62
A.V. Roe photo gallery
A.V. Roe the man
A.V.Roe 55th Anniversary - wine list
A.V.Roe Canada Limited Proxy letter for 1959 Annual Meeting
A.V.Roe Canada Ltd. Inventory No. Plate No. 8731-0161
A.V.Roe Canada Story (from untitled document)
A.V.Roe Scholarships
A.V.Roe Trivia (Quiz Answers)
ABC air standards and NATO STANAGS compliance with Arrow 1 and 2 Report No. 70/STDSS/1 Issue 2 Supersedes Issue 1
ACAI 31
ACCEPTANCE TESTS - A/C 25205
AETE Finds Fault
AIR CONDITIONING ENGINEERING TESTS
AIR CONDITIONING ENGINEERING TESTS - ARROW 1 AIRCRAFT 25205
AIRCRAFT 25202 ENGINE CALIBRATION TESTS
AIRCRAFT 25203 - FIRST FLIGHT
AITA Meeting 1954 - An annual affair
AMMENDMENT TO R.F.T. NO.5054, ENERGY ABSORBED BY LANDING GEAR DURING LANDING
ANTENNA EVALUATION TESTS - ARROW 1
ANTI SKID EVALUATION. A/C 25203
ANTI SKID PRE FLIGHT TEST
ANTI SKID SYSTEM TEST PROCEDURE
ARMAMENT PACK SEAL TESTS on 25203
ARROW 1 - AIRCRAFT WEIGHING
ARROW 1 - DECELERATION PARACHUTE
ARROW 1 - FIRST FLIGHT R.F.T. 07-5024, Addendum 6
ARROW 1 - FIRST FLIGHT R.F.T.07-5024, Addendum 5
ARROW 1 - FIRST FLIGHT TAKF-OFF AND LANDING SPEEDS
ARROW 1 - FIRST SERIES OF ENGINEERING FLIGHTS RFT 5051
ARROW 1 - FLYING CONTROL DEVELOPMENT
ARROW 1 - FUEL SYSTEM TESTS
ARROW 1 - WHEEL BRAKE TESTS (R.F.T. 5035) AIRCRAFT 25201
ARROW 1 ELECTRICAL SYSTEM FLIGHT TESTS
ARROW 1 ELECTRICAL SYSTEM FLIGHT TESTS, Addendum 1
ARROW 1 FIRST FLIGHT RFT
ARROW 201 Takes Off
ARROW through the heart
ASSEMBLY SEQUENCE WINDSCREEN - PILOTS CANOPY & NAVIGATORS CANOPY TO FORWARD FUSELAGE STRUCTURE
ASTRA 1 No 4 & No 5 A/C drawing 7-4200-PE-48
AVRO ARROW - James Floyd - CARP Top 25
AVRO ARROW An Aviation Chapter in Canadian History
AVRO ARROW CANADIAN INOVATION
AVRO ARROW FIRSTS VS F 35 LIGHTNING
AVRO ARROW VS Sukhoi Su-33
AVRO ARROW vs F 35 & F 18 episode 1
AVRO ARROW vs WAR - BATTLE FOR RANKIN INLET (PART 1)
AVRO ARROW vs WAR - BATTLE FOR RANKIN INLET (PART 2)
AVRO Lancaster, BBMF, Nice Departure at Eindhoven
AVRO VTOL Fighter
AVRO vertical Take-off Aircraft
Ab Initio to World Class 1
Ab Initio to World Class 2
Ab Initio to World Class 3
Abbotsford Attractions
Abbreviated Development Plan AVRO VTOL High Preformance Reseach System - system No 453L
Absence of B. Roden
Absence of Mr. J. Stewart
Abstract from P/Power/66 C105 buzz threshold Pratt & Whitney J-75 Orenda Iroquois
Accent on Crew Survival
Access Door - Electric Equip. Duct Bay drawing 7-1056-1457-P.E. Sheet 1
Access Door - Electric Equip. Duct Bay drawing 7-1056-1457-PE L/H Sheet 2
Access to Area 1
Access to information request
Accustic Problems - Arrow 1
Actuarial Report re Pension Plan Consideration A.V. Roe Canada Limited and Subsidiary Companies
Addendum to report LOG/105/43 Avro Arrow power plant ground support equipment
Addendum to: Directional stability tests at M=1.57 on a 1/80 scale model of the Avro C-105 aircraft with certain modifications
Advanced Flight Training
Advanced Project Note #3: The Possibilities of Hydrogen as an Aircraft Fuel
Adventurers search for Arrows
Advertisement found on the inside back cover by A.V. Roe Canada Limited- Gas Turbine Division hi-lighting the power and performancenof their Orenda jet engine.
Aerial Oddities - The Plane that lost out as a first jet airliner lent its name to the breed
Aerial Photo of Avro Facilities in Malton
Aerial photo of Arrows on destruction line
Aerial photo of Arrows on destruction line - close up
Aerial photo of Avro plant, Malton Ontario.
Aero Exports Top $100 Million.
Aeroballistics range measurements of the performance and stability of supersonic aircraft
Aeroballistics range tests of the CF-105: phase 2: models 10-11 to 10-25. CARDE Technical Memorandum AB-45
Aerodynamic 3 view 2 Seat version c/w 2 J67 Engines - scale 1/24, Drawing 7-0100-6
Aerodynamic Data C-105
Aerodynamic Design of the Arrow Propulsion System
Aerodynamic Three View - A/C C 105 Drawing 7-4800-10
Aerodynamic Three View - A/C C 105 Drawing 7-4800-10
Aerodynamic Three View - A/C C 105 Drawing 7-4800-10
Aerodynamic Three View - A/C C 105, Drawing 7-4800-10
Aerodynamic Three View - A/C C 105, Drawing 7-4800-10
Aerodynamic Three View - A/C C 105, Drawing 7-4800-10
Aerodynamic Three View - A/C C.F. 105, Drawing 7-0100-10
Aerodynamic three view - a/c C105 scale 1/24
Aerodynamics Org Chart
Aerospace Museum of Calgary Parade Float 1/3
Aerospace Museum of Calgary Parade Float 2/3
Aerospace Museum of Calgary Parade Float 3/3
Aerospace newsletter
Aerotoxophily - Avro Aircraft's Arrow is wheeled out for ceremonial hand-over at Malton.
Aft Para-Box Struct, Drawing 7-0152-07, Sheet 1 of 1
After 50 years in storage CF-100 engine
After the Arrow
After the Arrow: an industry quivers
Afterburner increases jet power
Aide Memoire for the Minister Foulkes - Advantages and Disadvantages of Continuing the Production of the CF-105 - page 1,2,&3
Aide Memoire for the Minister Foulkes - Advantages and Disadvantages of Continuing the Production of the CF-105 - page 4,5,&6
Aide-Memoire on Transonic Transport, Project 1011
Aileron , Drawing 7-4374-PE-1
Aileron Controls - Remote Lub'n, Flying Controls Drawing 7-0115-518
Aileron Interchangeability Control Points , Drawing 7-4374-PE-10
Aileron Tooling Breakdown , Drawing 7-0174-PE-08
Ailoron Assembly 7-1074-1/2 drawing 7-1074-PE-01
Air "Currents" - May 1960
Air Force Salutes Avro Arrow Test Pilot
Air Force mechanic from Alliston reflects on Avro Arrow on 106th birthday
Air Industry Program Shifts to War Stride Backs RCAF Expansion
Air Line Trends - Aug 1951
Air Marshal Curtis for Avro Canada
Air Marshal W.A. Curtis
Air Marshall favored Arrow, can't comment
Air Power - Automotive powerplants are now the main hope for the amateur aviation industry
Air Power - Feb 1961
Air Progress -Spring 1958 Edition
Air conditioning and heating forward of navigators seat drawing 7-4300-PE-28
Air conditioning ground test panel - Report No. LOG/105/46
Air defence needs planning
Air of excitement as flight test centre opens
Air power and National Defence
Air transport - Aug 1956
Air transport - Aug 1958
Air transport - Sep 1956
Airborne brains trust
Aircraft - Volume 13 Number 10
Aircraft - Volume 13 Number 11
Aircraft - Volume 13 Number 12
Aircraft - Volume 13 Number 4
Aircraft - Volume 13 Number 5
Aircraft - Volume 13 Number 7
Aircraft - Volume 13 Number 8
Aircraft - Volume 13 Number 9
Aircraft - Volume 14 Number 1
Aircraft - Volume 14 Number 10
Aircraft - Volume 14 Number 11
Aircraft - Volume 14 Number 12
Aircraft - Volume 14 Number 2
Aircraft - Volume 14 Number 3
Aircraft - Volume 14 Number 4
Aircraft - Volume 14 Number 5
Aircraft - Volume 14 Number 6
Aircraft - Volume 14 Number 7
Aircraft - Volume 14 Number 8
Aircraft - Volume 14 Number 9
Aircraft - Volume 15 Number 1
Aircraft - Volume 15 Number 10
Aircraft - Volume 15 Number 11
Aircraft - Volume 15 Number 12
Aircraft - Volume 15 Number 2
Aircraft - Volume 15 Number 3
Aircraft - Volume 15 Number 4
Aircraft - Volume 15 Number 5
Aircraft - Volume 15 Number 6
Aircraft - Volume 15 Number 7
Aircraft - Volume 15 Number 8
Aircraft - Volume 15 Number 9
Aircraft - Volume 16 Number 1
Aircraft - Volume 16 Number 10
Aircraft - Volume 16 Number 11
Aircraft - Volume 16 Number 12
Aircraft - Volume 16 Number 2
Aircraft - Volume 16 Number 3
Aircraft - Volume 16 Number 4
Aircraft - Volume 16 Number 5
Aircraft - Volume 16 Number 6
Aircraft - Volume 16 Number 7
Aircraft - Volume 16 Number 8
Aircraft - Volume 16 Number 9
Aircraft - Volume 17 Number 1
Aircraft - Volume 17 Number 11
Aircraft - Volume 17 Number 12
Aircraft - Volume 17 Number 2
Aircraft - Volume 17 Number 3
Aircraft - Volume 17 Number 4
Aircraft - Volume 17 Number 5
Aircraft - Volume 17 Number 6
Aircraft - Volume 17 Number 7
Aircraft - Volume 17 Number 8
Aircraft - Volume 17 Number 9
Aircraft - Volume 18 Number 1
Aircraft - Volume 18 Number 10
Aircraft - Volume 18 Number 11
Aircraft - Volume 18 Number 12
Aircraft - Volume 18 Number 2
Aircraft - Volume 18 Number 3
Aircraft - Volume 18 Number 4
Aircraft - Volume 18 Number 5
Aircraft - Volume 18 Number 6
Aircraft - Volume 18 Number 7
Aircraft - Volume 18 Number 8
Aircraft - Volume 18 Number 9
Aircraft - Volume 19 Number 1
Aircraft - Volume 19 Number 10
Aircraft - Volume 19 Number 12
Aircraft - Volume 19 Number 3
Aircraft - Volume 19 Number 4
Aircraft - Volume 19 Number 5
Aircraft - Volume 19 Number 7
Aircraft - Volume 19 Number 8
Aircraft - Volume 19 Number 9
Aircraft - Volume 20 Number 1
Aircraft - Volume 20 Number 10
Aircraft - Volume 20 Number 11
Aircraft - Volume 20 Number 3
Aircraft - Volume 21 Number 1
Aircraft - Volume 21 Number 10
Aircraft - Volume 21 Number 12
Aircraft - Volume 21 Number 2
Aircraft - Volume 21 Number 3
Aircraft - Volume 21 Number 4
Aircraft - Volume 21 Number 5
Aircraft - Volume 21 Number 6
Aircraft - Volume 21 Number 7
Aircraft - Volume 21 Number 8
Aircraft - Volume 21 Number 9
Aircraft - Volume 22 Number 1
Aircraft - Volume 22 Number 10
Aircraft - Volume 22 Number 11
Aircraft - Volume 22 Number 12
Aircraft - Volume 22 Number 2
Aircraft - Volume 22 Number 3
Aircraft - Volume 22 Number 4
Aircraft - Volume 22 Number 5
Aircraft - Volume 22 Number 6
Aircraft - Volume 22 Number 7
Aircraft - Volume 22 Number 8
Aircraft - Volume 22 Number 9
Aircraft - Volume 23 Number 1
Aircraft - Volume 24 Number 4
Aircraft - Volume 24 Number 5
Aircraft - Volume 26 Number 1
Aircraft - Volume 26 Number 2
Aircraft 25215 Instrumentation for performance and handling evaluation: R.C.A.F./AVRO. Report 72/FAR/51
Aircraft Div Org Chart 1956
Aircraft Engineering Manual - Vol 1 (Design) Section V - Stress
Aircraft Engineering Manual - Vol 1 (Design) Sections 1-IV
Aircraft Engineering Manual, Vol. 1, Design, Sections II and V.
Aircraft Engineering Operations - Flow Chart
Aircraft Engines to be made here
Aircraft Manufactured in Canada - Avro CF-105 Arrow
Aircraft Production in Canada
Aircraft Systems Trainers
Aircraft and Airport - Volume 10 Number 1
Aircraft and Airport - Volume 10 Number 11
Aircraft and Airport - Volume 10 Number 12
Aircraft and Airport - Volume 10 Number 4
Aircraft and Airport - Volume 10 Number 5
Aircraft and Airport - Volume 10 Number 6
Aircraft and Airport - Volume 10 Number 7
Aircraft and Airport - Volume 10 Number 8
Aircraft and Airport - Volume 10 Number 9
Aircraft and Airport - Volume 11 Number 1
Aircraft and Airport - Volume 11 Number 10
Aircraft and Airport - Volume 11 Number 11
Aircraft and Airport - Volume 11 Number 12
Aircraft and Airport - Volume 11 Number 3
Aircraft and Airport - Volume 11 Number 4
Aircraft and Airport - Volume 11 Number 5
Aircraft and Airport - Volume 11 Number 6
Aircraft and Airport - Volume 11 Number 7
Aircraft and Airport - Volume 11 Number 8
Aircraft and Airport - Volume 11 Number 9
Aircraft and Airport - Volume 12 Number 1
Aircraft and Airport - Volume 12 Number 10
Aircraft and Airport - Volume 12 Number 11
Aircraft and Airport - Volume 12 Number 12
Aircraft and Airport - Volume 12 Number 3
Aircraft and Airport - Volume 12 Number 4
Aircraft and Airport - Volume 12 Number 5
Aircraft and Airport - Volume 12 Number 6
Aircraft and Airport - Volume 12 Number 7
Aircraft and Airport - Volume 12 Number 8
Aircraft and Airport - Volume 12 Number 9
Aircraft and Airport - Volume 13 Number 2
Aircraft and Airport - Volume 9 Number 2
Aircraft equipment list: appendix I issue 4: Arrow 1 model specification: AAMS-105/1
Aircraft flying control cables drawing 7-4300-PE-29
Aircraft layout of air conditioning and heating system drawing 7-4300-PE-27
Aircraft magazine cover with Avro Ad
Aircraft manufacturing in Canada - today and yesterday
Airforce - Vol 20 No 4
Airforce - Vol 33 No 4
Airforce - Vol 34 No 1
Airline Views on Jets on Conference Agenda
Airline Wings
Airline key to small cities…Douglas DC-9
Airlines can't ignore jets claims CPA president
Airloads - Avro Arrow
Airmail - Jan/Feb 2004
Airmail - Sept/Oct 2004
Airport Developments - Feb 1949
Airport Developments - Nov 1949
Airports - May 1950
Airpower - Vol 29 No 1
Airpower - Vol 9 No 2
Alert and Ready
All about flying saucers
Allan Jackson's Full-Scale Model Arrow - Abbotsford Air ShowAugust 1997 - 8.75x12
Allan's Arrow resurrects Canada's aviation heritage
Altitude Performance of Jet Fighters
Altitude Test Cell Covers Full Air Breathing Range
Altitude is Everything - Canadians in the Sky
Amateur sleuth uncovers missing Arrow jet engines
Amendment No. 2 to "Design Certificate for Flight Trials of Arrow 1 Aircraft Serial No. 25201" Report No. 71/PROJ 7/1
Amendment No. 4 to "Design Certificate for Flight Trials of Arrow 1 Aircraft Serial No. 25202 to 25205 Incl.
Amendment No. 5 to "Design Certificate for Flight Trials of Arrow 1 Aircraft Serial No. 25201" Report No. 71/PROJ 7/1
An Aeronautical Assembly
An Appraisal of Two VerticalTake-Off Interceptors
An Approach to Test Instrumentation
An International Air Show
An additional use for the Arrow?
An all new steering system
An arrester wire runway barrier for the Arrow aircraft
An arrow in the sky
An examination of the factors contributing to the change in estimated performance of the Arrow 2: from report no. 10, December, 1956, to report no. 12, November, 1957
An interview with Jan Zurakowski
An introduction to the JT15D enigne
An ultimate in interceptors!
Analysis of Tests of the Avrocar in the NASA 40 x80 ft. wind tunnel Ames Research Center - February 1961
Analysis of a Revised Gas-Turbine Engine Proposed by Mr. J. Frost
And now for something completely different: a Flying Ship from Toronto, Ontario
Angered by Arrow
Anglo-American Aeronautical Conference papers
Another Avro Arrow Artifact
Another Day at The Office - CF-100 Canuck
Anson V back in the air
Anson booklet
Antenna Evaluation Program CF-105 Report No. 71/Systems 13/3
Antenna Evaluation Program, CF-105
Antenna Evaluation Program, CF-105
Anti-IBCM Arrow PS-2
Anti-icing Developments at Avro
Appendix "A" to letter dated 19 March 1959, Avrocar Press Release
Appendix 1 to Model Specification for Arrow I Supersonic Aircraft
Appendix I to "Model specification for Arrow 2 supersonic interceptor aircraft"|Aircraft equipment list: appendix I: Arrow 2 model specification: AAMS/105/2. Issue 1
Appendix I to "Model specification for supersonic all-weather interceptor aircraft type CF-105". Issue 2|Aircraft equipment list: appendix I to model specification: AAMS-105/1. Issue 2
Appendix I to "Model specification for supersonic all-weather interceptor aircraft type CF-105". Issue 3|Aircraft equipment list: appendix I to model specification: AAMS-105/1. Issue 3
Appendix I to "Model specification for supersonic all-weather interceptor aircraft type CF-105"|Aircraft equipment list: appendix I to model specification: AAMS-105/1 issue 1 with "issue 2" handwritten
Appointment
Appraisal of the existing Arrow escape system Report No. 70/SYSTEM 24/125
Apprentice Training Pays Off When Applied to the Jet Engine Industry
Are we losing the air race
Area Map of Nobel
Area Rule Progress Report - February 1955
Argue Demands Ottawa Parley with Avro men
Armament Storage and Test Facility for CF-100 and CF-105
Around our neck
Arrival of Jet Power Brings New Language
Arrow
Arrow $20 silver coin
Arrow 'Kill' Correct but badly fumbled
Arrow - 1/48 Scale model
Arrow - 1/72 Scale model
Arrow - 1/8 scale elevator hinge models by Tom Dugleby
Arrow - 1/8 scale model on stand
Arrow - 2/3 scale cockpit mockup
Arrow - A World-Leading Intercepter by Avro Aircraft
Arrow - From Dream to Destruction - the story of the plane, the politics and a legend
Arrow .07 scale long range tank jettison tests series I and series II: N.A.E. low speed wind tunnel: August and November, 1956
Arrow .07 scale long range tank jettison tests series I and series II: N.A.E. low speed wind tunnel: August and November, 1956
Arrow 1 - Compliance with Requirements of U.S.A.F. Mil. Spec. F-8785. Handling Qualities of Piloted Airplanes
Arrow 1 - First Flight R.F.T. - Addendum 4 of Request for Flight Test 07-5024
Arrow 1 - First Flight RFT Addendum 9; RFT 07-5024 for 9th flight
Arrow 1 - Theory vs Flight Test Performance
Arrow 1 - Weight and Balance 10th Flight of Arrow 1 25201
Arrow 1 - Weight and Balance 9th Flight of Arrow 1 25201
Arrow 1 - Weight and Balance Data - 5th Flight for Arrow 1-25201
Arrow 1 - Weight and Balance Data - 6th Flight for Aircraft 25201
Arrow 1 - Weight and Balance Data -7th Flight for Aircraft 25201
Arrow 1 - Weight and Balance Summary 8th Flight of Arrow1 25201
Arrow 1 - weight and balance 5th flight Report No. 7-0400-71 Issue 4
Arrow 1 - weight and balance 6th flight Report No. 7-0400-71 Issue 5
Arrow 1 25201. Maintenance data record: electrics (fire detection): fire detection loop. Issues 1, 2 and 3
Arrow 1 A/C 25201 Weight and C.G. Summary - Report #7-0400-44 Issue 13
Arrow 1 A/C 25201 Weight and C.G. Summary Report #7-0400-44 Issue 14
Arrow 1 A/C 25201: weight & C.G. summary, Dec. 1/57 Report # 7-0400-44 Issue 12
Arrow 1 A/C 25202 and 25203 - Weight and Balance - Summary Report 7-0400-64 Issue 1
Arrow 1 Aircraft 25202 & 25203 - Weight and C.G. Summarry Reporrt 7-0400-64 Issue 4
Arrow 1 Compliance with requirements of USAF military specification F-8785. Handling qualities of piloted airplanes
Arrow 1 Flight Tests
Arrow 1 Fuel System Tests - R.F.T. No 5040 Engineering
Arrow 1 Instrumentaion for C105/1 Part 8, Issue 9
Arrow 1 Instrumentation - Part 6 Issue 8
Arrow 1 Instrumentation for C105/1 - Part 3 Issue 9
Arrow 1 Telemetry Required for Initial Flights
Arrow 1 Telemetry Required for Initial Flights
Arrow 1 Telemetry Required for Initial Flights
Arrow 1 aircraft 25201: weight & C.G. summary, Mar. 1/58 Report # 7-0400-44 Issue 15
Arrow 1 aircraft 25201: weight and C.G. summary, Apr. 1/58 Report 7-0400-44 Issue 16
Arrow 1 aircraft 25201: weight and C.G. summary, Feb. 1/58 Report # 7-0400-44 Issue 14
Arrow 1 aircraft 25201: weight and C.G. summary, Jan. 1/58 Report # 7-0400-44 Issue 13
Arrow 1 aircraft 25202 and 25203: weight and C.G. summary, July 1/58 Report No. 7-0400-64 Issue 3
Arrow 1 aircraft 25202 and 25203: weight and C.G. summary, June 1/58 Report No. 7-0400-64 Issue 2
Arrow 1 aircraft 25202 and 25203: weight and C.G. summary, May 1/58 Report No. 7-0400-64 Issue 1
Arrow 1 aircraft 25204 and 25205: weight and C.G. summary, Aug. 1/58 Report No. 7-0400-63 Issue 3
Arrow 1 aircraft 25204 and 25205: weight and C.G. summary, July 1/58 Report 7-0400-63 Issue 2
Arrow 1 aircraft 25204 and 25205: weight and C.G. summary, June 1/58 Report 7-0400-63 Issue 1
Arrow 1 aircraft 25204 and 25205: weight and C.G. summary, Oct. 1/58 Report No. 7-0400-63 Issue 5
Arrow 1 aircraft 25204 and 25205: weight and C.G. summary, Sept. 1/58 Report No. 7-0400-63 Issue 4
Arrow 1 aircrafts 25202 and 25203: weight and C.G. summary, Aug. 1/58 Report No. 7-0400-64 Issue 4
Arrow 1 and 2. Flight tests required for stability and control and damper development
Arrow 1 maintenance instructions: aircraft towing Report No. 70/MAINT 00/2
Arrow 1 maintenance instructions: instruments: pressure ratio indication
Arrow 1 service data (starts at section 27)
Arrow 1 service data. Engine installation
Arrow 1 service data. Main landing gear
Arrow 1 service data. Section 11: Flying controls: mechanical
Arrow 1 service data. Section 13
Arrow 1 service data. Section 25: Engine services: electrics
Arrow 1 service data. Section 26: Fire protection system
Arrow 1 service data. Section 31: Ejection seat MK C5
Arrow 1 service data. Section 34: Windshield and canopy de-icing
Arrow 1 service data. Section 38: Electrical system: master warning
Arrow 1 service data. Section 39: Electrical system: internal and external lighting
Arrow 1 service data. Section 40: Electronics: power distribution
Arrow 1 service data. Section 41: Electronics: radio compass AN/ARN-6
Arrow 1 service data. Section 42: Electronics: "X" band beacon
Arrow 1 service data. Section 43: Electronics: UHF homer adaptor AN/ARA-25
Arrow 1 service data. Section 44: Electronics: UHF command radio AN/ARC-34
Arrow 1 service data. Section 45: Electronics: IFF AN/APX-6X
Arrow 1 service data. Section 46: Electronics: interphone AN/AIC-10
Arrow 1 service data. Section 47: Electronics: J4 Gyrosyn compass
Arrow 1. Function test procedure: utility hydraulic system
Arrow 1/8 scale flying model - For CBC Mini-Series
Arrow 1: Digital Computation and Analysis of Arrow Lateral Response in Emergency Mode
Arrow 1: Digital Computation and Analysis of Arrow Longitudinal Response in Emergency Mode
Arrow 1: weight & balance summary 10th flight
Arrow 1: weight and balance 7th flight Report No. 7-0400-71 Issue 6
Arrow 1: weight and balance summary 8th flight Report No. 7-0400-71 Issue 7
Arrow 1: weight and balance summary 9th flight Report No. 7-0400-71 Issue 8
Arrow 2 - A/C 25206 Weight & C.G. Summary Report: 7-0400-82 Issue 2
Arrow 2 - Aircraft 25211 Instrumentation - Ref 5516/02A/J
Arrow 2 - Fuel Systems Test
Arrow 2 - Installation of the Genie Unguided Rocket
Arrow 2 - Zoom Ceilings
Arrow 2 A study of first line maintenance and turnaround facilities
Arrow 2 A study of the basic concept of an engine run up facility
Arrow 2 A/C 25206 Weight and C.G. Summary Report 7-0400-82 Issue 1
Arrow 2 A/C 25206: weight and C.G. summary, Sept. 1/58 Report No. 7-0400-82 Issue 1
Arrow 2 A/C 25207: weight and C.G. summary, Nov. 1/58 Report 7-0400-85 Issue 1
Arrow 2 Air Conditioning System Report No. 72/Systems 22/48-2
Arrow 2 An investigation of the need for an all weather trailer aircraft water supply
Arrow 2 Comments on proposed alterations to RCAF readiness hangars
Arrow 2 Control Boxes Development Program Progress Report
Arrow 2 Design study on mobile ground power units Report No. 72/GEQ/1
Arrow 2 Design study on mobile ground power units: addendum 1|Addendum 1 to report no. 72/GEQ/1
Arrow 2 Electrical Systems; report 72/Systems 11/27
Arrow 2 Electronic System (ReportNo. 72/System13/7-2)
Arrow 2 Engine Installation 72/AIREQ 25/1
Arrow 2 Escape System; Report No 72/ENG.PUB/2
Arrow 2 Flying Controls System
Arrow 2 Fuel System - Report 74 / Systems 16/21
Arrow 2 Ice Protection System Report No. 72/SYSTEMS 20/51
Arrow 2 Ice Protection System; Report No 72/Systems 20/51
Arrow 2 Location of Major Equipment
Arrow 2 Low Pressure Pneumatic System Report No 72/SYSTEMS 18/29
Arrow 2 Mock-Up Engineering Evaluation Conference
Arrow 2 Production A/C Weight & C.G. Summary - Report # 7-0400-34 Issue 15
Arrow 2 Production A/C Weight & CofG Summary Report 7-0400-34 Issue 25
Arrow 2 Production A/C Weight & CofG Summary Report 7-0400-34 Issue 27
Arrow 2 Production A/C Weight and Balance Summary Re. Issue 18
Arrow 2 Production A/C Weight and C.G. Summary Report #7-0400-34 Issue 16
Arrow 2 Production A/C Weight and C.G. Summary Report #7-0400-34 Issue 20
Arrow 2 Production A/C Weight and C.G. Summary Report 7-0400-34 Issue 24
Arrow 2 Production A/C Weight and C.G. Summary Report: 7-0400-34 Issue 23
Arrow 2 Proposal for the ground support equipment: demonstration and evaluation conference Report No. 72/GEQ/11
Arrow 2 Readiness Facility Report Log/105/
Arrow 2 Utility Hydraulic System; Report No 72/Systems 19/26
Arrow 2 air conditioning system
Arrow 2 aircraft 25206: weight and C.G. summary, Nov. 1/58 Report 7-0400-85 Issue 3
Arrow 2 aircraft 25206: weight and C.G. summary, Oct. 1/58 Report 7-0400-85 Issue 2
Arrow 2 aircraft 25207: weight and C.G. summary, Feb. 1/59 Report 7-0400-85 Issue 4
Arrow 2 aircraft 25207: weight and C.G. summary, Jan. 1/59 Report 7-0400-85 Issue 3
Arrow 2 aircraft 25211 - instrumentation
Arrow 2 armament system
Arrow 2 control boxes: development program progress report
Arrow 2 control boxes: development program progress report - Report 72/PROJ 7/19
Arrow 2 electrical system report no. 72/Systems 11/27
Arrow 2 electrical system report no. 72/Systems 11/27
Arrow 2 electronic system Report No. 72/System 13/7-2
Arrow 2 engine installation Report No. AIREQ 25/1
Arrow 2 escape system development program. Issue 2
Arrow 2 escape system, Report No. 72/ENG. Pub./2
Arrow 2 fire protection system Report No. 72/Systems 23/31
Arrow 2 fire protection system Report No. 72/Systems 23/31-2
Arrow 2 fuel system
Arrow 2 hydraulics system
Arrow 2 low pressure pneumatic system Report No. 72/SYSTEM 18/29
Arrow 2 low pressure pneumatic system. Report No. 72/SYSTEM 18/29-2 Issue 2
Arrow 2 maintenance instructions: jacking the Arrow 2
Arrow 2 mock-up engineering evaluation conference
Arrow 2 mockup engineering evaluation
Arrow 2 oxygen system Report No. 72/SYSTEMS 21/30
Arrow 2 production A/C weight and C.G. summary: report # 7-0400-34 Iss. 16
Arrow 2 production A/C: weight & C.G. summary, Aug. 1/58 Report # 7-0400-34 Issue 22
Arrow 2 production A/C: weight & C.G. summary, Dec. 1/58 Report 7-0400-34 Isse 26
Arrow 2 production A/C: weight & C.G. summary, July 1/58 Report # 7-0400-34 Issue 21
Arrow 2 production A/C: weight & C.G. summary, Nov. 1/58 Report # 7-0400-34 Issue 25
Arrow 2 production A/C: weight & C.G. summary, Oct. 1/58 Report # 7-0400-34 Issue 24
Arrow 2 production A/C: weight & C.G. summary, Sept. 1/58 Report # 7-0400-34 Issue 23
Arrow 2 production A/C: weight and C.G. summary, Apr. 1/58 Report No. 7-0400-34 Issue 18
Arrow 2 production A/C: weight and C.G. summary, Dec. 1/57 Report No. 7-0400-34 Issue 14
Arrow 2 production A/C: weight and C.G. summary, Feb. 1/58 Report No. 7-0400-34 Issue 16
Arrow 2 production A/C: weight and C.G. summary, Jan. 1/58 Report No. 7-0400-34 Issue 15
Arrow 2 production A/C: weight and C.G. summary, Jan. 1/59. Report # 7-0400-34 Issue 27
Arrow 2 production A/C: weight and C.G. summary, June 1/58 Report No. 7-0400-34 Issue 20
Arrow 2 production A/C: weight and C.G. summary, Mar. 1/58 Report No. 7-0400-34 Issue 17
Arrow 2 production A/C: weight and C.G. summary, May 1/58 Report No. 7-0400-34 Issue 19
Arrow 2 readiness facility Report No. LOG/105/9
Arrow 2 service manual: unpublished drawings from the proposed 1961
Arrow 2 weapon installation
Arrow 2, Mk2 High Speed Mission
Arrow 2. A study of second line maintenance facilities
Arrow 2. Methods of reloading the armament: preliminary time study
Arrow 2. Re-oiling of Iroquois engine, accessories gearboxes and constant speed drive system: requirements, alternative proposals and recommendations for ground re-oiling rig
Arrow 2. Twin engine supersonic all-weather fighter: standard aircraft characteristics. Issue 2
Arrow 2000 model flight
Arrow 201 - from right rear
Arrow 201 Maiden Flight
Arrow 201 Re-fueling
Arrow 201 Rollout taken from above the left side of the a/c
Arrow 201 at rollout
Arrow 201 at takeoff
Arrow 201 in flight
Arrow 201 landing
Arrow 201 on apron
Arrow 201 on climb - transparent background
Arrow 201 roll-out
Arrow 201 take-off with CF-100 chaseplane in background
Arrow 201/202
Arrow 203 - in flight - gear down - left side - pre-DayGlo
Arrow 203 in winter
Arrow 204 and a CF-100 on apron
Arrow 206 Cockpit
Arrow 206 on construction floor
Arrow 25203 Flights 4 & 6
Arrow 2: Armament System Report 72/Systems 26/8
Arrow 2: Conditions for break specification
Arrow 2: Flying Controls Hydraulic System Report 72/Systems 32/25
Arrow 2: periodic performance report number 13
Arrow 2: periodic performance report number 13 addendum 1|Avro Arrow 2: zoom ceilings: addendum I to periodic performance report no. 13
Arrow 2: standard instrumentation aircraft 25210 through 25220. File 72/FAR/14
Arrow 2A Zero Length Launch Investigation
Arrow 2A Zero length launch Report No. 72/STAB/45
Arrow 3 proposal
Arrow 35th Anniversary
Arrow 4
Arrow 4 Comments
Arrow 4 mission profile GOR 339 / Arrow 5 Proposal for GOR 339
Arrow Aftermath - Charges Union Heads Break Pact for Jobs
Arrow Aircraft - Armament Installations Genie (MB-1) Installation
Arrow Aloft
Arrow Bottom View
Arrow Cancellation
Arrow Cancellation 'Colossal blunder' labor chiefs charge
Arrow Cancellation - Disposal of Material
Arrow Cancellation Disposal of Airframe and Iroquois Engines
Arrow Cancellation Disposal of Airframes and Iroquois Engines
Arrow Cancellation Disposal of Material
Arrow Cockpit
Arrow Countdown
Arrow Decision Seen cutting Immigration
Arrow Decisions
Arrow Design Team Leaders: Robert Lindley, Jim Floyd, Guest Hake, Jim Chamberlin
Arrow Dispute
Arrow Drawings For Sale
Arrow Electronic System - Genie Information
Arrow Electronic System - Genie Installation
Arrow Electronic System - Genie Visit Clarances - Avro Personnel
Arrow Electronic System - Provision of a Genie Capability
Arrow Electronic System - Provision of a Genie Capability
Arrow Electronic System - Radome Implications for Genie
Arrow Exhibit - West Perry Sound Museum
Arrow Exhibit - Western Canadian Air Museum
Arrow First Flight
Arrow First Flight
Arrow Firsts
Arrow Flight Development
Arrow Flight Simulator image
Arrow Flight Test Manual - includes "Proposed CF-105 Structural Integrity Flight Test Program"
Arrow Flight model #8 on Nike Rocket
Arrow Fuel System
Arrow I A/C 25201 Preliminary analysis of flights nos. 1 to 9
Arrow I Digital Compputation and Analysis of Arrow Lateral Response in Emergency Mode
Arrow I Digital Compputation and Analysis of Arrow Longitudinal Response in Emergency Mode
Arrow I Instrumentation - Part 6 - Issue 8
Arrow I Maintenance Instructions - Main Landing Gear
Arrow I antenna tests: report on background & progress|Arrow I antenna test: report on background and progress
Arrow I instrumentation aircraft 4 and 5. Issue I
Arrow I maintenance instructions: Instruments: pitot static system
Arrow I maintenance instructions: air conditioning system maintenance report 105-22-4
Arrow I maintenance instructions: electrics: canopy actuation
Arrow I maintenance instructions: electrics: engine intake duct de-icing
Arrow I maintenance instructions: electrics: engine services
Arrow I maintenance instructions: electrics: fuel system.
Arrow I maintenance instructions: electrics: landing gear
Arrow I maintenance instructions: electrics: master warning system
Arrow I maintenance instructions: electrics: power supplies
Arrow I maintenance instructions: fire detection & protection: electrics|Arrow I maintenance instructions: fire detection and protection: electrics
Arrow I maintenance instructions: instruments: fuel contents indication
Arrow I maintenance instructions: instruments: miscellaneous
Arrow I maintenance instructions: instruments: turbine exhaust temperature indication
Arrow I maintenance instructions: lighting: electrics
Arrow I maintenance instructions: windscreen and canopy de-icing
Arrow ID tag dug up
Arrow Image
Arrow Information
Arrow Landing
Arrow MK 1 - Aerodynamic 3 View (Drawing 7-4300-10)
Arrow MK 1 4 view -
Arrow MK 1 Fusalage Formers J-75 Engine
Arrow MK 1 Weight & C.G.Summary - issue 11
Arrow MK 1 Weight & C.G.Summary, Issue 12
Arrow Maintenance Instructions, Damper System 70 Maint 13/1
Arrow Mk 1 - Avro's Mighty Fighter
Arrow Mk 1 - Flight Test
Arrow Mk 1 - Flight Tests
Arrow Mk 3 SK21855
Arrow Mk 3 Variable Air Intake
Arrow Model Recovery Program
Arrow Myth Part 1
Arrow Myth Part 2
Arrow Negative
Arrow Production Photos
Arrow Program Statement of Work (Issue2) - Brochure AD-51
Arrow Project End Protested by Veterans
Arrow RCAF 1958-59
Arrow Reference
Arrow Requirement for air conditioner and generator AC & DC
Arrow Research Notes
Arrow Review
Arrow Roll-Out Press Briefing
Arrow Roll-out - A Press Guide - Avro Aircraft Ltd
Arrow Roll-out - Facts - Avro Aircraft Ltd
Arrow Roll-out - Product of Avro Aircraft Limited
Arrow Roll-out - Product of Avro Aircraft Limited - Avro Aircraft Ltd
Arrow Roll-out - Research to Rollout - Avro Aircraft Ltd
Arrow Rollout
Arrow Rollout
Arrow Scrapping
Arrow Service Data Vol 1 (sections 1-23)
Arrow Service Data Vol 2 (sections 23-52)
Arrow Shame Rekindled
Arrow Structural drawings - 8-1/2x11 & 11x17 - from service manual
Arrow Success on first hop delights pilot
Arrow Test Pilot to be Honoured
Arrow That Doesn't Fly
Arrow Traveling Exhibit
Arrow Upper view with parking lot in background
Arrow Wasn't the only Avro Tragedy
Arrow Weapon System - Genie Capability
Arrow Weapon System - Genie Installation
Arrow Weapon System MB-1 Installation Data
Arrow Weapons System - Genie
Arrow Weapons System - Genie Capability
Arrow Weapons System Co-ordingating Contractor Report No. 2 Co-ordination of Arrow program statement of work
Arrow Weapons System Co-ordingating Contractor Report No. 5 Interim report on training requirements associate contractors personnel
Arrow Weapons System Co-ordingating Contractor Report No. 6 PRELIMINARY - Personal requirements for Arrow weapon system programs at Cold Lake
Arrow aerodynamic 3 view
Arrow at Trenton
Arrow by 2001 Deep Cove
Arrow construction bay image
Arrow countdown
Arrow cutaway view Drawing 7M1-1005-1
Arrow destroyed by builder, minister says
Arrow development Program will be continued
Arrow displays at Farnborough and Dallas air shows
Arrow dogfight
Arrow drawing
Arrow escape system RD. 84.A. Specification for rocket sled testing of the Arrow escape system
Arrow escape system RD. 84.B. Specification for rocket sled testing of the Arrow escape system
Arrow exceeds 1000 mph on seventh flight
Arrow fuel system
Arrow ground servicing equipment use of Giraffe - Model IG. 40T Report No. 70/GEQ/3-2
Arrow in the Sky
Arrow in the sky aircraft Production
Arrow is Up
Arrow landing gear
Arrow launch position for zero length launch
Arrow left Canada 'Boy alongside man' urges ties with UK
Arrow letters
Arrow letters to editor
Arrow mahogany model
Arrow main reason I quit- Simonds
Arrow maintenance instructions: damper system Report No. 70/MAINT 13/1
Arrow maintenance instructions: the use of Pre-Load Indicating (P.L.I.) washers
Arrow maintenance instructions: the use of pre-load indicating (P.L.I.) washers Report No. 70/MAIN 00/3
Arrow major factor when Simonds quit
Arrow material found
Arrow model - showing right side
Arrow model - taken from above - showing bottom
Arrow model - taken from above - showing top
Arrow model - taken from above right side
Arrow model on pedastal - front left side - from rear
Arrow model on pedastal - left side
Arrow model on pedastal - right side
Arrow model on pedastal- left side - from front
Arrow model on pedastal- left side - from front v2
Arrow model wind tunnel testing
Arrow model without a tail
Arrow on Tarmac
Arrow only now obsolescent
Arrow page
Arrow performance with P and W JT4B-23 engines
Arrow periodic performance report no. 11
Arrow quarterly financial progress report: period ending June 27, 1958
Arrow quarterly technical report: for period ending Sept. 30 1957
Arrow rollout - sepia
Arrow rumor quashed again
Arrow shot down by the military
Arrow side takeoff
Arrow side view
Arrow system leads the way
Arrow through the heart
Arrow triumph that never was
Arrow weapon system co-ordinating contractor: report no. 11: training requirements Avro and Orenda personnel
Arrow weapon system committee structure Report No. 6
Arrow weapon system evaluation planning. Issue number one
Arrow weapon system evaluation planning. Issue number two
Arrow's end still baffling
Arrow's future in doubt as estimates fail to give clue
Arrow, Bears and Secrets: The Role of Intelligence in Decisions on the CF-105 Program
Arrow-Silver dart stamp
Arrow/Iroquois Termination, Direction A15 O-13
Arrow2: Armament Hydraulic System Report No. 72/Systems 19/40
Arrows - Canada Built them… You can too
Arrows in the Abyss
Arrows to the Moon
Arrows, Bears and Secrets
Arsenal of Freedom
Arsenal of Ingenuity
Article 1
Artwork for CAHS Journal, 1979
As It Happens
As Paul sees it…
Ask Government Pay $2,000,000 in 'wages' to Avro unemployed
Ask Government aid for Aircraft Firms
Assessment of the performance characteristics of the proposed A.V. Roe C-105/1200 all-weather supersonic fighter aircraft
Assorted Bomarc articles
Assorted Draft Reports including Mark III Intake Design, Part 1 & Part 2, Method for Calculation of Propulsion System Net Thrust, Windmilling Buzz Boundaries; An Expandable Ejector Insert to Improve Arrow 2 Subsonic Cruise Preformance, Performance Calculations at Subsonic Cruises for Arrow 2 with Three Ejectors of Small Throat Diameter ratio; Arrow 3 Propulsion system, A Summary; Comparison between J75-A25, J75-B23 adn Iroquois 2 on Basis of Uninstalled net thrust adn specific fuel consumption; A Description of the Rumbling, buzzing and banging within the Arrow propulsion system; Escape from C105, Suggested modifications to C100 nacelle inlet to improve high speet, high altitude performance; A summary of a preliminary study for a Supersonic Jet Transport investigated in 1956; and others.
Assorted stories on TAM Arrow Replica
Assy & Breakdown of lower longeron Stn 255.0 joint sheet 3 of 3 , Drawing 7-4300-PE-8
At $1,000 a day, couldn't pay for Arrow in 1,959 yrs
At Avro Canada - A new Gas Turbine Lab
Attention Arrow admirers
Aurora Avro Arrow CF-105 Plastic scale model
Author says Dief scrapped Arrow
Automatic Flight Control
Automatic Flight Control in the Arrow
Automatic Flow Control in Jet Engine Fuel Systems
Automatic Stability and Control System for CF-105
Automatic stability and control system for CF-105
Avaition News Digest - Mar 1963
Avation News Jounal - Vol 29 No 3
Aviation Heritage comes full circle - 18 month events calendar Jan '92 - Jun '93
Aviation History Images
Aviation History Lives in Abbotsford
Aviation Intelligance - February 1957
Aviation Intelligence - Apr 1955
Aviation Intelligence - Apr 1956
Aviation Intelligence - Apr 1957
Aviation Intelligence - Aug 1955
Aviation Intelligence - Aug 1956
Aviation Intelligence - Aug 1957
Aviation Intelligence - Aug 1958
Aviation Intelligence - Aug 1959
Aviation Intelligence - Aug 1960
Aviation Intelligence - Dec 1956
Aviation Intelligence - Dec 1957
Aviation Intelligence - Dec 1960
Aviation Intelligence - Feb 1956
Aviation Intelligence - Feb 1957
Aviation Intelligence - Feb 1958
Aviation Intelligence - Feb 1960
Aviation Intelligence - Jan 1958
Aviation Intelligence - Jan 1959
Aviation Intelligence - Jan 1963
Aviation Intelligence - Jul 1956
Aviation Intelligence - Jul 1957
Aviation Intelligence - Jul 1958
Aviation Intelligence - July 1959
Aviation Intelligence - Jun 1955
Aviation Intelligence - Jun 1958
Aviation Intelligence - Jun 1962
Aviation Intelligence - June 1959
Aviation Intelligence - Mar 1956
Aviation Intelligence - Mar 1961
Aviation Intelligence - May 1958
Aviation Intelligence - May 1961
Aviation Intelligence - Nov 1955
Aviation Intelligence - Nov 1957
Aviation Intelligence - Nov 1958
Aviation Intelligence - Nov 1963
Aviation Intelligence - Oct 1955
Aviation Intelligence - Oct 1956
Aviation Intelligence - Oct 1957
Aviation Intelligence - Sep - 1956
Aviation Intelligence - Sep 1955
Aviation Intelligence - Sep 1956
Aviation Intelligence - Sept 1955
Aviation News - Jan 1955
Aviation News - Oct 1954
Aviation News Digest - Aug 1955
Aviation News Digest - Aug 1956
Aviation News Digest - Aug 1957
Aviation News Digest - Aug 1958
Aviation News Digest - Aug 1967
Aviation News Digest - Dec 1955
Aviation News Digest - Dec 1963
Aviation News Digest - Feb 1963
Aviation News Digest - Jan 1968
Aviation News Digest - Jul 1956
Aviation News Digest - Jun 1956
Aviation News Digest - Jun 63
Aviation News Digest - Mar - 1955
Aviation News Digest - Mar 1958
Aviation News Digest - Mar 1965
Aviation News Digest - May 1957
Aviation News Digest - May 1963
Aviation News Digest - Oct 1956
Aviation News Digest - Sep 1955
Aviation News Digest - Sep 1963
Aviation News Digest - Sept 1955
Aviation News digest - Jan 1957
Aviation at the trade fair
Aviation intellegence - Mar 1958
Aviation intelligence - Apr 1958
Aviation intelligence - Dec 1961
Aviation intelligence - Dec 1963
Aviation intelligence - Jan 1956
Aviation intelligence - Jan 1960
Aviation intelligence - Oct 1958
Aviation intelligence - Oct 1964
Aviation intelligence - Sep 1958
Aviation intelligence - Sep 1959
Aviation intelligence - Sep 1969
Aviation news - Nov 1954
Aviation news digest - Apr 1958
Aviation news digest - Dec 1957
Aviation news digest - Feb 1959
Aviation news digest - Jan 1958
Aviation news digest - Jul 1961
Aviation news digest - Jun 1958
Aviation news digest - Mar 1956
Aviation news digest - Mar 1963
Aviation news digest - May 1956
Aviation news digest - May 1964
Aviation news digest - Nov 1959
Aviation news digest - Oct 1961
Aviation news digest - Sep 1959
Avro "saucer" is museum piece
Avro 104 Production
Avro 504
Avro 504 booklet
Avro 504K
Avro 552A Viper
Avro 698 Vulcan
Avro 707A and 707B
Avro 720
Avro 748
Avro Acted to Embarrass Gov't-PM - The Canadian Press
Avro Aircraft 1958 Org Chart
Avro Aircraft CF-100
Avro Aircraft Engineering Division - First Level Org Chart
Avro Aircraft Limited, Malton
Avro Aircraft Org Chart
Avro Aircraft since 1908
Avro Aircraft since 1908 - extract
Avro Aircraft's ill-fated C-102 Jetliner displaying the markings of 1950
Avro Airlines staff image
Avro Anson - Canada's Air Force website
Avro Anson Mark II 7401 - Stable, Sensible and Easy to Fly
Avro Arrow
Avro Arrow
Avro Arrow
Avro Arrow
Avro Arrow & Its Contempories
Avro Arrow (CF 105)
Avro Arrow (in miniature) soars again
Avro Arrow - Aftermath
Avro Arrow - An Aviation Chapter in Canadian History
Avro Arrow - Background
Avro Arrow - Black Friday
Avro Arrow - Boeing MIM-10B Super BOMARC
Avro Arrow - Computer Animation
Avro Arrow - Debate in the press
Avro Arrow - Defending the Arrow
Avro Arrow - Design
Avro Arrow - Destruction
Avro Arrow - Deteriorating Situation
Avro Arrow - Jim Floyd recollections Black Friday
Avro Arrow - Mystique
Avro Arrow - Names and Titles of Avro Personnel
Avro Arrow - Oringinal Footage Of The Canadian Icon
Avro Arrow - Post-Arrow Brain Drain
Avro Arrow - Shaky Start
Avro Arrow - Speculation
Avro Arrow - Speech by Fred T. Smye
Avro Arrow - The Boom Years
Avro Arrow - The Cold War Begins
Avro Arrow - The Real Original
Avro Arrow - The Resurrection of a legend
Avro Arrow - Triumph
Avro Arrow - book ad
Avro Arrow - names and Titles of Avro Personnel (AFHC modified version)
Avro Arrow 201 First Flight
Avro Arrow 201 and 203 on ramp (winter image with day-glo)
Avro Arrow 202
Avro Arrow 50th Anniversary
Avro Arrow Assumed Mythic Proportions
Avro Arrow CF-105 Mk. 1
Avro Arrow CF-105 | The Canadian delta winged interceptor aircraft that never was.
Avro Arrow Design
Avro Arrow Documentary
Avro Arrow Feature - The National, CBC, 1997
Avro Arrow Foamie EDF
Avro Arrow Functional Markings on the aircraft - Drawing TD-105-1 Sheet 1
Avro Arrow Functional Markings on the aircraft - Drawing TD-105-1 Sheet 2
Avro Arrow Functional Markings on the aircraft - Drawing TD-105-1 Sheet 3
Avro Arrow Ground Support
Avro Arrow Lithograph ad
Avro Arrow MK 1, 2 view drawing
Avro Arrow MK 1, 3 view
Avro Arrow MKI Revised G/A Stinger (Scheme) Structure Rear Fuselage, Drawing 7-0159-PE-14
Avro Arrow Maiden
Avro Arrow Mk 1
Avro Arrow Mk 1 - sheet 1
Avro Arrow Mk 1 - sheet 1 (Blue on white)
Avro Arrow Mk 1 - sheet 2
Avro Arrow Mk 1 - sheet 2 (blue on white)
Avro Arrow Mk 1 wing loft recreation
Avro Arrow Mk 2, 3 view, Drawing 7-4300-15010
Avro Arrow Model Test Flight
Avro Arrow Model Test Flight 2
Avro Arrow Never Got Off the Ground
Avro Arrow Never got off ground
Avro Arrow Nose Wheel Steering Solenoid Control Valve
Avro Arrow Progress Report - Jan 58
Avro Arrow Quarterly Technical Report for the period ending 30 Sept 1958
Avro Arrow Reunion - International Centre, Malton 26 March 1983
Avro Arrow Revival News
Avro Arrow Roundel tracing
Avro Arrow Thoughts - Potoki/Cope/Jones/Floyd
Avro Arrow Unveiling Ceremony
Avro Arrow airborne equipment identification, AVRO part numbers vers manufacturers part numbers
Avro Arrow at Abbotsford
Avro Arrow at Yarmouth Fun Fly 2015
Avro Arrow comes through maiden flight with 'Flying Colors'
Avro Arrow end
Avro Arrow engine discovered in England
Avro Arrow for Flight Simulator Video Trailer
Avro Arrow ground handling equipment use of Giraffe Model IG40 Report No. 70/GEQ/3
Avro Arrow mystery deepens with U.K. discovery
Avro Arrow on Centre Sage
Avro Arrow pilot dead
Avro Arrow quarterly technical report: for period ending 30 Sept. 1958
Avro Arrow quarterly technical report: for period ending Dec. 31 1957
Avro Arrow quarterly technical report: for period ending June 30 1958
Avro Arrow quarterly technical report: for period ending March 31 1958
Avro Arrow replica sitting in disrepair at Pearson airport
Avro Arrow replica unveiled (2006)
Avro Arrow sheet metal worker was there the day the project died in 1959
Avro Arrow shot down by creative accounting
Avro Arrow test pilot dead at 89
Avro Arrow test pilot recalls Glory Days
Avro Arrow the one that got away Episode 2
Avro Arrow the story from its evolution to its extinction - 1990 edition
Avro Arrow the story from its evolution to its extinction - 2004 edition
Avro Arrow the story from its evolution to its extinction - first edition
Avro Arrow …equipped with Goodyear tires, wheels and breaks… has the best in the world at its "feet"
Avro Arrow's end overshadowed revival of Forces
Avro Arrow, the fascinating rise and demise
Avro Arrow- The Iron Warrior
Avro Arrow... A Short History
Avro Arrow: "There Never Was an Arrow"
Avro Arrow: High Speed Intercepts
Avro Arrow: general information
Avro Arrow: monthly progress report: January 1958
Avro Arrow: monthly progress report: March 1958
Avro BE2C
Avro C-102 "Jetliner"
Avro C-102 Jetliner, Canadian short to medium range jet transport
Avro C-102 Jetliner, Canadian short to medium range jet transport
Avro C-102 Jetliner, Canadian short to medium range jet transport - created 1/1/2000
Avro C-102 Jetliner, Canadian short to medium range jet transport - created 3/22/1998
Avro C-105 Data on L/Dmax and pitchup
Avro C102 Jetliner
Avro CF-100
Avro CF-100 (18300)
Avro CF-100 (FB-D)
Avro CF-100 (including FB-K)
Avro CF-100 Canuck
Avro CF-100 Canuck Aircraft Specification acquired by the RCAF
Avro CF-100 DL-539 and DL-593 flying in formation
Avro CF-100 HG-526
Avro CF-100 Nightfighters at work
Avro CF-100 Specifications for Auto Control for NAE Electro-Thermal Wing De-icing System(Revised)
Avro CF-105
Avro CF-105 Arrow
Avro CF-105 Arrow
Avro CF-105 Arrow Mark 1
Avro CF-105 Arrow Mk. 1
Avro CF-105 Arrow Mk.1
Avro CF-105 Arrow Mk.1 Station and Data Lines
Avro CF-105 Arrow Mk.1 Station and Data Lines
Avro CF-105 Arrow Mk.1 Station and Data Lines (b&w copy on poster paper)
Avro CF-105 Arrow Mk.2
Avro CF-105 Arrow Progress Report as of March 31, 1958
Avro CF-105 Arrow RL201, R/C Model Maiden
Avro CF-105 preliminary ventral fin tests
Avro Canada
Avro Canada - Wikipedia from Dec 11/2009
Avro Canada / Orenda poster
Avro Canada Avrocar
Avro Canada C-102 Jetliner
Avro Canada C-102 Jetliner
Avro Canada C.102 Jetliner
Avro Canada C102 Jetliner
Avro Canada CF-100
Avro Canada CF-100
Avro Canada CF-100 Canuck 1950
Avro Canada CF-100 Fighter
Avro Canada CF-105 Arrow
Avro Canada CF-105 Arrow
Avro Canada CF-105 Arrow
Avro Canada CF-105 Arrow 1958
Avro Canada CF100 MK. 4
Avro Canada Deliveries of Orendas and CF-100's rise as the big Build-Up pays off
Avro Canada Flight staff appointments / Faster Fighter Sought by RCAF for 1956 Delivery
Avro Canada News - April 1951
Avro Canada News - Dec 1950
Avro Canada News - February 1951
Avro Canada News - January 1951
Avro Canada News - Jul 3 1952
Avro Canada News - June 1950
Avro Canada News - Mar 51
Avro Canada News - March 1950
Avro Canada News - May 1950
Avro Canada News - May 51
Avro Canada News - November 1950
Avro Canada News - Oct 51
Avro Canada News - October 1950
Avro Canada News - September 1950
Avro Canada News Jan 52
Avro Canada Plans Varied Program - An Interview with Crawford Gordon, Jr. President
Avro Canada Previews 1950
Avro Canada Project Y
Avro Canada V.T.O. Project Revised General Plan for Wind Tunnel Testing at N.A.E. Ottawa
Avro Canada VZ-9 Avrocar -- Canada's almost working flying saucer
Avro Canada VZ-9V Avrocar
Avro Canada's Flying Saucer: - The VZ-9V Avrocar Flying Disc
Avro Canada: type CF.105: schedule of tests, mock-ups and wind tunnel models
Avro Canuck... CF-100 All Weather Interceptor
Avro Chinook success marks era in Aviation Industry
Avro Companies
Avro Control Stick
Avro Delta
Avro Demolition
Avro Designer Seeks Dream Boat
Avro Employees and NASA
Avro Employees at Possible 10 Year Awards Banquet
Avro Flying Club emblem
Avro Gas Turbine Employee's Recreation Club
Avro Headquarters
Avro Helped pay taxes to prosper Brampton
Avro Heritage Society
Avro Jet Airliner Reaches Final Assembly Line Stage
Avro Jetliner
Avro Jetliner & Arrow Part 1
Avro Jetliner & Arrow Part 2
Avro Jetliner & Arrow Part 3
Avro Jetliner C-102… North America's First Jet Transport
Avro Jetliner Sets New Standard
Avro Jetliner Thills Amercans
Avro Jetliner coming into New York - April 18th 1950
Avro Jetliner in California showing John Thorne, Don Rogers & Bill Wildfong
Avro Jetliner in California showing John Thorne, Don Rogers & Bill Wildfong (climbing up ladder)
Avro Lancaster - British aircraft of Word War II booklet
Avro Lancaster FM209 with Orenda Jet Engines Mounted on Left and Right Wings
Avro Lancaster Takeoff
Avro Lancaster VR-A start up and landing -
Avro Letter to George R. Pearkes, VC from Fred T. Smye
Avro Library Card - NAE LT 32 - Specification for Auto Control for NAE Electro-thermal wing de-icing system
Avro Library Card - NAE LT 34 - Avro CF-100 Specification for NAE Automatic Control for NAE Electro-thermal wing de-icing system
Avro Library Card card - Calculations of the Pitching Trajectory of the Velvet Glove Missile from underwing of CF-100
Avro Library Card card - FR 10B NAE - Pressure Measurements on the upper and lower surface of the nacelle-fuselage fillet of the AVRO CF100 half model
Avro Library Card card - NAE FR 10a - Wake surveys at the tail position of the Avro CF-100 half model M = 0.6 to M = 0.9
Avro Library Card card - Wing Flow tests to determine the effect of the external storage of Four N-44 missiles on the lift, drag & pitching moment characteristics of the Avro CF-100
Avro Lincoln
Avro Lincoln - Sutcliffe Produces a fine 1/72nd scale vacuform kit
Avro Lincoln DND
Avro Lincoln images
Avro Lynx
Avro Malton Plant operated 13 years
Avro Manchester DND
Avro Manchester booklet
Avro Museum Replica Photos from 2005
Avro Museum Replica Photos from 2006
Avro Museum Replica Photos from 2007
Avro Museum Replica Photos from 2008
Avro Museum Replica Photos from 2009
Avro Museum Replica Photos from 2010
Avro Museum open house - Chevron Open Minds School
Avro Museum open house - Image of Rob Brigham with racecar carrying Avro Museum tag
Avro Museum open house - Image of visitors intently watching Museum videos
Avro Museum open house - Image of visitors intrigued by Arrow Flight Simulator
Avro News - 9 Dec 55 - Vol 1 No 22
Avro News - Jan 17 1958
Avro News - Vol 2 No 11
Avro News - Vol 3 No 16
Avro News - Vol 3 No 16
Avro News Oct 4 1957
Avro Newsmagazine - Apr 24 1958
Avro Newsmagazine - July 29, 1958
Avro Newsmagazine - Special Edition Summer 1958
Avro Newsmagazine - Vol 4 No 18
Avro Newsmagazine 10-17-58
Avro Newsmagazine 10-30-58
Avro Newsmagazine 5-14-58
Avro Newsmagazine 6-27-58
Avro Newsmagazine 7-16-58
Avro Newsmagazine Feb 27 1958
Avro Newsmagazine Vol 4 No 11
Avro Newsmagazine Vol 4 No 12
Avro Newsmagazine Vol 4 No 14
Avro Newsmagazine Vol 4 No 15
Avro Newsmagazine Vol 4 No 16
Avro Newsmagazine Vol 4 No 17
Avro Newsmagazine Vol 4 No 4
Avro Newsmagazine Vol 5 No 1
Avro Newsmagazine Vol 5 No 1
Avro Newsmagazine Vol 5 No 2
Avro Newsmagazine Vol 5 No 3
Avro Newsmagazine Vol 5 No 4
Avro Newsmagazine Vol. 4 No. 13 Sept 26, 1958
Avro Newsmagazine Vol. 4 No. 13 Sept 26, 1958
Avro Ottawa Talks fail - to try again
Avro Pilots
Avro Project Saucer Film Resource List
Avro Recreation Club Hockey team
Avro Shackleton - Warbird Deluxe
Avro Shackleton AEW
Avro Shackleton MR
Avro Test - Pilot F/L Bruce Warren
Avro The history of an Aircraft Company
Avro The history of an Aircraft Company
Avro Tools Mk.IV CF-100
Avro Township won't ask Moratorium
Avro Triplane 1909
Avro Tudor history
Avro Tudor to be made here
Avro Type 707
Avro UK Ashton
Avro UK Athena
Avro UK Atlantic
Avro UK Avian
Avro UK ads
Avro UK assorted stories
Avro VZ 9 Avrocar
Avro VZ 9 Avrocar
Avro Vulcan
Avro Vulcan "Black Buck" booklet
Avro Vulcan - 1/48 scale
Avro Vulcan booklet
Avro Vulcan image
Avro Wright
Avro York
Avro aircraft & Cold War Aviation
Avro and the Aviator
Avro announces order totalling $65,000,000 for Orenda jet engines / Up She Zooms - image of JATO CF-100
Avro arrow, The Top Secret Supersonic Jet that never saw the light of day - part of Secrets of the Exhibit series
Avro cartoon
Avro comments on crewman's leg clearance ejection tests
Avro design floor
Avro fires 200 fear shutdown
Avro image 46296
Avro image 54500
Avro image 55136
Avro image 62822
Avro image 63421
Avro image 67225
Avro image 68401
Avro image 68704
Avro image 69694
Avro image 70208
Avro image 70511
Avro image 70658
Avro image 70796
Avro image 72124
Avro image 73901
Avro image 74585
Avro image 74599
Avro image 74684
Avro image 76610
Avro image 76611
Avro image 76623
Avro image 79053
Avro image 79066
Avro image 79223
Avro image 79223 - zoomed in
Avro image 79224
Avro image 79888
Avro image 80179
Avro image 80179 - negative
Avro image 80185
Avro is blamed for layoffs by PC member
Avro lays off Arrow Test Pilots
Avro letter to & from CD Howe
Avro releases its Arrow
Avro should carry On
Avro story anything but straight
Avro story anything but straight as an arrow
Avro story more myth than reality
Avro to Make Jet Engines
Avro's CF-105 Arrow
Avro's Fallen Arrow
Avro's New Chief Engineer, Avrocar Flies
Avro's New Skin Mill
Avro's chief in Secret Ottawa talks
Avro's plan gives new look to industry
Avro's technical team saved
Avro-Orenda unions bosses to see Frost
AvroCar - Avro's "Flying Saucer"
AvroLand - The Orenda - Nobel Family
AvroLand - The Orenda Family
Avrocar
Avrocar & Associated Subjects Bibliography - Reports, Publications, Articles
Avrocar (VZ-9AV) Flight test plan - 15 July 1959
Avrocar - Canada's Flying Saucer
Avrocar - how not to build a flying saucer
Avrocar Continuation Test Program Avrocar 1, U.S. Army Designation VZ-9AV, Progress Report No. 3 500/PROG/6
Avrocar Continuation Test Program and Terrain Test Program, 06/01/1960 - 06/14/1961
Avrocar Continuation Test Program, Instrumentation Specification for AMES Tunnel Tests, 1st AVROCAR Vehicle, 500/AERO Test/415, Issue 2
Avrocar Continuation Test Program, Specification for Phase 2 Tests of an Avrocar in the 40 x 80 Foot Wind Tunnel at N.A.S.A., AMES Research Center, 500/AERO Test/405, Issue 2
Avrocar Documentary - 21 Feb 2015
Avrocar Flight Evaluation, Air Force Flight Test Center, Edwards Air Force Base, California, Air Force Systems Command, United States Airforce
Avrocar Image - USATM #A1425
Avrocar Image - USATM #M0219
Avrocar Image - USATM #M0220
Avrocar Image - USATM #M0221
Avrocar Image - USATM #M0222
Avrocar Image - USATM #M0223
Avrocar Image - USATM #M0224
Avrocar Image - USATM #M0225
Avrocar Images
Avrocar Security
Avrocar VZ-9V drawing
Avrocar and Project Silverbug
Avrocar large-scale wind tunnel tests
Avrocar! Saucer Secrets from the Past
Avroland - The Avro Family
Avroland Employee List
Avromobile - a new family of AIR VEHICLES, Avrotruck, Avrocoach and Avrocar
Avromobile Avrocar VZ-9AV Program Planning Report
B&W Image of Arrows 201/202 being fueled
B-47 Stratojet with Orenda Engine Mounted to Aft Fuselage
B-58 Hustler
BLACK FRIDAY and Secret Toronto: Braircrest
BRAKE TESTS; RFT 5055
BRAKING SYSTEM TESTS ON A/C 25203, RFT 07-5095 Add. 1
BRAKING- SYSTEM TESTS ON A/C 25202
Back and White photo of Arrow RL-201 on the Ground - full right side image
Back and White photo of Arrow RL-201 on the Ground - taken from right side - near ground
Back and White photo of Arrow RL-201 on the Ground, with staff parking in the background
Back and White photo of RL-201 just Lifting off
Backing up NATO
Backyard clunk
Bad guys
Baddeck crash Mars anniversary opf flight
Badge of Honor for the Voodoo
Balance Sheet of Avro Aircraft Limited as at July 31, 1959
Balck and White 8.5"x11" Photo of 5 Avro Employees Greeting CF-100 Pilot Peter Cope as he Descends Ladder
Ballantyne immigration photo
Barnes creates stand for Arrow
Basic Design
Battle To Save the Birthplace of a Dream
Behind the Scenes - these men
Belgium chooses the AVRO CF-100 over all others
Bennetts Tudors
Better ATC Must Come Soon, Quesada Tells CAI-IAS Meeting
Bevel Gear Assembly
Bevel Gear Projection
Big Program announced by Pearkes
Big Wheel Transporter
Bill Kuzyk employment letter
Bill Trbovich note on Arrow Demise
Binder of photos related to Allan Jackson's replica in Winnipeg for the CBC movie
Birthplace of Jet Power
Black Brant Missile
Black Friday
Black Friday aftermath news
Black Lightning
Black and White 5"x7" Photo of Avro Jetliner Parked on Apron
Black and White 5"x7" Photo of Avro Jetliner and CF-100 Canuck in front of Hangars
Black and White 5"x7" Photo of Avro Jetliner in Flight
Black and White 5"x7" Photo of Large Group of Avro Employees in front of Partly Finished Jetliner
Black and White 5"x7" Photo of Overhead Shot of CF-100 18102
Black and White 5"x7" Photo of Overhead Shot of CF-100 FB-D
Black and White 5'x7" Photo of 3 CF-100's Flying in Line Abreast Formation - JFO, JFR & JFS
Black and White 6"x8" Photo of Avro CF-100 on Ramp at Boston Logan Airport prior to airshow - Aug 1950
Black and White 8"x10" Photo of Avro Assembly Hangar with CF-100, Jetliner and F-86 Sabre
Black and White 8'x10" Photo of Avro Jetliner in Flight Prior to Final Paint Job
Black and White 8.5"x11" Photo of CF-100 Canuck 18300 in Flight
Black and White Photo of 5"x7" Photo of Avro Jetliner after a Wheels Up Landing on Grass
Black and White Photo of Avro Jetliner in Flight over Manhattan, New York
Blackest news since world war
Blame for Avro Firings
Blank blue print paper - copy 1
Blow to Industry, says executive of association
Blown to life at 50 ft
Blueprint of Blanking Die - Washer Tab Tool No. 1-D-260319 Part 73205
Blueprint of Brazing Fixture - Inlet Drain Valve Sub-Assy. Tool No. 1-F-261171 Part 70885
Blueprint of Broach Holder & Blade Assembly Tool No. 1-T-030140 Part 64195
Blueprint of Broaching Fixture - 6,7,8 & 9 Stator Blades - Sheet 2 of 4 Tool No. F-461360 Part 87316, 7,8 87289
Blueprint of Broaching Fixture - 6,7,8 & 9 Stator Blades - Sheet 4 of 4 Tool No. F-461360 Part 87316, 7,8 87289
Blueprint of Form Die (Six at Once) - Washer Tab Tool No. 1-D-260320 Part 73205
Blueprint of Grinding Fixture - 1st Stage Compressor Sheet 1 of 4 Tool No. 1-F-032026 Part 65785
Blueprint of Internal Grinding Fixture (Female Coupler) Sheet 1 of 5 Tool No. 1-F-190341 Part 60369
Blueprint of Milling Fixture (Details) - Turbine Rotor Shaft - Sheet 2 of 5 Tool No. 1-F-031948 Part 70136
Blueprint of Milling Fixture (details) - Turbine Rotor Shaft - Sheet 1 of 5 Tool No. 1-F-031948 Part 70136
Blueprint of Milling Fixture - Details - Turbine Rotor Shaft -Sheet 3 of 5 Tool No. 1-F-031948 Part 70136
Blueprint of Milling Fixture - Details - Turbine Rotor Shaft -Sheet 4 of 5 Tool No. 1-F-031948 Part 70136
Blueprint of Milling Fixture - Details - Turbine Rotor Shaft -Sheet 5 of 5 Tool No. 1-F-031948 Part 70136
Blueprint of Milling Fixture Details - 7th Stage Rotor Disc - Sheet 5 of 5 Tool No. 1-F-023683 Part 65915
Blueprint of Milling Fixture Mill 15 Slots in Disc - 7th Stage Rotor Disc (sheet 2 of 5) Tool No. 1-F-023683 Part 65915
Blueprint of Milling Fixture Mill 30 Teeth in Disc - 4th Stage Rotor Disc Tool No. 1-F-023681 Part 65936
Blueprint of Milling Fixture for 7th Stage Rotor Disc Tool No. 1-F-023683 (Drawing 1 of 5)
Blueprint of Target Fixture - Compressor Casing - Sheet 1 of 20 Tool No. 1-F-011531 Part 70072
Blueprint of Wheel Dresser - Turbine Blades - Sheet 2 of 5 Tool F-461194
Blueprint, reduced - Interior Arrangement Drawing P25-4TJ ORPHEUS 6
Blueprint, reduced - P25 Cabin Layout...DWG No. P25/17
Blueprint, reduced - P25-2TF RB141 Exterior 3-view
Blueprint, reduced - P25-2TF-RB141 Three View
Blueprint, reduced - P25-3TF-JJF 10A1 Exterior 3-view
Blueprint, reduced - P25-3TF-JJF 10A1 Interior Arrangement
Blueprint, reduced - P25-3TF-JJF 10A1 Interior Arrangement (image slightly zoomed)
Blueprint, reduced - P25-3TF-JJF 10A1 Three View
Blueprint, reduced - P25-4TF-Orpheus 6 Three View
Blueprint, reduced - Three View
Blueprints
Bob Crosby notes
Boeing would study Avro bids on Bomarc
Bomarc
Bomarc Image
Bomarc Launch
Bomarc Launch with 2 on wing
Bomarc away
Bomarc missile crisis
Bomarcs and Arrows
Book extract - Fifteen Men - Canada's Prime Ministers from Macdonald to Trudeau
Boosting Brainpower at Avro
Boring Fixture - Expansion Chamber Tool No. 1-F-200383 Part 69720
Boring Fixture for Expansion Chamber Drawing 1-F-200383 Issue 5
Both Dowty Equiped
Box of 50 5/8 x 2 Bolts (not opened) with original Avro label
Brake Seizure Mars Arrow Flight
Brave Conduct
Briarcrest Manor
Briarcrest Manor Bore Witness the the Fall of the Avro Arrow
Brief Avro C-102 Jetliner Model Specifications
Brief Summary of First Arrow Progress to Date
Brief summary of low speed wind tunnel tests at N.A.E. .07 scale CF-105 model
Brief summary of progress of first arrow aircraft 25201
Briefs - Feb 1959
Bring Down The Arrow - A 30 Year Perspective
Bringing down the Arrow: A 30-Year Retrospective
Bristol Engine for Vulcan
Britain Calling - Aug 1948
Britain Calling - Dec 1950
Britain Calling - Mar 1950
Britain Calling - Nov 1948
Britain Calling - Oct 1949
Britain Wins Jet-Liner Race, Bests Canada by Few Days
Britain calling - Feb 1951
Britain calling - Jul 1948
Britain calling - Nov 1950
Britain calling - Sep 1950
Britian Calling - 1950
Britian Calling - Apr 1951
Britian Calling - May 1949
British Air show hails age of turbine power
British Engines
Broaching Fixture for 6,7,8 &9th Stator Blades - Tool F-461360 Sht 3 of 4
Brochure "Avro Aircraft Limited"
Brochure 0-1 Description of oxygen system for CF-105 supersonic all weather fighter
Brochure E4-A Description of Electrical System for CF-105 part 1
Brochure E4-A Description of Electrical System for CF-105 part 2
Brochure E4-A Description of electrical system for CF-105, supersonic all weather fighter
Brochure F.C. Description of flying control system for CF 105: supersonic all weather fighter
Brochure F.C. Description of flying control system for CF 105: supersonic all weather fighter
Brochure H1, A Revision Description of flying controls hydraulic systems for CF-105 supersonic all weather fighter
Brochure L.P.-1 Low pressure pneumatic system for CF-105 all weather fighter
Broken Arrow
Broken Arrow
Broken Arrow - Fifty Years
Broken Arrow - Flight into disaster the Avro Arrow story
Broken Arrow /Making a myth of the Avro Arrow / What's the plane truth / A Flight of Fancy
Broken Arrow, Empty Quiver
Broken Arrow, broken dream
Bruderheim resident connects with museum about his father's secret Avro Arrow ties
Builders Cherish Arrow Jet Replica
Building a Manned Missile
Building the Arrow - Aviation Videos
Building the Avro Arrow ...again
Building, flying and servicing Canada's new technical aircraft
Bunkers Bunkers Everywhere
Bushing - Nose landing gear
Business Trends - Aug 1956
Business Trends - Jan 1958
Business Trends - July 1956
Business Trends - Nov 1956
Business Trends - Nov 1957
Business Trends - Oct 1957
Business and Private - Jun-1959
Business and Private -Jun 1959
Business trends - Feb 1957
C 105 Aerodynamic Test Program
C 105 Rear fuselage skinning (stn. 742·5-803) - Report No. 7-0559-7
C 105. Derivation of loads for wing design cases. Report 7/0500/16
C Gordon letter to CD Howe
C Gordon letter to CD Howe - RE: CF-100 and Orenda engine delivery details
C-100D / TR 9 - drawing SK 20002
C-102 Avro Jetliner
C-102 Jetliner
C-102 Jetliner - Horizontal Stabilizers - (2 view) part 1 (TL161A-003)
C-102 Jetliner - Horizontal Stabilizers - (2 view) part 2 (TL161B-003)
C-102 Jetliner - Painting and Explanation
C-102 Jetliner - Vertical Stabilizer - (2 view) - part 1 (RL172A / TL161-0002A)
C-102 Jetliner - Vertical Stabilizer - (2 view) - part 2 (RL172B/TL161-0002B)
C-102 Jetliner - three view used as direct input for building of a model
C-102 Jetliner - three view used as direct input for building of a model - includes spec details top left
C-102 Jetliner - three view used as direct input for building of a model - updated 3/27/1998
C-102 Jetliner - three view with engine details
C-102 Jetliner Flight Manual (1st prototype only), Section 1, Chapters 1-8 plus Sections 2-5
C-102 Jetliner Flyover
C-102 Jetliner front view of Nacelles
C-104 / TR 9
C-104/1 Supersonic All-Weather Fighter Proposal No. 1 Single Engine Aircraft
C-104/2 Supersonic All-Weather Fighter Proposal No. 2 Twin Engined Aircraft
C-105 - 2 view - front and side - on ground
C-105 - 2 view - half top (with wing notch) & taking off
C-105 - 2 view - top and side (taking off with wheels down)
C-105 - 2 view / front & top
C-105 - 2 view / top & side
C-105 - 3 side views
C-105 - 4 view
C-105 .04 series III tests. Extract from P/Wind Tunnel/79: CM and CD versus CL
C-105 / 1100 3 view
C-105 / 1200
C-105 / 1200 T 3View
C-105 / 1300
C-105 0.03 Langley W/T tests: M = 1.41 April 1956: plots
C-105 1st A/C with J75 P3 engines: weight & C.G. summary, Dec. 1/56 Report No. 7-0400-44 Issue 1
C-105 Aircraft Breakdown and Personnel Responsible for various components
C-105 Aircraft Index Sequence, drawing 4300-PE-2
C-105 Aircraft Index Sequence, drawing 4300-PE-2
C-105 Analysis of heavy frame sta. 697. Report 7-0558-4 Issue 3
C-105 C.A.L. tests Sept. 1953 Comparison of estimates with wind tunnel results Report No. P/Wind Tunnel/9
C-105 C.A.L. tests Sept. 1953 corrected plots Report No. P/Wind Tunnel/7
C-105 C.A.L. tests Sept. 1953 derivatives and zero values Report No. P/Wind Tunnel/8
C-105 C.A.L. wind tunnel tests August 1954: corrected plots Report No. P/Wind Tunnel/39
C-105 C.A.L. wind tunnel tests August 1954: derivatives and zero values Report No. P/Wind Tunnel/40
C-105 C.A.L. wind tunnel tests October 1954: configuration and Reynold's number investigations Report No. P/Wind Tunnel/52
C-105 C.A.L. wind tunnel tests October 1954: corrected plots Report No. P/WT/49
C-105 C.A.L. wind tunnel tests October 1954: derivatives: comparisons and extrapolations Report No. P/Wind Tunnel/51
C-105 C.A.L. wind tunnel tests derivatives & zero values October 1954 tests Report No. P/Wind Tunnel/50
C-105 C.A.L. wind tunnel tests: April 1954: corrected plots Report No. P/Wind Tunnel/19
C-105 C.A.L. wind tunnel tests: corrected plots Report No. P/WT/29
C-105 C.A.L. wind tunnel tests: series 111: June 54: derivatives & zero values Report No. P/WT/30
C-105 Centre Fuselage Breakdown
C-105 Centre Fuselage General Assembly
C-105 Comparison of .03 Langley wind tunnel results with C.A.L. results and estimates
C-105 Complete Proposed Assemblies Using Narmco 4021 Metlbond technique Sheet 1/2, Drawing 7-4400-C/S-PE-01
C-105 Control surface limitations due to maximum available hinge moments, and sideslip limitation due to maximum permissible fin load
C-105 Cut-outs in duct. Report No. 7-0558-38
C-105 Deflection formulas: former, spar, strut assembly. Report No. 7-0558-8
C-105 Derivatives and zero values. Volume I: longitudinal stability and control Report No. P/W.T./20
C-105 Derivatives and zero values. Volume II: lateral stability Report No. P/Wind Tunnel/20
C-105 Derivatives and zero values. Volume III: lateral control Report No. P/WT/20
C-105 Derivatives and zero values. Volume IV: drag data Report No. P/Wind Tunnel/20
C-105 Detail stress analysis. Report No. 7/0558/82
C-105 Dive Brake Performance
C-105 Duct and engine bays Report No. 7/0510/12
C-105 Elastic lateral stability derivatives in level flight: L.E. droop, notch and extension
C-105 Engine manifold access panel Report No. 7/0558/50
C-105 Fin analysis Report No. 7/0510/10
C-105 Fin: detail stressing of hinge fittings and adjacent structure - Report No. 7/0583/12
C-105 Flow Diagram Center Fuselage
C-105 G.A Fuel System Tanks #1 & 2 CENTRE FUSELAGE
C-105 Interchangeability Features
C-105 Lateral stability derivatives in 2 "G" flight: wing notched and extended
C-105 Lateral stability derivatives in 4 "G" flight: wing notched and extended
C-105 Lateral stability derivatives in level flight: wing notched and extended
C-105 Lateral stability derivatives: wing notched and extended: cross-plots
C-105 Loading Sequence Final Assembly Fixture , Drawing 7-4200-PE-1
C-105 Longitudinal and lateral stability derivatives: extrapolated to M=2.0: comparison of theoretical estimates with C.A.L. wind tunnel tests: April 1954 Report No. P/Wind Tunnel/21
C-105 Longitudinal and lateral stability derivatives: extrapolated to M=2.0: comparison of theoretical estimates with C.A.L. wind tunnel tests: June 1954 Report No. P/WT/31
C-105 Longitudinal stability derivatives and drag data: 3.5% wing
C-105 Low Speed model 0.07 scale
C-105 MAGNESIUM SKINS IN - NOSE-CENTRE FUSELAGE & POWER PLANT BAY
C-105 MK 1 with J75 P3 engines 1st A/C: weight & C.G. summary, Feb. 1/57 Report # 7-0400-44 Issue 2
C-105 MK 1 with J75 P3 engines 1st A/C: weight & C.G. summary, Mar. 1/57 Report # 7-0400-44 Issue
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, Apr. 1/57 Report # 7-0400-44 Issue 4
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, July 1/57 Report # 7-0400-44 Issue 7
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, June 1/57 Report # 7-0400-44 Issue 6
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, May 1/57 Report # 7-0400-44 Issue 5
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, Nov. 1/5 Report # 7-0400-44 Issue 11
C-105 MK 1, J75 P3 engines: weight summary & C.G. position, Sept. 1/57 Report # 7-0400-44 Issue 9
C-105 MK 1, J75 P3 engines: weight summary and C.G. position, Aug. 1/57 Report # 7-0400-44 Issue 8
C-105 MK 1, J75 P3 engines: weight summary and C.G. position, Oct. 1/57 Report # 7-0400-44 Issue 10
C-105 MK 2 production A/C: weight and C.G. summary, Nov. 1/57 Report No. 7-0400-34 Issue 13
C-105 MK 2 production A/C: weight and C.G. summary, Oct. 1/57 Report No. 7-0400-34 Issue 12
C-105 MK 2 production A/C: weight summary and C.G. position, Apr. 1/57 Report No. 7-0400-34 Issue 6
C-105 MK 2 production A/C: weight summary and C.G. position, Aug. 1/57 Report No. 7-0400-34 Issue 10
C-105 MK 2 production A/C: weight summary and C.G. position, Feb. 1/57 Report No. 7-0400-34 Issue 4
C-105 MK 2 production A/C: weight summary and C.G. position, July 1/57 Report No. 7-0400-34 Issue 9
C-105 MK 2 production A/C: weight summary and C.G. position, June 1/57 Report No. 7-0400-34 Issue 8
C-105 MK 2 production A/C: weight summary and C.G. position, Mar. 1/57 Report No. 7-0400-34 Issue 5
C-105 MK 2 production A/C: weight summary and C.G. position, May 1/57 Report No. 7-0400-34 Issue 7
C-105 MK 2 production A/C: weight summary and C.G. position, Sept. 1/57 Report No. 7-0400-34 Issue 11
C-105 Master Models, Drawing 4300-PE-6
C-105 Mk 2 Production Aircraft - Report of Weight Changes - Report # 7-0400-34 issue 10
C-105 Mk 2 Production Aircraft - Report of Weight Changes - Report # 7-0400-34 issue 9
C-105 N.A.E. low speed W/T tests July 1956
C-105 N.A.E. low speed wind tunnel tests July 1956: basic plots
C-105 N.A.E. low speed wind tunnel tests. Variation of lateral derivatives with α (Alpha degrees)
C-105 N.A.E. spinning tunnel tests. Run schedule
C-105 Open canopy effects
C-105 Overboard air bleed cutout and support structure: sta. 630 - 634·8. Report No. 7-0558-79
C-105 Pratt &Whitney J-75 Engine Installation Description
C-105 Preliminary comparison of flying qualities of CF-105 with those required by United States specification MIL-F-8785 (ASG)|C-105.
C-105 Preliminary investigation centre fuselage torsion Report No. 7/0554/12
C-105 Preliminary investigation: rear fuselage - Report No. 7-0558-45
C-105 Production Engineering Brochure
C-105 Results from R.T. 08-265 & R.T. 08-276|C105. Section 1: Results from RT 08-265: static & fatigue strengths of butt joints. Section 2: Results from RT 08-276: static & fatigue strengths of skin splices Report No. 7/0500/9
C-105 Right Half Centre Fuselage, Illustrative of Left & Right Hand Side
C-105 Stinger Assy Rear Fuselage Structure STA 803 to STA 849 S, Drawing 7-0159-73 PE-73
C-105 Structural tests Report No. 7/0500/10
C-105 Structural tests Report No. 7/0500/10
C-105 Summary of Free Flight Model Tests & Results (F.F.M. #1 to F.F.M. #7) Report P/F.F.M./47
C-105 Summary of free flight model tests 7 results (F.F.M. #1 to F.F.M. #7) Report No. P/F.F.M./47
C-105 Test loads: R.P.O. case Report No. 7/0500/8
C-105 Towing equipment - Report No. LOG/105/21
C-105 Unloading Sequence Final Assembly sheet 2 of 2 Drawing 7-4200-PE-1
C-105 Wing center box: (fin attachment to wing) Report No. 7/0562/9
C-105 Wing structural detail. Scale 1/24
C-105 With J75 Engiens as Interim Power Plant - Revised Weight & C.V. Report Issue 19
C-105 air conditioning cockpit leak rate
C-105 air conditioning system ground tests
C-105 areas of interest to NAE
C-105 dive brake performance
C-105 elevator Report No. 7/0582/1
C-105 noise: report on Jet Noise Symposium, June 23, 1956
C-105 standard aircraft characteristics with 2 JT 4A-25 engines
C-105 standard aircraft characteristics with 2 P.S. 13 engines
C-105 structure
C-105 with J67 engines preproduction & production: weight summary|C-105 with J67 engines preproduction and production: weight summary
C-105 with J75 Engines as Interim Power Plant - Revised Weight and C.G. Estimate issue 18
C-105 with J75 Engines as Interim Power Plant - Revised Weight and C.G. Report issue 24
C-105 with J75 Engines as Interim Power Plant - Revised Weight and C.G. Report issue 25
C-105 with J75 Engines as Interim Power Plant 1st A/C - issue 2
C-105 with J75 P.5 engines as interim power plant: weight summary and C.G. position, Dec. 1/56 Report # 7-0400-05 issue 27
C-105 with J75 PS Engines as Interim Power Plant - Issue 27
C-105 with J75 PS Engines as Interim Power Plant - Weight changes to report 7-0400-05 Issue 26 - Issue 27
C-105 with J75 production engines: weight summary & C. G. position, July 8/55|C-105 with J75 production engines: weight summary and C. G. position, July 8/55
C-105 with J75 production engines: weight summary & C. G. position, Sept. 1/55|C-105 with J75 production engines: weight summary and C. G. position, Sept. 1/55
C-105 with J75 production engines: weight summary & C.G. position, Dec. 1/55 Report No. 7-0400-05 Issue 21
C-105 with J75 production engines: weight summary & C.G. position, Feb. 1/56|C-105 with J75 engines as interim power plant: weight summary and C.G. position, Jan. 1/56 Report # 7-0400-05 Issue 23
C-105 with J75 production engines: weight summary & C.G. position, Jan. 1/56|C-105 with J75 engines as interim power plant: weight summary and C.G. position, Jan. 1/56 Report # 7-0400-5 Issue 22
C-105 with J75 production engines: weight summary & C.G. position, Mar. 1/56|C-105 with J75 engines as Interim power plant: weight summary and C.G. position, Mar. 1/56 Report No. 7-0400-05 Issue 24
C-105 with J75 production engines: weight summary & C.G. position, May 1/56|C-105 with J75 engines as Interim power plant: weight summary and C.G. position, May 1/56 Report # 7-0400-05 Issue 26
C-105 with J75 production engines: weight summary & C.G. position. / C-105 With J75 Engines as interim power plant Apr. 1/56 Report No. 7-0400-05 Issue 25
C-105 with J75 production engines: weight summary and C.G. position, Nov. 1/55 Report No. 7-0400-50 Issue 20
C-105 with J75 production engines: weight summary and C.G. position, Oct. 1/55. Report # 7-0400-05 Issue 19
C-105 with PS 13 engines: weight summary & C.G. position, Dec. 1/56 Report No. 7-0400-34 Issue 3
C-105. Area rule progress report|C-105 drag estimation.
C-105: a note on stability
C-105: areas of interest to NAE
C-105: preliminary wind tunnel tests on the effect of icing
C-105Mk 1 with J75 P3 Engines 1st Aircraft - issue 7
C-105Mk 1 with J75 P3 Engines 1st Aircraft - issue 8
C. David Morgan w/ compressor disc
C.105 aerodynamic test program
C.A.L. Tests September 1953 Comparison Of Estimates With Wind Tunnel Results. Report No. P/Wind Tunnel/9
C.D. Howe a biography
C.G. envelopes with J75 A25 & PS 13 engines fitted & Full MX 1179 Radar
C/W complete with all skins including access door and bonded s/a, drawing 7-1064-3-PE-5
C102 Jetliner photo file
C103 / TR9 - SK20155 proposal
C104 / Sa4 Three View - SK20312 proposal
C104 / Sa4- SK20308 proposal
C105 - Rocket - SK20309 proposal
C105 / 1000
C105 / 1400
C105 / 750
C105 / 900
C105 / TR9 - SK20000 proposal
C105 Aileron loads and preliminary strength check Report No. 7/0574/1
C105 Basic data for stressing Report No. 7/0500/1
C105 C/105 fin: summary of analysis. Report No. 7/0510/1
C105 Centre fuselage stringer and longeron end loads and skin shears Report No. 7/0554/5
C105 Fin engineer's bending distribution Report No. 7/0583/17
C105 Final Assembly Optical Check, Drawing 7-4200-1-AJ-45
C105 Hydraulic access door and structures
C105 Landing gear design cases Report 7-0590-2003
C105 Landing gear, prediction of ground reactions (M/U) - Report No. 7/0590/1
C105 Lateral stability derivatives (rigid) - extended wing
C105 Lateral stiffness of fuselage formers and adjacent wing structure. STN. 644·43, 697·28, 742·50, 538·77, 485·00 Report No. 7-0558-61
C105 Longitudinal derivatives rigid - extended wing
C105 Longitudinal stability derivatives and drag data 3.5% wing
C105 Lower fin stress distribution by modifying matrix stresses (C.P. aft) Report No. 7/0583/2
C105 Main landing gear forcing function analysis by means of a CADAC computer - Report No. 7/0590/2011
C105 Matrix ribs - Report No. 7/0583/16
C105 Nose Section
C105 Nose Section Fuselage 1/2 Shell & Nacelle Assy, Drawing 7-1052-PE22
C105 Nose Section, Fuselage 1/2 Shell Assy, Drawing 7-1052-PE21
C105 One-way cooling air vents Report No. 7/0558/67
C105 Outer wing skin panels: main box: detail stressing (including attachment of skin to strs.). Report No. 7-0564-31
C105 Preliminary extract from wind tunnel and stability reports: elastic lateral derivatives. Issue 2
C105 Spar, rib and skin stresses Report No. 7/0583/8
C105 Summary of centre fuselage analysis Report No. 7/0510/9 Summary
C105 Torsion box B.L. 18.5 loading. Report No. 7-0558-12 Issue 2
C105 Trim angles and flight envelope limitations (elastic A/C)
C105 Wing analysis Report No. 7/0510/7 Vol I
C105 Wing analysis. Report No. 7/0510/2 (Extract)
C105 complete aircraft sling - Report No. LOG/105/48
C105 no title : drawing tracing
C6951
C8864
C8960
CAHS document list
CAHS meeting - Oct 3, 1972
CALIBRATION OF HINGE MOMENT LIMITER
CANADA and the U.S.A. A view from the front seat
CANADA joins the leaders of Jet Flight
CARL Where Ingenuity is a Business
CASI log - Vol 8 No 5
CBC Arrow First Flight 1958
CBC Has Run Out of Friends
CBC Movie - The Arrow - Remote Control memo
CBC Original 201 first flight
CBC probe calls Arrow's death an error
CBC's "The Arrow"
CD Howe
CD Howe letter
CD Howe letter to & from Brooke Claxton
CD Howe letter to Brooke Claxton
CD Howe letter to C Gordon RE: 70 Mk 3 CF-100's delivered and first Mk. 4 on schedule
CD Howe letter to C Gordon RE: Fleet Aircraft and subcontracting for Avro
CD Howe letter to C Gordon RE: overhead at 200%
CD Howe letter to C Gordon RE: photo of shipment of first five Orendas to Canadair
CD Howe letter to F. Smye
CF 105 Digital Computation of Response using an Approximation to Lateral Damper System
CF 105 Digital Computation of Response using an Approximation to Pitch Damper System
CF 105 Digital Computation of Response using an Approximation to Pitch Damper System
CF-100
CF-100
CF-100
CF-100 - Service Manual misc Sections
CF-100 Angels 40
CF-100 Canuck
CF-100 Canuck 18300 in flight
CF-100 Canuck Mk 4 cutaway
CF-100 Canuck Roll-out
CF-100 Canuck over Isle of Wight, Piloted by Jan Zurakowski, Farnborough Airshow note: Donor tag states CF-100 White Cliffs of Dover
CF-100 Delivered
CF-100 Manual
CF-100 Mk 4
CF-100 Mk 4 Structure
CF-100 Mk 4 at The Imperial War Museum - Duxford, England
CF-100 Mk 5 Drawing
CF-100 Mk 5 wing tests
CF-100 Mk. 4 Structure
CF-100 Negative image, with corresponding positive of A/C 335 lifting off
CF-100 Negative image, with corresponding positive of four A/C flying in formation
CF-100 Negative image, with corresponding positive of three A/C (326, 332, 335) flying in formation
CF-100 OTU
CF-100 Returned
CF-100 Simulation
CF-100 crash
CF-100 development Astra
CF-100 exploded views
CF-100 flies into export fields
CF-100 image
CF-100 image showing wing pod containing instruments which detect incoming missiles through the use of infra-red radiation & image of Velvet glove
CF-100 image with "High Flight" poem
CF-100 image with High Flight poem
CF-100 in a loop
CF-100 now packs deadly rocket punch
CF-100 stunts startle viewers at UK airshow
CF-100 w/ Ron Fischer and unidentified man in flight gear next to Canuck 18392
CF-100 with JATO
CF-100 with JATO flown by Peter Cope
CF-100 with iceguards
CF-100's in New NATO Strategy
CF-100's of 414 Sqn
CF-100, Sabres at open house, Canada jets wows US experts
CF-100: the end of a dream
CF-104 12760 NAM Negative 26913
CF-104: Variations on a theme
CF-105 "Avro Arrow" Mk 1
CF-105 #RL201 on Ground-Side View
CF-105 - Instrumentation - Issue 7; Flying Control Hydraulics
CF-105 - Instrumentation - Issue 7; Flying Control Hydraulics
CF-105 - Instrumentation - Issue 7; Fuel System
CF-105 - Instrumentation - Issue 7; Fuel System
CF-105 - Instrumentation - Issue 7; Utility Hydraulics
CF-105 - Instrumentation - Issue 7; Utility Hydraulics
CF-105 .07 scale Sparrow II jettison tests: N.A.E. low speed wind tunnel: February 1957
CF-105 .07 scale model. N.A.E. low speed reduction data Report No. P/WT/116
CF-105 / J67 based on drawing 7-0100-1
CF-105 / RB - 106 3 View - drawing SK 20785
CF-105 1/24 Arrow data drwg. - from Internet
CF-105 Access door investigation - Report No. LOG/105/10
CF-105 Air Conditioning and Pressurization Description and Drawings
CF-105 Armament Installation Review of Experimental and Analytical program
CF-105 Arrow
CF-105 Arrow #RL201 on Ground
CF-105 Arrow First Figures
CF-105 Arrow Programme - Decisions and Determinants - Russell Isinger
CF-105 Arrow Wing Ordinance & Rib Details
CF-105 Automatic disconnect couplings connecting ground energizer to aircraft - Report No. LOG/105/4 Issue 2
CF-105 Avro Arrow
CF-105 Avro Arrow - Interactive CD-ROM and Picture CD
CF-105 Avro Arrow Colour Scheme
CF-105 Avro Arrow Enthusiast Edition
CF-105 Avro Arrow Wind Tunnel testing
CF-105 Avro Arrow painting
CF-105 Avro Arrow the best fighter jet design for Canada ?
CF-105 Damping System Development-Issue 2
CF-105 Digital Computer Determination of Lateral Derivatives from Oscillatory Flight Tests
CF-105 Digital Computer Determination of Lateral Derivatives from Oscillatory Flight Tests
CF-105 Digital Computer Determination of Longitudinal Derivatives from Oscillatory Flight Tests
CF-105 Digital Computer Determination of Longitudinal Derivatives from Oscillatory Flight Tests
CF-105 Displays Advanced Engineering in rollout
CF-105 Elastic longitudinal derivatives
CF-105 Engine Intake Design
CF-105 Engine Running on the Ground - Report No. LOG/105/30
CF-105 Environmental requirements for mobile ground power units - Report No. LOG/105/13
CF-105 Flying Control System material part 2
CF-105 Ground installations 28 V DC power supply and interphone - Report No. LOG/105/7
CF-105 Initial Projects Office, N.A.E. 'Spinning' Model Scale 1/24 Series II
CF-105 Instrumentation - Electrics Issue 7
CF-105 Instrumentation - Issue 7 - Undercarriage
CF-105 Instrumentation - Issue 7; Electrics
CF-105 Instrumentation - Issue 7; Structural Integrity
CF-105 Instrumentation - Issue 7; Undercarriage
CF-105 Instrumentation - Structural Integrity
CF-105 MK. II estimate of electrical power to be supplied by ground power units - Report No. LOG/105/5 Issue 4
CF-105 Mk 1 drawing 35 yr t-shirt
CF-105 Mock-up Evaluation Change Requests Progress Record
CF-105 Monthly Performance Reports
CF-105 N.A.E. low speed wind tunnel tests January 1956: longitudinal derivatives and comparison with C.A.L. Report No. P/Wind Tunnel/108
CF-105 N.A.E. low speed wind tunnel tests: January 1956: final corrected plots Report No. P/Wind Tunnel/98
CF-105 Power Plant Ground Support Equipment
CF-105 Preliminary Pilot's Operating Instructions
CF-105 Preliminary Weight and Balance and CofG Calculations for Mark 2 Production Aircraft
CF-105 Program 4 Proposal Brochure AD-44
CF-105 Progress Report on the Sparrow II Armanent Installation
CF-105 Proposed flight test program (A/C 1, 2 and 3)
CF-105 Protection Against Ice
CF-105 Replanning
CF-105 Report 7-0500-9 Section 1 - Results from RT 08-265 Static & Fatigue Strengths of Butt Joints & Section 2 Results from RT 08-276 Static & Fatigue Strengths of Skin Splices
CF-105 Revised Weight and Balance Report with J75 Engines Report # 7-0400-05 - issue 16
CF-105 Rolls Out
CF-105 Stick-Servo Loop Instability Problem Anaysis by Honeywell
CF-105 Summary Chart of Weight and Balance Calculations for Issue 27
CF-105 Towing from nose undercarriage - Report No. LOG/105/3
CF-105 Undercarriage
CF-105 Weight and Balance Report of Mark 2 Production Aircraft per Issue 8
CF-105 Weight and Balance Summary for 1st Mark 1 Aircraft with J75 P3 Engines per Issue 5
CF-105 Weight and Balance and C0f G Summary for First J-75 P3 Engines
CF-105 Weight and Balance and C0f G Summary with PS13 Engines
CF-105 Weight and Balance and Cof G Calculations for MK2 Production Aircraft (Preliminary)
CF-105 Weight and Balance and Cof G Summary for 1st CF-105 MK1 Aircraft with J75 P3 Engines Issue 3 Report #7-0400-44
CF-105 Weight and Balance and CofG Estimate per Issue 20
CF-105 Weight and Balance and CofG Estimate per Issue 21
CF-105 Weight and CofG Summary for 1st Mark 1 Aircraft with J75 P3 Engines Per Issue 4
CF-105 Wooden Markup
CF-105 cockpit pressurization tests - Report No. LOG/105/39
CF-105 damping system development
CF-105 damping system development. Issue 2
CF-105 description and maintenance instructions General Electric constant speed drive
CF-105 engine and gearbox oil dispenser
CF-105 engineering chronology: section 1-3
CF-105 engineering chronology: section 4-15
CF-105 free flight stability model results Report No. P/F.F.M./57
CF-105 general requirements for mobile ground power units Report No. LOG/105/8
CF-105 ground cooling of electronic equipment
CF-105 hydraulic systems fluid dispenser - Report No. LOG/105/33
CF-105 instrumentation. Issue no. 7
CF-105 maintenance features of rubber fuel cells
CF-105 monthly performance report no. 1
CF-105 monthly performance report no. 2
CF-105 monthly performance report no. 3
CF-105 monthly performance report no. 4
CF-105 monthly performance report no. 6
CF-105 monthly performance report no. 8
CF-105 painting of RL201
CF-105 periodic performance report no. 10
CF-105 periodic performance report no. 9
CF-105 power plant ground support equipment Report No. LOG/105/43
CF-105 power plant installation (Pratt & Whitney J75)
CF-105 preliminary study of proposed armament storage and test facility Report No. LOG/105/36
CF-105 progress
CF-105 refueling and defueling - Report No. LOG/105/18 issue 2
CF-105 related conservative cabinet minutes
CF-105 service data - Section 4 - Main landing gear
CF-105 service data. Section 11: Flying controls: mechanical
CF-105 service data. Section 12: Flying controls: hydraulic system
CF-105 service data. Section 15: Fuel system
CF-105 service data. Section 19: Low pressure air system
CF-105 service data. Section 20: Utility hydraulics system: power circuit
CF-105 service data. Section 22: Oxygen system
CF-105 service data. Section 24: Engine controls
CF-105 service data. Section 25: Electrical system: engine services
CF-105 service data. Section 27: Electrical system: fire protection
CF-105 service data. Section 28: Electrical system: engine de-icing
CF-105 service data. Section 29: Engine intake and ramp de-icing system
CF-105 service data. Section 32: Canopies
CF-105 service data. Section 33: Electrical system: canopies
CF-105 service data. Section 37: Electrical system: power supplies
CF-105 service data. Section 40: Electronics: power distribution
CF-105 service data. Section 47: Electronics: J4 Gyrosyn compass
CF-105 service data. Section 48: Electrical system: air conditioning
CF-105 service data. Section 49: Radome de-icing system
CF-105 service data. Section 50 Electrical system: radome de-icing
CF-105 service data. Section 50: Electrical system: radome de-icing
CF-105 service data. Section 52 Electronics: R-Theta navigation computer
CF-105 service data. Section 52: Electronics: R-theta navigation computer
CF-105 service data. Section 5: Nose landing gear
CF-105 service data. Section 7 Utility hydraulics system: wheel brakes circuit
CF-105 service data. Section 7: Utility hydraulics system: wheel brakes circuit
CF-105 systems maintenance
CF-105 undercarriage - Report No. LOG/105/20
CF-105 wing influence coefficients - A method of wing deflection analysis
CF-105 with J75 Engines as interim Power Plant revised Weight and C.G. Summary issue 22
CF-105 with J75 Engines as interim Power Plant revised Weight and C.G. Summary issue 23
CF-105-A note on Stability
CF-105. N.A.E. spinning tunnel tests, data for dynamic balancing
CF-105. Proposed program of Sparrow and Canopy tests at Cornell and Sparrow jettisoning in Ottawa
CF-105/PS13
CF-105: mock-up evaluation change requests: progress record
CF-105: twin engine supersonic all-weather fighter
CF-116 Freedom Fighter
CF-5
CF105 Protection against ice - Copy 14
CF105 protection against ice - copy 1
CF105. Protection against ice
CF_105 Armament installation review of experimental and analytical program
CG Diagram C-102 Fixed and Removable Equip. Drawing SK-1742 - sheet 2 of 3
CISTI's Online Catalogue
CL-13 (F86E) Sabre production line
CL-52 (B-47) in flight with Iroquois mounted
COCKPIT EVALUATION TESTS
COPA Flight - May 2019
COPA News - Sep 1953
COR Minute Sheet
COR minute sheet - 14 May 58
COR minute sheet - 25 Jul 58
CPA buys Comets
CSK 1778
CSK-1781
CSK-1783
CSK1779
CSK1780
Cabin Pressurization Conrols schematic
Cabinet Conclusions 8-28-58
Cabinet Meeting Feb 17, 1959
Cabinet Meeting Feb 19, 1959
Cabinet Meeting Feb 23, 1960
Cabinet Meeting Feb 7, 1959
Cabinet Meeting July 7, 1959
Cabinet Meeting March 23, 1955
Cabinet Minutes
Cabinet Minutes August 28 1958
Cabinet Minutes August 28 1958
Cabinet Minutes September 3 1958
Cabinet Minutes September 3 1958
Cabinet meeting 01-13-59
Cabinet meeting 01-28-59
Cabinet meeting 02-03-59
Cabinet meeting 02-04-59
Cabinet meeting 02-10-59
Cabinet meeting 02-12-57
Cabinet meeting 02-14-59
Cabinet meeting 02-17-59
Cabinet meeting 02-19-59
Cabinet meeting 02-23-59
Cabinet meeting 09-22-58
Cabinet meeting 10-24-57
Cabinet meeting 10-25-57
Cabinet meeting 10-29-57
Cabinet meeting 11-25-58
Cabinet meeting 11-27-58
Cabinet meeting 12-02-58
Cabinet meeting 12-07-55
Cabinet meeting 12-07-57
Cabinet meeting 12-22-58
Cabinet meeting 12-31-58
Cabinet meeting 3-23-55
Cabinet meeting May 14, 1959
Cablegram from Sir Roy Dobson to W.A.Curtis re. delegation of authority.
Calculations of the Trajectory in the Pitching Plane of the Velvet Glove Missile from CF-100
Calgary Sun letter
Call RCMP to aid probe of jet plane leak
Called tragic sellout - Unions say 47,000 jobs involved
Campaign is launched to save Avro Arrow
Can-Car Builds Harvard for World Wide Sale / Cut-Away Section of "Orenda"
Canada 1950
Canada Air and Space Museum Ottawa - Arrow Exhibit 203 wing area view
Canada Air and Space Museum Ottawa - Arrow Exhibit Air intake of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Arrow display
Canada Air and Space Museum Ottawa - Arrow Exhibit Cockpit panel
Canada Air and Space Museum Ottawa - Arrow Exhibit Components wrapped in plastic
Canada Air and Space Museum Ottawa - Arrow Exhibit Downward view of cockpit area
Canada Air and Space Museum Ottawa - Arrow Exhibit End view of J75 engine
Canada Air and Space Museum Ottawa - Arrow Exhibit Front view of J75 engine
Canada Air and Space Museum Ottawa - Arrow Exhibit Frontal port view of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Hydraulic piston
Canada Air and Space Museum Ottawa - Arrow Exhibit Image of Jetliner and 206
Canada Air and Space Museum Ottawa - Arrow Exhibit J75 engine
Canada Air and Space Museum Ottawa - Arrow Exhibit Looking up into nose wheel area
Canada Air and Space Museum Ottawa - Arrow Exhibit Low nose on view of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Lower sectional view of 206 - from rear
Canada Air and Space Museum Ottawa - Arrow Exhibit Lower sectional view of 206 from left
Canada Air and Space Museum Ottawa - Arrow Exhibit Lower side view of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Main gear assembly, side view - image 1
Canada Air and Space Museum Ottawa - Arrow Exhibit Main gear assembly, side view - image 2
Canada Air and Space Museum Ottawa - Arrow Exhibit Model for wing airflow testing, notice only one wing is notched
Canada Air and Space Museum Ottawa - Arrow Exhibit Model of cockpit instrumentation
Canada Air and Space Museum Ottawa - Arrow Exhibit Model of main landing gear decending from wing - Image 1
Canada Air and Space Museum Ottawa - Arrow Exhibit Model of main landing gear decending from wing - Image 2
Canada Air and Space Museum Ottawa - Arrow Exhibit Model of main landing gear decending from wing - Image 3
Canada Air and Space Museum Ottawa - Arrow Exhibit More distant view of 206, with Me163 Komet beside it
Canada Air and Space Museum Ottawa - Arrow Exhibit Nose on view of smaller model
Canada Air and Space Museum Ottawa - Arrow Exhibit Nose wheel of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Outer wing component of 203 - Image 1
Canada Air and Space Museum Ottawa - Arrow Exhibit Outer wing component of 203 - Image 2
Canada Air and Space Museum Ottawa - Arrow Exhibit Outer wing component of 203 - image 3
Canada Air and Space Museum Ottawa - Arrow Exhibit Port side view of air intake area
Canada Air and Space Museum Ottawa - Arrow Exhibit Section view of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Side view of 206 - right side - image 1
Canada Air and Space Museum Ottawa - Arrow Exhibit Side view of 206 - right side - image 2
Canada Air and Space Museum Ottawa - Arrow Exhibit Small models of the arrow
Canada Air and Space Museum Ottawa - Arrow Exhibit Smaller model of front end
Canada Air and Space Museum Ottawa - Arrow Exhibit Starboard frontal view of 206, upper
Canada Air and Space Museum Ottawa - Arrow Exhibit Starboard frontal view of 207, lower
Canada Air and Space Museum Ottawa - Arrow Exhibit Starboard view of 206
Canada Air and Space Museum Ottawa - Arrow Exhibit Unknown component
Canada Jetliner Flys Test
Canada Sets Air Pace with Jet Mail Hop
Canada and the Cold War
Canada can build Jets Too
Canada leads hemisphere as first pure jet passenger plane takes to the air at Malton / Jetliner Test Caution Pays Say Triumph for Canadians
Canada missed mark by dumping Arrow
Canada not ready for disaster or war
Canada planning CF-5 sale to Venezuela
Canada plays it cozy in the Missile marathon
Canada's Air Force - never before has Canada's arsenal held such a powerful weapon
Canada's Aircraft Industry: 1956
Canada's Aircraft Industry: 1959 - The Companies: What They're Doing
Canada's Aircraft Industry: Its Significance to the Economy
Canada's Arrow
Canada's Avro Arrow - A presentation by Doug Hyslip - Oct 2003
Canada's Avro C-102
Canada's Avro CF-100
Canada's Avro CF-105 Arrow
Canada's CF-100 interceptor described as Waddling Cow
Canada's CF-100's at Farnborough
Canada's Defense Dilemma The Choice for Ottawa - Get a UN Police Force or Adopt Nuclear Arms
Canada's Encounter with High Speed Aeronautics
Canada's First Jet Engine Avro Chinook Makes Debut
Canada's First Supersonic Aircraft
Canada's Flying Heritage
Canada's Forgotten Arrow
Canada's Glory Days
Canada's Iroquois Turbo-Jet Packs Terrific Power
Canada's Jet Warrior - Pt 1
Canada's Minister of Trade and Commerce
Canada's NEW Jetpowered Industry
Canada's National Nightmare
Canada's New Power Plants
Canada's Supersonic Fighter Fiasco
Canada's Supersonic Sentinel
Canada's air force - The RCAF builds a barrier
Canada's missile plans took new form in 1956
Canada's next jet fighter
Canadair Sabre
Canadair Sabre
Canadair Sabre F86 in flight
Canadair Sabre Mk. 1 - 6 - Aircam Aviation Series No 20
Canadair's 1000 Sabre
Canadair's bid shuts out Avro on $91,500,00 jet contract / Malton Plant seen getting parts orders
Canadair: a vital link in Canada's aircraft Industry
Canadian Aeronaut - Jan 1959
Canadian Aeronaut - Jan 1959
Canadian Aeronautical Institute - First of many
Canadian Aircraft Industry Program Stresses Turbines
Canadian Airliner Opens New Vistas
Canadian Aviation cover
Canadian Built Aero Engines
Canadian Dream Machine: The Story of Avro Canada
Canadian Government Program for the Avrocar Phase 1 - Comparison of the Direct Operating Costs of Light Aircraft with Developed Versions of the AVROCAR. Report 500/PERF/430
Canadian Government Program for the Avrocar Phase 1 - Performance 500/PERF/427
Canadian Government Program for the Avrocar Phase 1 - Propulsive System Analysis 500/INT AERO/421
Canadian Government Program for the Avrocar Phase 1 - Weight and Balance Report
Canadian Government news stories
Canadian Innovation - CF-100 Story
Canadian Jet Fighter Data "Leaks" to US Publication
Canadian Jet Flighter Data "Leaks" to U.S. Publication
Canadian Jet Rigged in U.S.
Canadian Jet takes shape - C-102 Four-Jet Airliner well under way in Avro Plant at Malton
Canadian Military Aircraft
Canadian Sabre Production Reaches the End of the Line
Canadian Solution
Canadian Wings - The History of Canadian Military Aviation - Wings
Canadian aviation - 50th Anniversary Issue
Canadian aviation - Vol 51 No 8
Canadian aviation - Volume 20 Number 12
Canadian aviation - Volume 20 Number 2
Canadian aviation - Volume 20 Number 3
Canadian aviation - Volume 20 Number 4
Canadian aviation - Volume 21 Number 1
Canadian aviation - Volume 21 Number 10
Canadian aviation - Volume 21 Number 11
Canadian aviation - Volume 21 Number 12
Canadian aviation - Volume 21 Number 2
Canadian aviation - Volume 21 Number 3
Canadian aviation - Volume 21 Number 4
Canadian aviation - Volume 21 Number 5
Canadian aviation - Volume 21 Number 6
Canadian aviation - Volume 21 Number 7
Canadian aviation - Volume 21 Number 8
Canadian aviation - Volume 21 Number 9
Canadian aviation - Volume 22 Number 1
Canadian aviation - Volume 22 Number 10
Canadian aviation - Volume 22 Number 12
Canadian aviation - Volume 22 Number 4
Canadian aviation - Volume 22 Number 5
Canadian aviation - Volume 23 Number 3
Canadian aviation - Volume 23 Number 5
Canadian aviation - Volume 23 Number 6
Canadian aviation - Volume 23 Number 9
Canadian aviation - Volume 24 Number 10
Canadian aviation - Volume 24 Number 11
Canadian aviation - Volume 24 Number 12
Canadian aviation - Volume 24 Number 2
Canadian aviation - Volume 24 Number 3
Canadian aviation - Volume 24 Number 4
Canadian aviation - Volume 24 Number 5
Canadian aviation - Volume 24 Number 6
Canadian aviation - Volume 24 Number 7
Canadian aviation - Volume 24 Number 8
Canadian aviation - Volume 24 Number 9
Canadian aviation - Volume 25 Number 1
Canadian aviation - Volume 25 Number 12
Canadian aviation - Volume 25 Number 2
Canadian aviation - Volume 25 Number 3
Canadian aviation - Volume 25 Number 5
Canadian aviation - Volume 26 Number 10
Canadian aviation - Volume 26 Number 2
Canadian aviation - Volume 26 Number 3
Canadian aviation - Volume 26 Number 4
Canadian aviation - Volume 26 Number 6
Canadian aviation - Volume 26 Number 7
Canadian aviation - Volume 26 Number 8
Canadian aviation - Volume 26 Number 9
Canadian aviation - Volume 27 Number 1
Canadian aviation - Volume 27 Number 10
Canadian aviation - Volume 27 Number 11
Canadian aviation - Volume 27 Number 12
Canadian aviation - Volume 27 Number 2
Canadian aviation - Volume 27 Number 3
Canadian aviation - Volume 27 Number 4
Canadian aviation - Volume 27 Number 5
Canadian aviation - Volume 27 Number 6
Canadian aviation - Volume 27 Number 7
Canadian aviation - Volume 27 Number 8
Canadian aviation - Volume 27 Number 9
Canadian aviation - Volume 28 Number 1
Canadian aviation - Volume 28 Number 10
Canadian aviation - Volume 28 Number 11
Canadian aviation - Volume 28 Number 12
Canadian aviation - Volume 28 Number 3
Canadian aviation - Volume 28 Number 4
Canadian aviation - Volume 28 Number 5
Canadian aviation - Volume 28 Number 6
Canadian aviation - Volume 28 Number 7
Canadian aviation - Volume 28 Number 8
Canadian aviation - Volume 28 Number 9
Canadian aviation - Volume 29 Number 1
Canadian aviation - Volume 29 Number 10
Canadian aviation - Volume 29 Number 11
Canadian aviation - Volume 29 Number 12
Canadian aviation - Volume 29 Number 2
Canadian aviation - Volume 29 Number 3
Canadian aviation - Volume 29 Number 4
Canadian aviation - Volume 29 Number 5
Canadian aviation - Volume 29 Number 6
Canadian aviation - Volume 29 Number 7
Canadian aviation - Volume 29 Number 8
Canadian aviation - Volume 29 Number 9
Canadian aviation - Volume 30 Number 1
Canadian aviation - Volume 30 Number 10
Canadian aviation - Volume 30 Number 11
Canadian aviation - Volume 30 Number 12
Canadian aviation - Volume 30 Number 2
Canadian aviation - Volume 30 Number 3
Canadian aviation - Volume 30 Number 4
Canadian aviation - Volume 30 Number 5
Canadian aviation - Volume 30 Number 6
Canadian aviation - Volume 30 Number 7
Canadian aviation - Volume 30 Number 8
Canadian aviation - Volume 31 Number 1
Canadian aviation - Volume 31 Number 10
Canadian aviation - Volume 31 Number 11
Canadian aviation - Volume 31 Number 2
Canadian aviation - Volume 31 Number 3
Canadian aviation - Volume 31 Number 4
Canadian aviation - Volume 31 Number 5
Canadian aviation - Volume 31 Number 6
Canadian aviation - Volume 31 Number 7
Canadian aviation - Volume 31 Number 8
Canadian aviation - Volume 31 Number 9
Canadian aviation - Volume 32 Number 1
Canadian aviation - Volume 32 Number 11
Canadian aviation - Volume 32 Number 12
Canadian aviation - Volume 32 Number 2
Canadian aviation - Volume 32 Number 3
Canadian aviation - Volume 32 Number 5
Canadian aviation - Volume 32 Number 6
Canadian aviation - Volume 32 Number 7
Canadian aviation - Volume 32 Number 8
Canadian aviation - Volume 32 Number 9
Canadian aviation - Volume 33 Number 1
Canadian aviation - Volume 33 Number 10
Canadian aviation - Volume 33 Number 12
Canadian aviation - Volume 33 Number 2
Canadian aviation - Volume 33 Number 3
Canadian aviation - Volume 33 Number 4
Canadian aviation - Volume 33 Number 5
Canadian aviation - Volume 33 Number 6
Canadian aviation - Volume 33 Number 7
Canadian aviation - Volume 33 Number 8
Canadian aviation - Volume 33 Number 9
Canadian aviation - Volume 34 Number 1
Canadian aviation - Volume 34 Number 10
Canadian aviation - Volume 34 Number 11
Canadian aviation - Volume 34 Number 12
Canadian aviation - Volume 34 Number 2
Canadian aviation - Volume 34 Number 3
Canadian aviation - Volume 34 Number 5
Canadian aviation - Volume 34 Number 6
Canadian aviation - Volume 34 Number 7
Canadian aviation - Volume 34 Number 8
Canadian aviation - Volume 34 Number 9
Canadian aviation - Volume 35 Number 10
Canadian aviation - Volume 35 Number 12
Canadian aviation - Volume 35 Number 3
Canadian aviation - Volume 35 Number 6
Canadian aviation - Volume 35 Number 7
Canadian aviation - Volume 35 Number 8
Canadian aviation - Volume 35 Number 9
Canadian aviation - Volume 36 Number 1
Canadian aviation - Volume 36 Number 10
Canadian aviation - Volume 36 Number 11
Canadian aviation - Volume 36 Number 12
Canadian aviation - Volume 36 Number 2
Canadian aviation - Volume 36 Number 3
Canadian aviation - Volume 36 Number 4
Canadian aviation - Volume 36 Number 5
Canadian aviation - Volume 36 Number 6
Canadian aviation - Volume 36 Number 7
Canadian aviation - Volume 36 Number 8
Canadian aviation - Volume 36 Number 9
Canadian aviation - Volume 37 Number 1
Canadian aviation - Volume 37 Number 10
Canadian aviation - Volume 37 Number 11
Canadian aviation - Volume 37 Number 12
Canadian aviation - Volume 37 Number 2
Canadian aviation - Volume 37 Number 3
Canadian aviation - Volume 37 Number 4
Canadian aviation - Volume 37 Number 5
Canadian aviation - Volume 37 Number 6
Canadian aviation - Volume 37 Number 7
Canadian aviation - Volume 37 Number 8
Canadian aviation - Volume 37 Number 9
Canadian aviation - Volume 38 Number 1
Canadian aviation - Volume 38 Number 10
Canadian aviation - Volume 38 Number 11
Canadian aviation - Volume 38 Number 12
Canadian aviation - Volume 38 Number 2
Canadian aviation - Volume 38 Number 3
Canadian aviation - Volume 38 Number 4
Canadian aviation - Volume 38 Number 5
Canadian aviation - Volume 38 Number 7
Canadian aviation - Volume 38 Number 8
Canadian aviation - Volume 38 Number 9
Canadian aviation - Volume 39 Number 1
Canadian aviation - Volume 39 Number 11
Canadian aviation - Volume 39 Number 12
Canadian aviation - Volume 39 Number 2
Canadian aviation - Volume 39 Number 3
Canadian aviation - Volume 39 Number 4
Canadian aviation - Volume 39 Number 5
Canadian aviation - Volume 39 Number 6
Canadian aviation - Volume 39 Number 7
Canadian aviation - Volume 39 Number 8
Canadian aviation - Volume 39 Number 9
Canadian aviation - Volume 40 Number 1
Canadian aviation - Volume 40 Number 12
Canadian aviation - Volume 40 Number 2
Canadian aviation - Volume 40 Number 3
Canadian aviation - Volume 40 Number 4
Canadian aviation - Volume 40 Number 5
Canadian aviation - Volume 40 Number 8
Canadian aviation - Volume 41 Number 1
Canadian aviation - Volume 41 Number 11
Canadian aviation - Volume 41 Number 3
Canadian aviation - Volume 41 Number 4
Canadian aviation - Volume 41 Number 5
Canadian aviation - Volume 41 Number 6
Canadian aviation - Volume 41 Number 7
Canadian aviation - Volume 42 Number 1
Canadian aviation - Volume 42 Number 3
Canadian aviation - Volume 42 Number 4
Canadian aviation - Volume 42 Number 5
Canadian aviation - Volume 42 Number 6
Canadian aviation - Volume 42 Number 7
Canadian aviation - Volume 44 Number 3
Canadian aviation - Volume 44 Number 6
Canadian aviation - Volume 55 Number 10
Canadian aviation Historical Society Special Presentation
Canadian aviation Vol 36 No 11
Canadian aviation and the Avro Arrow
Canadian aviation articles highlighting 1950's aircraft
Canadian aviation in the Jet Age - Avro Canada CF-105 Arrow
Canadians Accredited to Receive Information on System 606A and / Avrocar Program
Cancellation of Technical Requirement No. TR3 for AVRO Ladybird vehicle (Development Plan 1794)
Cancelled Arrow program killed air technology
Cancelling Arrow terrible blow
Cancelling Arrow terrible blow
Canopy Centre Arch & operating mechanism, Drawing 7-0152-PE-30
Canuck - 1/48 Scale model
Canuck - 1/72 Scale model
Canuck Cold Lake Scramble
Canuck Jetliner Takes Air
Canuck Mk 5 428 AW Sqn RCAF 1957
Canuck front view
Canuck image on the ground
Canuck painting
Canuck, CF100 All Weather Fighter
Canucks Unlimited
Capabilities of the Mark 1A ASTRA System
Capability of the Arrow Weapon System Report #7
Capability of the Arrow weapon system: appendix B: capabilities of the MARK 1A system
Capt Curtis
Cardboard package for wrench - Part ST.1531
Careers are more satisfying …where the projects are interesting
Careers for engineers
Carleton University impacted by Avro
Cartoon
Case for mobile missile bases
Centre Fuselage Interchangeability Control points , Drawing 7-4354-PE-10
Centre for Aeronautical Science - from the NRC come scientific answers to aeronautical questions
Centrifugal or Axial?
Cf-105 Model Specification-Part 2 of AAMS/105/1. 1955
Cf-105 Preliminary Weight and Balance and CofG Calculations for Mark 2 Production Aircraft per Issue 6
Cf-105 Weight and Balance Summary Per Issue 7 for Mark 2 Aircraft
Chain of Command - the organization of the RCAF
Challenge to the resourceful
Changes to Weekly Engineering Salary Structure
Chapter 16: Jets - Early Possibility 1950-1953, The Avro Jetliner
Chas J. Wacey to Greg Burke - Jetliner/Arrow - Diefenbaker Canada Centre
Chase aircraft for use in the Arrow flight development program Report No. 70/Eng. Comm/4
Chickiwicki for Orenda's Papoose
Chief of Staff instructions re Smye letter
Chinook Engine Spearheads Canadian Turbine Program
Chinook Engine image
Chinook Jet by Avro - Stainless and Heat-Resisting Steels by Firth Brown
Chinook and Orenda Engines - A Short History
Chinook seen First Step to new Canadian Industry
Chris Hadfield - Speaking in front of 202 model at Aircraft Maintenance Engineers Association
Civilian Panel to Study UFO's, Air Force Assures Congress - Apr 1966
Clark`s scratch built avro arrow turbine
Clever Spoof Blueprint of Water-Cooled Electronic Gloop - Part No. 123-456-789 1/2
Clipped Wing Anson
Clipping the Arrow's Wings
Close encounters of the weird kind
Co-Ordination interchangeability media - inner & outter wing drawing 4300-P.E. 14
Co-ordination drawing Jig references to marry-up ass'y jig - centre fuselage - drawing 7-1054-1-AJ-1
Co-ordination interchangeability Media Inner and Outter wing, drawing 4300-PE-14
Coanda Effect - Avro Car
Cockpit floor Assy jig, Left and Right hand Drawing 7-1052-395 & 7-1052-396-AJ-1
Cold War
Cold War - Wikipedia
Cold War Canada
Cold War Tech War
Cold War, DEW Line, Pinetree Line
Collective Agreement
Collective Agreement between Avro Aircraft Limited and Technical Associates Lodge 2030
Collingwood centenarian who worked on the Avro Arrow pays visit to its replica
Collingwood man who helped develop Avro Arrow celebrates 104th birthday
Color Photo of Avro Jetliner Flight Deck
Colour Photo of Jetliner with Red A.V. Roe Canada Limited Fire Truck in Foreground
Comet Flight Trials Mark jet transport era
Comet Operations in the RCAF
Comet airliner starting shakedown flight trials
Comet has 50,000 hrs
Comets Return
Comments regarding the CF-105/Sparrow II weapon system
Commercial Aviation - Feb 1960
Commercial Aviation - Jan 1960
Commercial Aviation - Mar 1960
Company Pilots
Company photo of test pilot Don Rogers in flight gear.
Comparison of Arrow 2 and BOMARC in the Air Defence of Eastern Canada
Comparison of Soviet Military Capabilities
Competition - the new look for industry
Complete inner wing, Drawing AVR-7-1062
Components of the Power Plant Bay drawing 7-1050-PE1
Compromised Arrow
Concept drawing CF-105 Mk2 with ram jets
Concorde
Concorde - notes from Jim Floyd
Confidential Report
Congratulations to A.V. Roe Canada Limited in the completion of Canada's first JETLINER
Congratulations to A.V. Roe Canada Limited on the successful completion of the First Jet Engine Designed and Built in Canada
Congratulations to Avro Aircraft
Construction
Construction - Apr 1949
Construction - Apr 1950
Construction - Apr 1951
Construction - Aug 1951
Construction - Dec 1949
Construction - Dec 1950
Construction - Dec 1951
Construction - Feb 1951
Construction - Jan 1950
Construction - Jan 1953
Construction - Jul - 1952
Construction - Jul 1950
Construction - Jul 1951
Construction - Jun 1950
Construction - Jun 1951
Construction - Mar 1950
Construction - May 1951
Construction - May 1952
Construction - Nov 1950
Construction - Oct 1949
Construction - Oct 1950
Construction - Sep 1949
Construction - Sep 1950
Construction - Sep 1951
Construction of an Involute Curve
Continental Air Power - What's the score in NORAD - ICBM defense is coming, buth the Commander-in-Chief doesn't know when
Contol Column Flying Controls C105 Nose Section, Ref Drg # 7-1552-3, Drawing PE 7-0152-36, Sheet 1 of 2
Contractor's Inspection Certificates For CF-105 Aeroplane No. 25201
Contracts - Apr 1956
Contracts Awarded - Apr 1952
Contracts Awarded - Apr 1960
Contracts Awarded - Apr 1962
Contracts Awarded - Aug 1958
Contracts Awarded - Dec 1953
Contracts Awarded - Dec 1957
Contracts Awarded - Jan 1958
Contracts Awarded - Jan 1961
Contracts Awarded - June 1956
Contracts Awarded - May 1962
Contracts Awarded and Anti-icing for Jets
Contracts awarded - Jun 1952
Control Mass Contribution to Hinge Moment
Control Mass Contribution to Hinge Moment
Control Surface Hinge Moment Derivative from Flight Tests
Control Surface Hinge Moment Derivatives from Flight Tests
Control Tube Sub-assembly Outer trailing edge, Inner wing , drawing 7-1562-0014
Control by PSC Applied Research Limited for rocket-fire pattern on Canada's CF-100
Convair F-102 Delta Dagger Pilot's Flight Operating Instructions
Cooling - another problem for the electronics engineer
Coordinate Description; Note on Flying Control Mechanism
Copa award winner
Cope congratulatory letters
Cope interview
Copy of Lecture by J.C. Floyd to Royal Aeronautical Society on Canadian Approach to All-Weather Interceptor Development
Corporate registries
Correspondence from Bob Collingbourn to Les Wilkinson on Project Y
Correspondence of National Advisory Committee (AD) for Aeronautics
Cosford's Prototype
Cost Accounting Manual
Could make Airliners at Avro, Union Claims
Countdown - Mar 1960
Coupled Naiad
Cover of Aircraft - Aug 1956
Cover of Aircraft - Dec 1955
Cover of Aircraft - Jun 1956
Cover of Aircraft - Mar 1955
Cover of Jan 1953 Aircraft
Cracking the U.S. Market
Cranfield Scholarship
Crawford Gordon's statement on Prime Minister Diefenbaker's Announcement on Arrow 24 Sep 1958
Created by Canadians
Croll blasts PM for killing Arrow
Crosswind - May 2004
Curtis Places Arrow program in perspective
D-GG75A-1
DAGMAR - Drift and Groundspeed Measuring Airborne Radar
DATA EDITING AND MONITORING PROCEDURE FOR FIRST FLIGHT
DND Naval HQ W.M. Cameron, Director of Scientific Services to D. Eng R
DUCT BAY INTERCHANGEABILITY CONTROL POINTS drawing 7-4356-PE-10
DVD-CBC1
DVD-CBC1 chapter 12
Dambusters Declassified Documentary - full 1 hour version - Martin Shaw
Damping System Development, Issue 2 Report No p/Stability/137
Data dwg - CF-105 Mk 1, Drawing 7-4300-3
Data obtained during low speed wind tunnel tests of 0.07 scale C-105 model (wing no. 1)
Datum Line dwg CF105 Arrow Mk 1
De Golden Rule
De Havilland Comet
Death of Arrow test pilot end of an era that almost was
Decision Due on Plane's Future Suspended Animation in Industry
Defenbhaker's Legacy: New Ways of Thinking about Nuclear Weapons and Canada's Defence Policy
Defence Orders give… New life to the aircraft industry
Defence Production Buying
Defence Production for Peace
Defence Research Board Letter to J.R. Douglas, Contracts Administrator Avro Aircraft
Defence Research Board Memo RE: Avro VTOL Aircfraft 11 Apr 1958
Defence aides ordered the Arrow scrapped, author says.
Defense Policy Probe by Commons group sought by Pearson
Deft Piloting Saves Jetliner From Crack-up in Dusty Landing
Deisher, Walter Nice
Delta Wings Shape of the future?
Delta Wings- Shape of the future
Deny Arrow led Simonds Quitting Army
Department 3140 phone list
Department Number change
Depressing sense of déjà vu haunts top Avro test pilot
Description and thoughts on the turbo disc
Description of Flying Controls Hydraulic Systems For CF-105 Supersonic All Weather Fighter
Design Certificate for Flight Trials of Arrow 1 Aircraft 25201
Design Certificate for Flight Trials of Arrow 1 Aircraft Serial No. 25202 to 25205 Incl.
Design Progress - Avro Arrow: New frontiers of fighter design
Design Study Of Supersonic All Weather Interceptor Aircraft In Accordance With RCAF Spec Air-7-3
Design and Development Proposal for Project Y2 Airplane
Design for Arrow Supersonic Air Intake
Design study of supersonic all-weather interceptor aircraft, in accordance with RCAF spec. AIR-7-3
Designers and manufacturers of… Dowty
Destruction of a Dream vol 1 - A.V. Roe Canada's "Per ardua ad astra"
Destruction of a dream vol 2 - Supersonic Dreams-at the dawn of a new era
Destruction of a dream vol 3 - Seeds of Suspicion
Destruction of a dream vol 4 - Master In our own house
Detailed Listing of CF-105 Instrumentation-Issue 4
Detailed Statement of Work to be Conducted by Avro on USAF Project 1794
Detailed Study of First Line Maintenance and Turnaround Facilities for Arrow 2. Report 72/GEO/3 - Vol. 2 of 2
Develop Afterburner for Orenda Engine
Development Program for the Escape System for Arrow 2 Aircraft
Development Study Report DAEng-45 CF105 Mock-up evaluation
Development and Trialing of the Bras D'Or
Development of Gun Launched Rockets
Development program for the Arrow escape system. Report 72/SYSTEMS 24/205
Development program projects of a continuing nature
Dew line comments
Dick Timms
Did you know
Dief didn't destroy Arrow
Dief didn't destroy Arrow (web version)
Dief speech
Dief., Missile, Union Pen Arrow Epitaph
Diefenbaker
Diefenbaker Speech to the House of Commons - cancellation of the Arrow
Diefenbaker on defence policy
Diefenbaker, Machinists Meet Today
Diefenbakers law
Digital Computation of Response using an Approximation to Lateral Damper System
Dignitaries Dignity-less as Air Ace Sweeps low at Avro Opening Fete
Dilworth letter
Dinner Celebration of Avro Canada 1958-1998 by The Aerospace Heritage Foundation of Canada Toronto Program of after dinner speakers
Directional stability tests at M=1.57 on a 1/80 scale model of the Avro C-105 aircraft with certain modifications
Directory of Service Department and Associated Personnel
Disaster for Municipalities
Discount speculation on Avro's Delta Plan
Discovery.ca - Aftermath
Discovery.ca Description of the Boeing Built MIM-10B Super Bomarc Missle
Discussion on Ramjets with Curtiss-Wright
Discussions with A.V. Roe Manchester
Dive brake assy drawing 7-1072-1-PE-1 LH / Opposite hand 7-1072-PE-2 issue 3
Dive brake main assy drawing 7-1072-PE-1 LH / 7-1072-PE-2 RH
Divers Hunt for Historic Little Arrows
Diving Deep for the Avro Arrow
Documents on Canadian External Affairs - extract from Cabinet Conclusions
Documents relating to the development of the Avro Arrow located in the Library of the National Aviation Museum
Documents show who ordered scrapping of Arrow
Documents tabled at the meeting on 8th, May 1958 on the subject of structural integrity of the Arrow
Dollars and Pounds
Dollars from Development
Don Connolly's Tribute to the Arrow
Don Novak
Don Rogers Flying Log Book
Don Rogers image
Don't write off the Centrifugal Compressor
Double Decade of Air Defence
Dowty - Canadian Teamwork strengthens NATO
Dowty - First in hydraulics in Canada
Dowty - Ultra high tensile steel
Dowty - abreast of modern development
Dowty - contributing to Canadian Aircraft development
Dowty - landing gear and hydraulics
Dowty Advertisement
Dowty Equipment for Canada's own Aircraft
Dowty gear for CF-100
Dowty goes ahead in Canada
Dr. James C. Floyd-Reflections on the Arrow
Drawing AW430-1022: Balance; CF-105
Drawing Parts List - copy 1
Drawing Parts List - copy 2
Drawings of Avro 707 A,B, C
Drill Jig for Casing-Backbone - Tool 1-F-100389 Sheet 1 of 3
Drop 3 Avro Pilots "I'm throught' -- Jan
Drop Arrow: 13,800 Idle
Dropped by Avro - Keep Know-How Here, 15 Refuse US Jobs
Duct Bay G.A. drawing 7-1056-PE-1 issue 5
Duct bay main floor assembly drawing 7-1056-PE3 issue 4
Duct bay services fuel & air cooling lines drawing 7-2256-PE1
Dutch revive Canadian Flying Saucer - Mar 2007
Dynamic manoeuvres (including fuel flow) for the Avro Arrow (Arrow II) Report No. 72/Comp. A/1 Extract A97/A.C. Man/4
E. Nemeth (Payroll No. 90983) absenteeism
EJD..Off at 2:25
EMERGENCY BRAKE CHECK
ENERGY ABSORBED BY LANDING GEAR DURING LANDING
ENGINE HANDLING AND INSTALLATION TESTS
ENGINE INSTALLATION TEMPERATURE FLIGHT TESTS
ENGINE OIL PRESSURE SWITCH
ENGINEERING PRE-FLIGHT TESTS - A/C 25201
EVALUATION OF MIRROR LANDING SYSTEM
Edith Kathleen 'Kay' Shaw
Editorial (Aircraft) -
Editorial (Aircraft) - Apr 1955
Editorial (Aircraft) - Apr 1958
Editorial (Aircraft) - Aug 1954
Editorial (Aircraft) - Aug 1958
Editorial (Aircraft) - Aug 1959
Editorial (Aircraft) - Dec 1958
Editorial (Aircraft) - Dec 1959
Editorial (Aircraft) - Feb 1959
Editorial (Aircraft) - Jan & Feb 1956
Editorial (Aircraft) - Jan 1949
Editorial (Aircraft) - Jan 1953
Editorial (Aircraft) - Jan 1958
Editorial (Aircraft) - Jan 1959
Editorial (Aircraft) - Jan 1959
Editorial (Aircraft) - Jan 1960
Editorial (Aircraft) - Jan 1964
Editorial (Aircraft) - Jul 1953
Editorial (Aircraft) - Jul 1957
Editorial (Aircraft) - Jul 1959
Editorial (Aircraft) - Jul 1962
Editorial (Aircraft) - Jun 1958
Editorial (Aircraft) - Mar 1959
Editorial (Aircraft) - May 1951
Editorial (Aircraft) - May 1953
Editorial (Aircraft) - May 1957
Editorial (Aircraft) - May 1958
Editorial (Aircraft) - May 1959
Editorial (Aircraft) - May 1960
Editorial (Aircraft) - No Comment - March 1961
Editorial (Aircraft) - Nov 1953
Editorial (Aircraft) - Nov 1957
Editorial (Aircraft) - Nov 1958
Editorial (Aircraft) - Nov 1960
Editorial (Aircraft) - Oct 1956
Editorial (Aircraft) - Oct 1957
Editorial (Aircraft) - Oct 1958
Editorial (Aircraft) - Oct 1960
Editorial (Aircraft) - Sep 1950
Editorial (Aircraft) - Sep 1957
Editorial (Aircraft) - Sep 1959
Editorial - Apr 1948
Editorial - Aug 1957
Editorial - Aug 1959
Editorial - Dec 1957
Editorial - Feb 1958
Editorial - Feb 1963
Editorial - Howe must anwer for Jetliner Remarks
Editorial - Jul 1956
Editorial - Jul 1958
Editorial - Jun 1950
Editorial - Jun 1957
Editorial - Jun 1959
Editorial - Mar 1949
Editorial - Mar 1959
Editorial - Mar 1969
Editorial - May 1948
Editorial - May 1950
Editorial - May 1951
Editorial - May 1963
Editorial - Nov 1949
Editorial - Nov 1956
Editorial - Nov 1957
Editorial - Nov 1958
Editorial - Oct 1958
Editorial - Oct 1963
Editorial - Penny-wise cutback might be dollar folly
Editorial - Sep 1958
Editorial - The Man who flew Silver Dart
Editorial - The importance of a name
Editorial April 1953
Editorial Comment - Apr 1949
Editorial Comment - Dec 1948
Editorial Comment - May 1949
Editorial Log - Aug 1954
Editorial Log - Jan 1954
Editorial Notes - Jun 1963
Effect of NACA wind tunnel and free flight tests on the estimated performance of the CF-105
Effect of NACA wind tunnel and free flight tests on the estimated performance of the CF-105
Effect of failure in ASTRA scanner drive hydraulic system
Effect on Toronto - Metro leaders fear hardship in layoff
Ejection Seats - part 1
Electric Typewriters
Electrical Marry Up C.105 drawing 7-1150-P2
Electrics radio & radar under cockpit floor C105 nose section drawing 7-1152-PE1
Electronics Up Defense Contracts
Elements of Canadian Air Defence
Elements of the Industry
Elevator Assembly drawing 7-1082-PE-09
Elevator Control Box, Drawing 7-1062-0004
Elevator Controls - Remote Lub'n on the inner wing Drawing 7-0115-517
Elevator Intercahangeability Control Points, Drawing 7-4382-PE-10
Elevator Tooling breakdown, Drawing 7-0182-PE-13
Elevator Trailing Edge to inner and outer wing , Drawing 4382-PE-1
Emergency power brochure: Arrow Includes Report 7/3200/1 and its Appendix and Report P/Systems/35 and its Appendix
Empire Auctions Toronto - Avro Arrow Collections sells for $36,000
Employee Stock Option Plan
Employment offer
Encyclopedia > Avro Arrow
Engine Bay Interchangeability Control points Sheet 1/2, Drawing 7-4358-PE-10
Engine Bay Interchangeability Control points Sheet 2/2, Drawing 7-4358-PE-10
Engine Economy Through Regeneration
Engine Installation Temperature Flight Tests
Engine Instrumentation
Engine Thrust from Arrow I Flight tests
Engine Thrust from Arrow I Flight tests
Engine bay general assembly drawing 7-1058-PE1
Engine bay structure and skin detail drawing 7-1058-PE2
Engine development mock-up approval. Report DAEng-46
Engine test area - test cell 2
Engine test building
Engine test facility 1
Engine test facility 2
Engineers Needed
Engineers Second Dream Cut Down
Engineers and aircraft production
Envelope - Original - Avro Aircraft Limited Box 4004, Terminal 'A', Toronto, Canada
Environmental Protection for Arrow 2 Crew Members Report 72/Systems 22/170
Environmental protection for crew members Report No. 72/Systems 22/170
Estimated Arrow Development Potential
Estimated lift and drag characteristics of four wings at supersonic speeds
Estimates of Soviet Threat to North America from Aircraft and Missiles
Estimates of the initial phase of the trajectory in the pitching plane of the Velvet Glove missile when launched from the CF-100
Eurofighter Typhoon
Evaluation of Damper Performance During Flight Test (C-105)
Evaluation of Damper Performance during Flight Test
Evaluation of Damper Performance during Flight test
Evaluations of Project 1794 Reports
Everything exactly to plan as Arrow flies
Evolution in Landing Aids II - Meeting Critical Jet needs
Ex-MP sets Avro Arrow myth on head
Excerpt from unknown publication pages 169, 170 and 171 which lists "SOME PROJECTS COMPLETED BY ENGINEERING"
Excerpts from AVRO Report #7-0400-05 issue 18 "C-105 with J75 production engines: weight summary and C.G. position. Sept 1, 1955"
Excerts from… The Fifth British Commonwealth and Empire Lecture - Inter-City Transport Development on the Commonwealth Routes
Executive jets
Exhibit "I" Statement of Work Project 1794
Exit Strategy
Experience Directs Avro Projects
Exploded view of Nose Section Components C105, Drawing 7-0152-PE-25
Exploded view of aircraft showing milled skins, Drawing 7-0162-PE-7
Exploded view of elevator to elevator Control Box Joint , Drawing 7-4382-PE-3
Exploded view of fin and rudder Ass'y, Drawing 7-4300-PE-30
Exploded view of fin and wing assembly, Drawing 7-4300-PE-31
Extra Dimension
Extract from Leading Arsenal of Democracy 1948-1953
Extract from Minutes of meeting of BOD of Canadian General Transit Company, 64/06/17
Extract from U.S.A.F. "Design specification for a long-range interceptor"
Extract from USAF Design Specification for a Long-Range Interceptor
Extract from stability reports
Extracts from… The 1949 Report on the Department of National Defence
F-35 news
F-461194 Wheel Dresser Turbine Blades-Rotor sheet 3 of 5
FAA and Transport Canada Type Certificate for Orenda OE600A
FIRST FLIGHT ARROW 1 - AIRCRAFT 25202
FLYING CONTROL DEVELOPMENT
FLYING CONTROL DEVELOPMENT TESTING
FLYING CONTROL DEVELOPMENT TESTING
FLYING CONTROL SYSTEM TESTING ON A/C 25202
FLYING CONTROLS DEVELOPMENT
FUEL PRESSURIZATION SYSTEM AIR TEMPERATURES
FUEL QUANTITY CALIBRATION
FUEL and PRESSURE LINES in DUCT BAY FUEL SYSTEM drawing 7-4356-PE9
Facts about the Arrow
Fair shares on Defense Effort
Fairing-Transport-Joint Master Model - Tool Numbers 7-1062-3-MM 2 LH Top / 7-1062-4-MM 2 RH Top / 7-1062-3-MM 3 LH Bottom / 7-1062-4-MM 3 LH Bottom
Falcon Missile
Fall Of An Arrow (First Edition)
Fall of an Arrow book review
Fall of the Arrow Part 1
Fall of the Arrow Part 2
Fall of the Arrow Part 3
Fallen Arrow
Fallen Arrow
Farewell to an Icon
Farnborough
Farnborough '58 - Engines
Farnborough - Triumph or Tragedy?
Farnborough Afterthoughts
Fastest moving men in Canada
Fastest passenger plane being built here
Fate of Avro Arrow Questioned
Fateful Day
Fax memo from T.Dugelby to D.Hyslop
Fear Arrow Decision to cost $150,000.000 wonder who pays
Fear loss of skills as result of layoff
Feasibility of combustion processes in supersonic streams
Feather-Weight Feet for a 30 ton Giant
Feds commit $500M for new fighter jets
Fifteen years of progress for Computing Devices of Canada
Fig 1 - Arrow technical production
Fig 10 - Arrow technical production
Fig 11 - Arrow technical production
Fig 12 - Arrow technical production
Fig 13 - Arrow technical production
Fig 14 - Arrow technical production
Fig 2 - Arrow technical production
Fig 5 - Arrow technical production
Fig 6 - Arrow technical production
Fig 7 - Arrow technical production
Fig 8 - Arrow technical production
Fig 9 - Arrow technical production
Fighter Jets
Fighter configuration study
Fighter planes still needed, Briton Says
Fighters to fit the Country
Fighters with a future Part 1
Fighters with a future Part 2
Fin - assemblies, Assembly and jig staging , Drawing 7-0183-PE-09
Fin Breakdown & Assy Sequence
Fin Interchangeability Control points , Drawing 7-4383-PE-10
Fin Rudder Fairing S/Assy , Drawing PE-7-0183-41
Fin and Rudder Interchangeability, Drawing 4315-PE-1
Fin and Tooling Breakdown, Drawing 7-0183-PE-08
Final Assembly Centre Fuselage, Drawing 7-4354-PE-1
Final Assembly Staging Drawing 4300-PE-1
Final chapter on Avro Arrow yet to be written
Financial Faith
Financial Faith in the Future
Finding the P+W engines
Fire and overheat detection
Firm Hires Avro Men for US Aircraft Jobs
First 50 Years of powered flight in Canada
First All-Jet Four-Engine airliner flies
First Arrow takes off on initial test flight
First CAI / IAS Joint meeting - A Meeting of minds
First CF-100 Mk 4
First Canadian Aeronautics and Space Exhibition
First Canadian Jet
First Chinook Gas Tuebine Engine Under Test
First Flight
First Flight - ahead of schedule
First Flight of the Avro Arrow
First Jet Transport: Avro XC-102
First Modern Fighter, Twin-Jet CF-100 Makes First Flight Over Malton
First Orenda in F-86
First Shipment of Orenda - March 1953
First Test Pilot of Avro Arrow dies at 89
First and Second
First flight
First flight August 10, 1949
First relic of the Avro Arrow free-flight program is recovered
Fist Place in the Sun
Flag - British Union Jack
Flag - Red Ensign
Flag - of Alberta
Flag - the Maple Leaf (Canadian Flag)
Flight Aircraft Engineer - 14 Sept 1951
Flight Over: Interrogation to come
Flight Range Checks for TeleCommunications (Equipment on CF-105) Ref 6864/01/J
Flight Simulator X Plane Spotlight - Avro Arrow
Flight Test - The Avro Arrow and a career in Aeronautical Engineering
Flight Test Centre Building Names after Canadian Aviation Pioneer
Flight Test Pilot of Avro Arrow Dies at 89
Flight Testing the New Iroquois at Malton
Flight To Obscurity; The Short Life annd Unnecessary Death of North America's First Jet Airliner
Flight of Fancy
Flight research at Uplands - Uplands looks to a future as Canada's Centre of Aero Research
Flight test program: aircraft 25201, 25202 and 25203
Flight testing the SR-71 Blackbird
Flip, Flop and Flounder - September/October 2004
Flow Chart for the coversion of the engineering drawings into planing prints P.E.S.-3
Floyd Award
Floyd Letter re Gordon
Floyd Note to Avro museum - Jul/2003
Floyd Note to the Avro museum Oct 2003
Floyd and the Arow
Floyd card from his staff
Floyd honoured
Floyd letter to Dobson
Floyd letter to JL Plant Re: Arrow Mark 2A
Floyd letter to Jimmy Kay
Floyd letter to Sir George Gardner, UK Director of Royal Aircraft Establishment
Floyd letter to Sir Thomas G. Pike, UK Commander in Chief
Floyd note to CASI
Floyd recollects Black Friday
Floyd resignation letter to AHFC
Flying Blind: The politics of the CF-105 Avro Arrow Program
Flying CF-100 Canucks
Flying Lockheedès F-104 - prelude to Avro CF-105
Flying Saucer
Flying Saucers at Edwards?
Flying Wing Displays Clean Lines
Flying Wing References
Flying high and straight as an Arrow
Flying sequences were a challenge
Flying the Arrow
Flying the Arrow
Flying the Avro Arrow
Flying the B-47 Iroquois test bed - Hybrid with Seven can cruise on one
Flying the CF-100 Simulator
Focus on Air Power - Peek into the crystal ball at the RCAF's future NATO role
For a well-defended future… Iroquois Orenda's Supersonic Turbojet
For service with the Belgian Air Force
For the Record - A National Aviation Museum
Forefront of Aerospace Tech
Foresees flow of experts to United States
Foreward Wing Assembly Squence - drawing 7-1062-5&6-PE-1
Forget Arrow, turn to missile development, Pearkes urges Canada
Forging Blades of Avro Orenda Precise Operation
Forging Titanium
Former 538.77 Duct & Engine Bay Analysis - Report 7/0510/12 Sheet 5-1
Former 591.65, Duct & Engine Bay Analysis Report No 7/0510/12 Sheet 5-2
Former 644.43 "Duct & Engine Bay Analysis Report No. 7/0510/12 Sheet 5-3
Former 697.28 "Duct & Engine Bay Analysis - Sheet 5-4
Former 742.50 "Duct & Engine Bay Analysis - Sheet 5-5 Report No. 7/0510/12 Ref Dwgs 7-1058-23/29
Former Sub-assemblies STA 489-90 to STA 534.0 drawing 7-1056-PE-7
Former top test pilot Zurakowski Jobless
Forms and Scales of Soviet Air Attacks agains North America
Forward portion of duct - duct bay drawing 7-1056-10 LH & 20 RH
Foulkes letter to Chief of Air Staff
Found & Explained - Avro Arrow
Foundation for Air Power
Four-Jet Comet approaches flight stage
Fourth Annual Orenda 10 yr awards dinner
Fred Matthews letter
Free world looks to Orenda research, development - 2000th jet engine proves production milestone for Canadian industry…
Frobisher
From Boxkite to Jet - Birth of the Jet Engine
From Comox to Zwibrucken…and beyond Orenda Power…and Orenda Service
From Dark days to giant leap
Front fuselage Interchangeability Control points Sheet 1 of 2, Drawing 7-4352-PE-10
Front fuselage Interchangeability Control points sheet 2 of 2, Drawing 7-4352-PE-10
Front fuselage final assembly - Drawing 7-4352-PE-8
Frost says Ottawa must save Malton
Fun and Games and airplanes
Functional & operational tests of breadboard electrical system
Further Arrow performance with P and W JT4B-23 engines: new missions
Future Past - Astra/Sparrow equipped CF-105
Fwd section of duct assy - duct bay - exploded drawing 7-1056-PE 11 LH / 7-1056-PE 12 RH
G.A. 1/80 Supersonic Model N.R.C. From Avro Drawing 7-0200-0006 (shows differences between variant 1 and 2)
G.C. Envelopes with J75 A25 & PS 13 Engines fitted & Full MX 1179 Radar issue 10
G/A C-102 Jetliner - Drawing B 30001
G/A Duct & Engine Bay J75 Engine Version Sheet 3-2 - Report No. 7/0510/12 - Scale 1/10
G/A Duct & Engine Bays J-75 version. Report 7/0510/12 Sheet 3-2
G/C H.R. Foottit Heads CAI
GA Avro C-102 Jetliner, Drawing B30001, 1/48 scale
GA for large double decker passenger jet (large print)
GA for large double decker passenger jet (smaller print) 1/2
GA for large double decker passenger jet (smaller print) copy 2/2
GE Engine Chosen as CL-41 Power Plant
GEMINI (Ground Effect Machine in Northern Industry) One Ton Off-Highway Vehicle
Gamble for jet supremacy
Garrold Wakefield Proctor
Gas Turbine Combustion System Design by F.D.M. Williams, Orenda Engines Limited
Gas Turbine Engineering Department - Functional Organisation Chart
Gas Turbine Engineering Department Functional Organizational Chart
Gas pump on a cloud
Gear Jammed in Air Jetliner Belly-Lands 2 Hrs. Over Malton
Gearing Procurement to Rapid Technical Advances
Gemini - One Ton Off Highway Vehicle - Avro Aircraft Ltd
Gemini 8, John Hodge video
Gemini Flight
General Arrangement Drawing CF-105
General Arrangement Pilots & Navigator's Positions Front Fuse drawing 7-4452-7 Sheet 1 of 2
General Arrangement Pilots & Navigator's Positions Front Fuse drawing 7-4452-7 Sheet 2 of 2
General Assembly Iroquois (4A & prototype), Drawing 83000, Rev F 1/2 Scale
General Data Canadian Saucer Designs of Avro - 1952-1955
General Electric Power to the RCAF's Starfighters
General Introduction to the Arrow Flight Simulator. Report 70/SIMUL/14
General Policy and Programme for the Development, Demonstration, Evaluation of the Arrow Weapon System
General policy and programme for the development, demonstration and evaluation of the Arrow weapon system Report No. 21 Issue 2
General policy for the development, demonstration and evaluation of the Arrow weapon system Report 21
Geoff Grossmith letter
Geoff Grossmith photo
George Bain
George Hamilton's recording of RL201's 10th flight
George Weaver
Gerald A. Orr note
German Research Project
Ghost of the Avrocar
Giant of Industry - Avro Canada Aircraft, Engine Divisions become separate Firms
Global Security - Avro Aircraft
Goodyear - Flying into history
Goodyear ad - CF-100 with iceguards on delivery to R.C.A.F. - Canada's National Research Council makes all-weather flying possible
Gov't 50% Payroll can speed 'saucer'
Government accused of Treason
Government counts on success of Arrow for front-line duty
Government, Avro Officials Remain Silent
Grand Old Lady is Ready to Roll
Grants Odontograph Tables for Drawing Gear Teeth
Greater Winnepeg Sanitary District building used in movie as Avro HQ
Greeting from the Prime Minister - Canadian Air & Space Museum Pioneer Award - letter re Jim Floyd receiving the inaugural Pioneer Award
Grinding Fixture-1st Stage Turbine Disc - Tool 1-F-032026, Sht 1
Ground Test Department Summary of Pre-Flight Test Requirements
Ground Test Department: Summary of Pre-Flight Test Requirements
Ground Test Department: Summary of Pre-Flight Test Requirements Report Rd. 86
Ground intercommunication system
Ground test department summary of minimum pre-flight test requirements for first flight only
Guarding What You Value Most - NORAD 50
Guided Missiles for the Future
HMCS Bras D'Or - the ship that flew
HO Scale - Car - 57 Chevy Bel Air
HO Scale - Fuel Delivery Truck - 53 White 3000
HOC Debates Index May 12 to Sept 6, 1958
HOC Debates Vol 4, May 5 to June 9, 1955
HOC Debates Vol 5, June 10 to July 6, 1955
HYDRAULICS DUCT BAY drawing 7-4356-PE-32
Halfway and center bay
Hamilton Spectator/Burlington Spectator Record of Arrow News Articles since 1988
Hannan's Hangar - Mar 1996 plus mms webpage on the Avro Baby
Hannan's Hangar - Model Avro Triplane
Hard Metal Fabricators - How one small Canadian industry helped cut weight and costs for Orenda's Iroquois
Hardness Conversion Table: For Carbon and Constructional Alloy Steels
Hardware: proprietary list of Arrow 2 Report No. 72/STDS/5 Issue 1
Harold Leslie
Have we throttles our vital aircraft industry?
Hawker Siddeley Group
Hawker Siddeley Group - Teamwork and competition
Hawker Siddely Technical Journal - Spring Summer 1959
Heading for Ceiling in Safety
Heard and Seen at the AITA Convention
Heart attack claims last Avro Arrow test pilot
Heavy Bomber Production in the USSR
Hellyer claims Economy Rules
Hellyer plaque
Helping a Canadian to take flight
Here's the Ottawa text on Air Defence Program
Heritage Minute (features the Arrow movie model)
Heritage Minutes: Avro Arrow
High Altitude Operation
High Flight
High Pressure Type
High Speed Paint - Study Jet Fuels
High Speed Plane
High flight at ground level
High flying days of mighty AVRO Arrow
High-altitude performance data for the C-105 aircraft
Historic Flight
Historical drama fuelled by myth, not reality
History Brief - A.V. Roe
History of Aviation in Canada
History of drag estimate on the Arrow
History of the Air Force Flight Test Center, Edwards Air Force Base California, 1 January - 30 June 1961 RCS: AU-D5 62-AFFTC-12904
History of the Air Force Flight Test Center, Edwards Air Force Base California, 1 January - 30 June 1961 RCS: AU-D5 62-AFFTC-12904 EXTRACT
Homage to Avro Arrow
Home Fallout Protection
Home of TCA's North Stars - Dec 1947
Homeland Defenders
Honeywell
Honeywell is helping to make the Avro Arrow Canada's most formidable air defence weapon
Horizons - Sping 1958
House of Commons Debates Index Jan 7 to July 28, 1955
House of Commons Debates Vol 1 May 12 to June 10 1958
House of Commons Debates Vol 1, Jan 7 to Feb 11, 1955
House of Commons Debates Vol 2 June 11 to July 15 1958
House of Commons Debates Vol 2, Feb 14 to Mar 22, 1955
House of Commons Debates Vol 3 July 16 to Aug 13, 1958
House of Commons Debates Vol 3, Mar 23 to May 4, 1955
House of Commons Debates Vol 4 Aug 14 to Sept 6, 1958
House of Commons Debates Vol 6, July 7 to July 28, 1955
How American paranoia downed the Avro Arrow
How Roy Dobson pushed us into jet age
How an airplane should be designed according to…
How the year has flown - 1954 in retrospect
How to fly at Mach 2
How to get a Repair and Overhaul Contract
Howe Reveals Program for Radar-Air Defense
Howes Baby
Hughes Owens Slide Rule #1778 with leather case
Hunting Arrows
Hydraultics and mechanical services inner wing drawing 7-4300-PE-34
Hypersonic Flight Vehicle
Hyslips take flight
I shot an Arrow in the air
Icing in Jets
Identified and Compiled Listing of AVRO (Canada) Reports
Illustrated Elevator Planning Breakdown showing sub-assemblies, Drawing 7-0182-PE-20
Illustrated Planning Breakdown of Rudder by Sub-Assemblies, Drawing 7-0184-PE-18
Image of Zura on access ladder wth Arrow
Image of the right side of the Avro Arrow on the ground with parking lot in the background
Image of unknown people
Images
Images of former employees in Calgary
Import Control
Improvement of Arrow 2 overload range mission
In Search of Canada's Lost Arrow
In plane view
In the Air - Feb 1952
Inco - new Inco alloys
Incoming Classified Message from CANA|RLON to CANA|RHED
Indian Folklore 1957
Industry '62
Industry Inventory - Presented Herewith… A cross section of Canadian Industry
Industry Leaders Forecast
Industry News - Apr 1963
Industry's 10-year record
Inferiority Complex?
Information supplement to revised Arrow Program Statement of Work Brochure AD-53 Issue 2
Initial operational arrow weapon system Report No. 1 - Definition and development program
Inner Wing Interchangeability Control points , Drawing 7-4362-PE-10
Inner and Outer Wing Assembly Jigs, Drawing PE-7-1062-1-AJ-1
Inner and Outer wing Transport Joint Master Model, Drawing 7-1062-4-MM1
Inner wing to outer wing transport joint , Drawing 7-4300-PE-44
Inside NORAD
Instruction to Design Office
Instrumentation Requirements for Performance Testing of Arrow II Aircraft with Comments on Instrumentation for Arrow I Aircraft
Instrumentation Requirements for Performance Testing of Arrow II with comments on instrumentation for Arrow I
Instrumentation for Arrow Flight Test Program - Arrow 1 and 2
Instrumentation for the Arrow flight test program
Intake to the future
Integration not New for Army and Navy; RCAF Different
Interceptor Rex - The Avro CF-105 Arrow Rev 0
Interceptor Rex - The Avro CF-105 Arrow Rev 1
Interchangeability Elevator Trailing Edge to Elevator , Drawing 4382-PE-2
Interchangeability Fitting of Windscreen & Canopies - Drawing 7-4352-PE-3
Intercom - Arrow still Flies
Interim Version of the CF-105
Interim report on training requirements Avro and Orend Personnel - Preliminary Report No. 11
International Association of Machinists Journeyman (Union Dues Handbook)
Interview of Jim Floyd
Interview with Al Weilband - 1 Jul 1983
Interview with Al Weilband - 10 Feb 1984
Interview with Al Weilband - 24 Feb 1984
Interview with Al Weilband - 29 Aug 1983
Interview with Bill and Mrs Procter
Interview with Desmond Earl
Interview with Doug Garland
Interview with John Conway
Intricate simplicity
Introduction to Jet Flight
Inventions are big business at Avro Canada
Investigation of Arrester Wire Runway Barrier for Arrow Aircraft
Investigation of thermal stresses in wing structure. Report No. 7/0500/3
Invisible Assets
Invitation card for "The Avro Arrow: A Dream Denied"
Ironclads and Arrows
Iroquois - Compressor Design Standard
Iroquois 2 Mock-up Engineering Evaluation Conference July 24th and 25th 1958
Iroquois Monthly Progress Reports
Iroquois Rollout
Iroquois Rollout
Iroquois The Spirit of Power
Iroquois at Farnborough
Iroquois fire in flight
Iroquois second preliminary mock-up inspection|Mock-up board report. Report DAEng-52
Iroquois, Orenda's supersonic turbojet, has passed its fify hour flight rating test - successfully, and on schedule
Is something wrong with our jets? NATO powers face new problems
Is the Saucer Dead?
Isn't it time we had… An Aviation Museum for Canada
Issues
It Came From Outer Toronto
It's a Toss-up
J. McMohon
JCF Letter regarding museum Arrow story for kids
JCF Letter to JJ Green
JCF Letter to Val Cronstedt
JCF letter to Adey - re: manpower requirements
JCF letter to Don Rogers discussing runway requirements for the CF-105
JCF letter to Ewans
JCF letter to GHW Gardner 31 Jan 56 re: Rolls Royce Conway in the CF-105
JCF letter to Hawley
JCF letter to J.A.R. Kay
JCF letter to Lindley and Adey re: Developments of the CF-105
JCF letter to Lindley, Hake and Adey
JCF letter to McCulloch
JCF letter to McCulloch - re: P.S. 13 engine
JCF letter to Morley - re: "Lets name it"
JCF letter to Sir A. Hall - Re: fire control system
JCF letter to Smye, Smith and Morley
JCF letter to T.G. Dunkin - RE: Technical assistance for CF-105 project in UK
JCF letter to W.A.K. Chambers in Logistics Group
JCF letter to project engineeers
JE Brown Building
JIC Secretary to CSC Secretary
JIC draft - Soviet threat to North America Mid -1957
Jacking & Slinging Points at Former Sta 2550, Drawing 7-4300 P.E. 36
Jacqueline Cochran
James C. Floyd
James Charles Floyd Citation
James Doolittle visit
Jan Zurakowski, 89
Janitrol rides the Arrow
Janusz "Zura" Zurakowski - The remarkable life of a test pilot in remarkable times
Janusz Zurakowski - Avro Arrow test pilot
Janusz Zurakowski, 89
Janusz Zurakowski, Legend in the Skies
Jarry Hydraulics
Jean Sellors Victory Aircraft Limited ID Badge
Jet Ace Hurt, Aide killed but save homes from crash
Jet Age - A.V.Roe Canada Ltd 10th Anniversary 1945-1955
Jet Age - Fall and Winter 1954
Jet Airliner Leads Parade Avro Projects at Malton
Jet Bombers
Jet Boost
Jet Debut
Jet Engines in Airline Service
Jet Power and Progress
Jet Secrets probed at Nobel Test Plant
Jet transport Policy
Jetliner
Jetliner '99 - 55th Anniversary - dinner menu & Program
Jetliner Dinner - First Generation Copy
Jetliner Dropped
Jetliner Jello Coin - Plastic disc with Jetliner illustration
Jetliner Musings
Jetliner Progress: Leading The Field
Jetliner Slides in at Malton When Landing Gear Fails
Jetliner Story
Jetliner Suspension Caused Controversy
Jetliner at Chicago Midway Airport
Jetliner extract from book
Jetliner image
Jetliner image from below
Jetliner image, flying
Jetliner image, in flight - image 1
Jetliner image, in flight - image 2
Jetliner image, in flight - image 3
Jetliner image, on flypast - image 1
Jetliner image, on flypast - image 2
Jetliner image, on flypast - image 3
Jetliner image, on tarmac - image 1
Jetliner image, on tarmac - image 2
Jetliner image, on tarmac at open house
Jetliner image, taxiing
Jetliner image, taxiing - Image 3
Jetliner image, taxiing - image 1
Jetliner image, taxiing - image 2
Jetliner image, taxiing - image 4
Jetliner image, view of starboard engines from the rear
Jetliner image, with adoring public - image 1
Jetliner image, with adoring public - image 2
Jetliner image, with adoring public - image 3
Jetliner image, with adoring public - image 4
Jetliner image, with adoring public - image 5
Jetliner in flight
Jetliner in flight - taken from lower left side
Jetliner poster 2 Negative
Jetliner poster Negative
Jetliner print
Jetliner slides in at Malton When Landing Gear Fails
Jetliner, nose area
Jetmen of AVRO
Jetographers
Jetpowered Leadership - Hawker Siddeley Group
Jets and Missiles
Jets go through paces of show set for CNE
Jets on Runways
Jetspeed Jetsmooth Jetpower
Jetspeed Jetsmoth Jetpower
Jim Floyd Awards
Jim Floyd Citation
Jim Floyd Resume
Jim Floyd and Avro Canada
Jim Floyd and the Jetliner
Jim Floyd award in 2009
Jim Floyd comments about in the book "Made for Canada, The story of Avro's Arrow", about the history of Avro and the Arrow
Jim Floyd email re Avro Museum
Jim Floyd image
Jim Floyd letter to Hall asking if the UK is resurrecting the CF-105
Jim Floyd's "positive" comments on the CBC film of the Arrow shown on December 16th, 1996
Jobs open in Britain for Avro Engineers
John Diefenbaker - Campaign Flyer
John Diefenbaker: Butcher of Avro
John Dubbury patent info
Joint 485 Duct bay to C/F 8 Wing drawing 4300-PE-24
Joint Report on Cockpit Instrumentation for the Arrow Weapons System-Issue#2
Joint Report on an RCAF Visit to Langley Laboratories to Discuss Problems of the AVRO CF-105 Aircraft
Joint report on an RCAF-DRB-NAE visit to N.A.C.A. Langley Laboratories to discuss aerodynamic problems of Avro CF-105 Aircraft: 19 November 1954
Joint report on cockpit instrumentation for the Arrow weapons system
Karl's Avro Arrow Page
Karl's Avro Arrow Page - NASA
Keeper of the peace
Kenneth Duddell - WWII RAF Avro Lancaster Flight Engineer Interview
Key People Involved in the Avro Arrow Programme
Killed in a Comet crash
Killing Arrow project right thing to do: expert
Kitchener Firm hit by loss of Arrow Work
Kitchener Waterloo Record - 21 Feb 1959
Kuzyk re-employment letter
LANDING DISTANCE
LANDING GEAR TESTS - ARROW 1
LANDING GEAR TESTS - ARROW-1
Lab Report LR-154 Orenda PS 13 Combustion Chamber (42 In. Diam.) Tests at Atmospheric Pressure
Labor Welcomes Verdict Keeping 1,000 at Avro
Laminated glass from the Orenda Nobel Test Facility - Afterburner Rig Control Room to Afterburner Rig Test Cell
Lancaster & Lancastrian images
Lancaster Avro
Lancaster DND
Lancasters from Canada
Landing Gear, Speed Brake and Hydraulics System Tests
Large Lightweight Turbojet Engines
Last Avro Aero pilot dies
Last Avro Canada test pilot dead at 89
Lateral Characteristics of an Avro Swept Wing with and without Tip Tanks A.M. 5684-5 L.O. 5684A
Launching Ideas into reality
Layoff Informaiton
Layoff at Orenda/Avro Layoff
Layoff notice provided to staff
Layoff pay notice provided to impacted staff
Layout of machinery in skin mill section, Drawing 7-0152-PE-24
Layout of machinery in skin mill section, Drawing 7-0162-PE-24 Issue 2
Layout of machinery in skin mill section, issue two Drawing 7-0162-PE-24
Leadership in Future Air Travel Destine of Jet Transport
Leadership in Future Air Travel Destiny of Jet Transport
Leaside Timekeeper
Legend of the Avro Arrow
Legend of the Avro Arrow - 50 Years Ago
Les Wilkonson to Doug Bolton - Info Request Project Y
Les Wilkonson to R.H. McLachlan - Info Request Project Y
Lesson 1 - Loci of a point on a circle
Letter - A.A. Bailie (VP, Hawker - Siddeley Canada Ltd) to W.A. Curtis Feb 16, 1970 (attached to AC.2000.3.24-29)
Letter - A.A. Bailie to W.A Curtis Sept 14, 1970
Letter - A.A. Bailie to W.A. Curtis Feb 2, 1970 (attached to AC.2000.3.23, 25-29)
Letter - A.A. Bailie to W.A. Curtis Feb 3, 1970 (attached to AC.2000.3.23, 24, 26-29)
Letter - A.A. Bailie to W.A. Curtis Jan 20, 1970 2 pages (attached to AC.2000.3.23-26, 28, 29)
Letter - John Tory to W.A. Curtis Sept 25, 1956 (4 pages, separated)
Letter - Sir Roy Dobson to W.A. Curtis Nov 6, 1952
Letter - W.A. Curtis to A.A. Bailie 2 pages (attached to AC.2000.3.23-27, 29)
Letter - W.A. Curtis to A.A. Bailie Jan 31, 1970 (attached to AC.2000.3.23-25, 27-29)
Letter - W.A. Curtis to Fred Sandford (attached to AC.2000.3.23-28)
Letter - W.A. Curtis to Sir Roy Dobson , July 26, 1954
Letter J.C. Floyd memo to file - note on visit of Dr. Courtland Perkins, Chief Scientist, USAF July 18/57
Letter J.C. Floyd to Air Vice-Marchal M.M. Hendrick, AMTS, RCAF - discusses Sparrow III and Sparrow X, comments about the Astra I not having the necessary degree of sophistication for the Sparrrow X.
Letter J.C. Floyd to Dr. Courtland S. Perkins, Chief Scientist, USAF - attaching key CF-105 briefing charts which had been discussed
Letter J.C. Floyd to Dr. D.C. MacPhail, Director NAE acknowledging copies of reports
Letter J.C. Floyd to F.T. Smye - Honeycomb Construction
Letter J.C. Floyd to F.T. Smye - Some highlights of visit to Ottawa March 6-8/57
Letter J.C. Floyd to F.T. Smye - engineering organization, with particular reference to CF-105
Letter J.C. Floyd to F.T. Smye - notes on discussion with G/C Footit.
Letter J.C. Floyd to I. Fleming discussing Arrow specs, comments on the days of manned fighter "are obviosly numbered" and referencing an old photo of the technical office at Chadderton where I. Flemming and Tommy Thomson were included.
Letter J.C. Floyd to J.A. Chamberlin - project research group
Letter J.C. Floyd to J.A. Morley - change control CF-105 aircraft
Letter J.C. Floyd to J.L. Orr, Director of Engineering Defence Research Board - discusses CMO values - open vs faired intakes and data from NACA and the free flight model data plus details on drag
Letter J.C. Floyd to J.R. Douglas - CF-105 Mark 1 - model specification
Letter J.C. Floyd to R.N. Lindley - general notes on the CF-105 Mark 1, Mark 2, salaries, PSC Applied Research, R.C.A., project studies including reconnaissance version of CF-105, Navy V.T.O, Northrop Trainer, Mono-rail for Eastern Canada, Convair F102A
Letter J.C. Floyd to R.N. Lindley - items arising out of management meeting, June 17/57.
Letter J.C. Floyd to S.D. Davies, Managing Director Dowty Hydraulic Units Ltd. - discusses hoping for Arrow 1's first flight around Christmas Day.
Letter J.C. Floyd to Sir Sydney Camm, CBE, F.R.Ae.S, Hawker Aircraft Limited - discusses fabricated parts in titanium and a note on the metallurgical side prepared by Mr. Smallman-Tew, Chief Metallurgist
Letter J.C. Floyd to W/C E.P. Bridgland, Techical Services Detachment RCAF at Avro Aircraft Limited - Arrow Performance
Letter K.A. Salter Secretary to J.C. Floyd to J.R. Ewans, A.V. Roe & Company Ltd - enclosing reports on the Arrow 2 as requested
Letter M.A. Pesando to J.C. Floyd - Curtis-Wright ramjets
Letter M.A. Pesando to J.C. Floyd - Mondified Long Range Arrow
Letter Outlining the Mission Requirements for a Bomber for the USAF and Possibility of the Arrow being Designed to Meet these Requirements
Letter and attachment from Fred Smye to Dr. J.J. Brown
Letter by Chairman signed by G.S. Field to Defence Research Member, Canadian Joint Staff Washington, DC - re AVRO VTOL Vehicles
Letter by J.J. Green-Defence Research Board re AVRO VTOL Vehicles
Letter discussing some design considerations for the Mark6 Version of the CF100
Letter from "O.P. Weyland" General, USAF Commander to Crawford Gordon, Jr
Letter from British Joint Services Mission to Crawford Gordon
Letter from Frank B. Rackley, President of Jessop Steel Company to Crawford Gordon, Jr.
Letter from Fred Smye to all employees advising of reduced CF-100 Production
Letter from J.C.Floyd to Nova Scotia Technical College re: use of engines from Avro Jetliner
Letter from Jessop Steel Company
Letter from Jim Floyd to Harvey Smith re: Suggested Policy on C-105
Letter from Jim Floyd to Mr. P. L. Sutcliffe re: Area Rule
Letter from Jim Floyd to Sir Roy Dobson re: Visit to A.V.Roe UK
Letter from Les Wilkinson to Shiela Robinson
Letter from RCAF HQ John W. Abrams to Chairman, Research Board
Letter from Roy Dobson to Air Marshal Curtis
Letter from Roy Dobson to Ted Emmert
Letter from Roy Dobson to W.A. Curtis
Letter from Roy Dobson to W.A.Curtis
Letter from Sir Roy Dobson to Air Marshal W.A.Curtis
Letter from T.D. Earl to Aerodynamics lising personnel changes Apr/57
Letter from T.D. Earl to Aerodynamics lising personnel changes Feb/57
Letter from Verdon Smith, The Bristol Aeroplane Company, to Air Marshall Curtis
Letter from W.A. Curtis o Roy Dobson
Letter from W.A. Curtis to Roy Dobson
Letter from W.A. Curtis to Roy Dobson RE: Proposed Changes in by-laws
Letter from W.A. Curtis to Ted Emmert
Letter from W.A. Curtis to Ted Emmert
Letter from W.A.Curtis to Canadian Bank of Commerce
Letter from W.A.Curtis to Roger Lewis, Pan American World Airways Ltd.
Letter from W.A.Curtis to Roy Dobson
Letter from W.A.Curtis to Sir Roy Dobson re. Stroukoff Aircraft Corp.
Letter from W.A.Curtis to Sir Roy Dobson re. Stroukoff Aircraft Corp. and a letter they sent Sir Roy.
Letter from W.A.Curtis to Ted Emmert
Letter from W.A.Curtis to Ted Emmert - Letter arranging a meeting between Emmert and Roy Dobson in England.
Letter from W.A.Curtis to Ted Emmert - response to terms and conditions of proposed employment agreement
Letter from W.R. Harper for defence research member to chairman, research board
Letter from the Deputy Minister National Defence to Major General The Honourable G.R Pearkes
Letter from unknown source to the Air Member Canadian Joint Staff in Washington D.C. USA with respect to BOMARC Liaison Activities.
Letter of acknowledgement by W.E. Cove re request from J.L.Orr for final draft
Letter regarding Velvet Glove
Letter to Assistant Deputy Minister, Department of Defence Production - Screening of Surplus Inventories Resulting from the Termination of the Arrow Program
Letter to Chief of Air Staff - RE: Arrow Electronic System - Genie Installation
Letter to Chief of Air Staff RE: Arrow Electronic System - Radome Implications for Genie
Letter to Chiefs of Staff
Letter to Commander, Detachment #1, Headquarters, A.R.D.C. Attn: RDZ-SBA from John R. Douglas, Contracts Administrator Avro Aircraft RE: USAF Contract AF 33(600) 30161 - Project 1794
Letter to Crown Assests Disposal Corp
Letter to DARA/RPO Arrow RE: Arrow 2 - Installation of the Genie Unguided Rocket
Letter to Editor - Jun 1954
Letter to F.T. Smye Subject Complaint from D.L. Thompson on Avro's over-enthusiasm on Sparrow Program
Letter to F.T. Smye dealing with solutions to wing failure problems with Mark 5 Version of CF-100
Letter to H.R.Smith from Jim Floyd re: Estimate of total parts and changes
Letter to J.C. Floyd in England from VP of Trans World Airlines
Letter to John McCulloch from Jim Floyd re: CF-105 Standard Aircraft Characteristics
Letter to John McCulloch from Jim Floyd re: Sparrow Missle to fit CF-105
Letter to Mr. Louis Richard, President & GM of Crown Assets Diposal Corp - Confirmation to scrap all completed aircraft
Letter to Mr. Robertson of the Canadian Broadcasting Corporation from National Defence Headquarters, Ottawa
Letter to RCAF Plant Rep at RCA RE: Arrow Weapon System - Genie Installation
Letter to Sir Roy Dobson from Jim Floyd re: Requirements for Arrow and G.O.R. 339
Letter to Vice-Marshall Hendrick from Jim Floyd re: Performance of CF-105
Letter to Wright Patterson AFB RE: Contract AF-33(600)-33522
Letter to museum from Henry Daciuk
Letters - Dec 1951
Letters between Roy Dobson and W.A. Curtis
Letters from W/C F.L. Bernstein to Chief of the Air Staff re: Arrow Electronic System - Genie Information
Letters to the Editor - Dec 1953
Letters to the Editor - Dec 1954
Liaison visit to USA - visit to Oxnard AFB, Califonia
Liberals forced Arrow cancellation
Library Reports
Life & Times of 2864 Dr Pierre Bussières @ RMCC & Beyond
Like Outsized Eggs, Pressed paper pods hold CF-100 Rockets
Links to other Avro related websites
List of Avro Arrow related videos in the Archives of the CBC
List of J. Floyd honours
List of Technical Reports and Status for USAF Project 1974 Contract
Listing of Specifications for USAF Aircraft under Consideration for RCAF Technical Roles
Living history: local men who worked on the Avro Arrow meet for the first time to exchange stories
Load analysis and power system AVRO Arrow II
London Letter - Feb 1947
London Letter - Mar 1946
London Letter July 1954
Lonely clunk
Long Range Arrow P.R.7-1, Appendix 2
Long Range Arrow, PR7-1 Appendix 2
Long Range Jets Forecast Fuel Consumption Improves
Long Range Transport 3 Views
Long Secret Canadian intelligence sealed Avro Arrow's cancellation, new paper says
Long flight
Long range all weather fighter C-104 drawing SK 20038
Long range all weather fighter C-104=6 drawing SK 20045
Long range all weather fighter C-104=H drawing SK 20046
Long range arrow: P. R. 7-1 Appendix 2
Longitudinal stability characteristics and damping in pitch of detla Wings
Looking Back on the Avro Arrow
Lou Wise
Lou Wise: Canada's pilotographer, A Centenary Tribute
MACHINING OPERATIONS PILOTS CANOPY drawing 7-1052-PE 23
MAIN UNDERCARRIAGE ASSEMBLY-LH drawing 7-4292-PE 1
MB-1 Rocket Installation - Arrow Aircraft Safety Requirements
MB-1 Rocket Installation - Arrow Aircraft Transmission of Drawings and Reports
MH 64 G Limiter Status Report
MH Aero Report 51252 - TR6 Arrow Lateral Autopilot Analysis
MH64 G Limited Status
MacLean's - Jan 13, 1997
Macdonald Bros. Aircraft Limited Manufacturers of Turbine Engine Components
Mach Match (F86-Sabre)
Machined Structural Members Wing Complete , Drawing 7-1060-P-E-1
Machined Structural Members Wing Complete , Drawing 7-1060-P-E-1 white on black
Machining Operations, Pilots Canopy, Drawing 7-0152-PE23
Machining approach to aircraft production
Macleans Avro ad 1
Macleans Avro ad 6
Macleans Avro ad 7
Macleans Avro ad 8
Macleans letters - via Diefenbaker Web
Made for Canada: The Story of Avro's Arrow
Magazine Cover
Magazine Cover Picture Shows Secret Jet Model
Magazine cover - Aircraft July 1955
Magazine cover - Aircraft Oct. 1953
Magazine cover - Aircraft Oct. 1954 - CF-100 Canuck
Magazine cover - Canadian aviation June 1951
Magellan Aerospace - Wikipedia
Magellan Aerospace Corp.
Main A/C static tests Report No. & 7/0500/7
Main Landing Gear for Avro's Arrow
Main Torque Box Assy - Inner wings fuel system drawing 7-1062-7 sheet 3
Main U/C Door inner - Inner Wing
Maintenance - Apr 1948
Major Assy jig C-105 Nose Section , Drawing 7-0152-PE-41
Major machine parts - engine bay area drawing 7-1058-PE-1003
Major machine parts duct bay area drawing 7-1056-PE 1000
Making of modern world
Malton Aerial View b&w
Malton Aerial View, July 15, 1955
Malton Book, Part 3
Malton Book, Part 4
Malton Test Success, Jetliner Buzzes Field
Management Engineering Streamlines RCAF Operations Stretches Defence Dollars
Manned or Unmanned
Manoeuvre Limiting Devices in the Arrow Damper
Manufacturing Joint at Stn 255, Drawing 7-4300-PE-8
Manufacturing interchangeability Joint at 255 sheet 1 of 3 , Drawing 7-4300-PE-8
Manufacturing interchangeabilty joint station 485-0, Drawing 7-4300-PE-7
Manufacturing the Avro Orenda Jet Engine
Manufacturing the J79 at Orenda
Manufacturing the Orenda Jet Engine at Avro Canada
Many fear that Canada without Arrow will be committed to US
Map of Plant Area
Mario Pesando - National Steel Car & Victory Aircraft
Mark 4: A Nw CF-100 Variant
Mark III Intake Design Part II Effect of Intake and Ejector Geometry on Thrust and Fuel Consumption
Marker's Clunk
Marks of Distinction
Mars Attacks
Martin Baker ejection Seat
Mary Buchanon letter
Mass Layoffs 2nd KO punch for Nobel Men
Master Model Inner Wing Leading Edge R.H., Drawing 7-1062-6-MM1
Master Model Outer Wing Leading Edge R.H., Drawing 7-1064-2-MM1
Master Model inner wing, Drawing 7-1062-3-MM1
Materials: proprietary list of Arrow 2
Matrix Method of Structural Analysis Including Temperature Effects
Matthews notes on C-102
May mean end of Orenda Firm, Avro Sister
McCurdy Award
Measurements of delays in escape from tandem-crewed aircraft Report No. 70/NUFAC/1
Mechanization of Air Data Computers
Media Articles - Avro Arrow
Meet a Community Elder: Wendy Kulhay
Meeting Minutes addressed to J. Likasiewicz & O.E. Michaelsen
Meeting to Discuss CF-105 Problems held December 20 & 21 1954 at National Advisory Committee for Aeronautics , Washington D.C.
Meetings at AFHQ re. Electronic Systems for CF-105
Memo - Arrow Cancellation - Disposal of Materiel
Memo Mar 26 59 to the Minister from Hugh Campbell Subject Arrow Cancellation - Disposal of material
Memo re Design Study of the Coleopter Target Drone Aircraft
Memo to Aerodynamics Dept, Special Projects Group Re: Administration
Memo to Avro (Douglas, J.R., Contracts Administrator)
Memo to CAE RE: Arrow Weapons System - Genie Installation
Memo to CAE Re: Arrow Weapon System - Genie Installation
Memo to DADR RE: Arrow Weapons System - Genie Installation
Memo to Employees of Orenda Engines Limited
Memo to F.D.M. Williams re: Fuel Properties
Memo to File, Project 1794
Memo to McPhee from MCPC
Memo to PM Sep 5 58
Memo to all Engineering Personnel
Memo to all Special Projects Personnel
Memo to all Special Projects Personnel - descibes waste disposal requirements
Memo to all Special Projects Personnel RE: visit of Major W.R. Stephens of the USAF
Memo to staff - Requesting standardized format to fit with USAF standards
Memo to staff providing instruction to record all reports written by Technical Office
Memo to staff providing numbers off the Technical Reports required by WADC
Memorandum for the Prime Minister re The 105 Problem
Memorandum on Production Sharing Program - United States and Canada
Memorandum on Production Sharing Program - United States and Canada
Memorandum to Cabinet Defence Committee CF-105 Development Programme
Met Official
Method to simplify Lub'n of Rudder Bearings (FIN) Drawing 7-0115-519
Mightiest Jet, Canada's CF-100 Flown
Milestones - Avro 504
Milestones in Progress
Military - Oct 1962
Military Versions of the Avro Jetliner
Milk on Credit for 3,500 - Couldn't see wives cry
Milling Fixture - Mill 30 Teeth in disc - 5th Stage Rotor Disc - Drawing 1-F-023682
Milling Fixture Turbine Rotor Shaft - Tool 1-F-031948; Sht 1 of 5
Milling Fixture for Turbine Rotor Shaft - Tool 1-F-031948; Sht 1
Milling Fixture-Details Turbine Rotor Shaft - Tool 1-F-031948: Sht 2 of 5 - Part 70136
Minding your business
Minding your business - 1959-02-14
Minding your business 3
Mini Avro Arrow being built near Calgary
Minimum Instrumentation for Part 1 Testing
Minimum Instrumentation for Part 1 Testing
Minimum Instrumentation for Part 1 Testing
Minimum drag tests on the C-105 1/80 scale model
Mining to Jets
Minute Sheet
Minutes of a meeting held on 14 July 1953 at St. Giles Court to discuss Avro Canada Project "Y"
Minutes, Board of Directors, Hawker Siddeley Canada Ltd.
Misc Engines
Missile Marriage for CF-104?
Missileaney - Jun 1958
Missiles - Aug 1958
Missiles - Feb 1959
Missiles - Jan 1958
Missiles - May 1958
Missiles from the south: the Bomarc
Missiles not enough - Canada Needs It says Zurakowski
Mk. 5 Failures blamed on overstressing
Mob - 14,000 lose jobs over cancelled Arrow jet
Model Arrow Images
Model Avian 625
Model Avro 511 biplane
Model Avro Arrow found in Lake Ontario
Model Image
Model Program C-105 Aircraft - Series 3B Aircraft
Model Specification For Arrow 2 Airframe and Government Supplied Material Installations (Serial No. 25206) - Copy 52
Model Specification For Arrow 2 Supersonic Interceptor Aircraft
Model Specification For Supersonic All-Weather Interceptor Aircraft Type CF105
Model design
Model of Jetliner
Model specification for Arrow 2 airframe and government supplied material installations (serial no. 25206) - Copy 46
Model specification for Arrow 2 supersonic interceptor aircraft
Model specification for supersonic aircraft type CF105 MARK 1
Modelling the Avro Arrow
Modern Weapons for a Modern Air Force
Modification of the Mass Flow Controller theory to the concept of complete flow guidance by the rotor
Moments and Milestones
Monthly Report - April 1956
More CF-100's overseas
More Power by Orenda
More Power for Air Power
More Powerful G-E Jet Engine
More about the CF-100
More power for the Sabre
Moscow must be laughing
Most Modern Carrier destined for Canada
Move this .005"… …to move these with ease at 600 M.P.H.
Movie blurs line between fact, fiction
Mr. A, Drafting Template - half scale pilot figure
Mr. A.V. Roe
Mr. Howe regrets Jet Fate
Must produce or be buffer: Croll
Must we become a satellite?
Mythical Avro Arrow Lands in Calgary
N.A.E Low Speed Model Full Span Scale .07 Sections 1 - 6
N.A.E. "low speed" model full span scale .07 Report No. P/MODELS/14
N.A.E. "spinning" model scale 1/24 (C-105 aircraft) Report No. P/MODELS/15
N.A.E. "supersonic" model C-105 aircraft full span scale 1/80 Report No. P/MODELS/12
N.A.E. "supersonic" model C-105 aircraft reflection plane scale .02 Report No. P/MODELS/11
NAE Low Speed Model, Full Span Scale .07
NAE Spinning Model, Scale 1/24
NAE Supersonic Model Aircraft C-105 Reflection plane Scale .02 - P/Models/11
NAE Supersonic Model C-105 Aircraft Full Span Scale 1/80 Report P/Models/12
NAE summary of estimated supersonic performance of CF-105
NORAD Failure Bossted War Risk
NORAD Proposal solved PM's problem - Re-establish civilian control is Ottawa Defence Aim
NORAD fax to/from
NORAD hits stride, now packs enough defence 'to win a war'
NOSE WHEEL RETRACTION
NOSE WHEEL STEERING TEST
NYLON PARACHUTE TESTS
Names in the News - Apr 1950
Names in the News - Apr 1956
Names in the News - Apr 1958
Names in the News - Apr 1959
Names in the News - Apr 1960
Names in the News - Apr 1962
Names in the News - Aug 1949
Names in the News - Aug 1951
Names in the News - Aug 1952
Names in the News - Aug 1954
Names in the News - Aug 1956
Names in the News - Aug 1957
Names in the News - Aug 1958
Names in the News - Aug 1962
Names in the News - Aug 1963
Names in the News - Dec 1948
Names in the News - Dec 1949
Names in the News - Dec 1950
Names in the News - Dec 1952
Names in the News - Dec 1953
Names in the News - Dec 1957
Names in the News - Feb 1952
Names in the News - Feb 1954
Names in the News - Feb 1956
Names in the News - Feb 1958
Names in the News - Feb 1960
Names in the News - Feb 1962
Names in the News - Jan 1949
Names in the News - Jan 1952
Names in the News - Jan 1954
Names in the News - Jan 1956
Names in the News - Jan 1957
Names in the News - Jul 1953
Names in the News - Jul 1955
Names in the News - Jul 1960
Names in the News - Jun 1952
Names in the News - Jun 1956
Names in the News - Jun 1957
Names in the News - Jun 1958
Names in the News - Jun 1959
Names in the News - Jun 61
Names in the News - Mar 1954
Names in the News - Mar 1956
Names in the News - Mar 1957
Names in the News - Mar 1958
Names in the News - Mar 1959
Names in the News - May 1954
Names in the News - May 1958
Names in the News - May 1959
Names in the News - May 1960
Names in the News - Nov 1954
Names in the News - Nov 1955
Names in the News - Nov 1956
Names in the News - Nov 1957
Names in the News - Oct 1953
Names in the News - Oct 1955
Names in the News - Oct 1957
Names in the News - Oct 1957 (second section)
Names in the News - Oct 1958
Names in the News - Oct 1960
Names in the News - Sep 1952
Names in the News - Sep 1957
Names in the News - Sep 1960
Names in the News 9-55
Names in the News- Jan 1950
Names in the news -
Names in the news - Apr 1949
Names in the news - Aug 1950
Names in the news - Aug 1953
Names in the news - Aug 1960
Names in the news - Dec 1951
Names in the news - Dec 1960
Names in the news - Jul 1949
Names in the news - Jul 1951
Names in the news - Jul 1957
Names in the news - Jul 1959
Names in the news - Jul 1962
Names in the news - Jun 1953
Names in the news - Jun 1960
Names in the news - Mar 1950
Names in the news - Mar 1953
Names in the news - Mar 1955
Names in the news - May 1950
Names in the news - May 1951
Names in the news - May 1962
Names in the news - Nov 1950
Names in the news - Nov 1953
Names in the news - Oct 1949
Names in the news - Oct 1954
Names in the news - Oct 1959
Names in the news - Oct 1962
Names in the news - Sep 1950
Names in the news - Sep 1956
Names in the news - Sep 1959
National Research Council's… Aeronautical Lab
Natural frequencies under lateral load of fuselage formers. Stn. 591·65, 644·43, 697·28, 742·50, 485·00, 538·77 Report No. 7-0558-63
Navy Fails to Recover Avro Arrow Models
Negative image, with corresponding positive of CF-100 nose on
Negative of CF-105 #RL201 on Ground-Side View
Never was an Arrow - AVRO Mansion… and the "one" that got away
Never-before-released Avro Arrow footage
New Arrow Flies Exactly to Avro Plan
New Avro President
New Avro machine ups blade output
New British Projects - contenders for the turbine era
New Equipment News - Apr 1951
New Faster than Sound RCAF jet planned to fire 100 radar aimed rockets
New Guided Missiles…
New Literature - Jul 1954
New Orenda Computer
New Products - Nov 1951
New RCAF wings
New Research Centre at Uplands to spark Canadian design effort
New Test Pilot for Avro Canada
New US Jet may be built, based here
New Words for a Sad old Tune
New World Debutante - Jetliner over New York
New lightweight Jets to be built by US
New powerful turbojet - The Orenda Iroquois
New powerful turbojet -The Orenda "Iroquois"
New production test pilot
New tactical aircraft sought
Newest Canadian Jet Can fire 60 Rockets: passes tests by RCAF
News Digest - Jun 1958
News Digest - May 1957
News Digest - Nov 1957
News Digest - Sept 1960
News From Britain - Jul 1960
News From Britain - Sep 1961
News Roundup - Apr - 1956
News Roundup - Apr 1954
News Roundup - Apr 1959
News Roundup - Aug 1956
News Roundup - Aug 1960
News Roundup - Dec 1952
News Roundup - Dec 1953
News Roundup - Dec 1954
News Roundup - Dec 1955
News Roundup - Feb 1953
News Roundup - Feb 1955
News Roundup - Feb 1956
News Roundup - Jan 1950
News Roundup - Jan 1953
News Roundup - Jan 1958
News Roundup - Jul 1951
News Roundup - Jul 1955
News Roundup - Jul 1959
News Roundup - Jun 1953
News Roundup - Mar 1950
News Roundup - Mar 1957
News Roundup - Mar 1959
News Roundup - Mar 1961
News Roundup - May 1950
News Roundup - May 1951
News Roundup - May 1956
News Roundup - May 1959
News Roundup - Nov 1949
News Roundup - Nov 1950
News Roundup - Nov 1951
News Roundup - Nov 1954
News Roundup - Nov 1956
News Roundup - Nov 1958
News Roundup - Nov 1960
News Roundup - Oct 1953
News Roundup - Oct 1956
News Roundup - Oct 1957
News Roundup - Oct 1958
News Roundup - Oct 1959
News Roundup - Oct 1960
News Roundup - Sep 1953
News Roundup - Sep 1959
News Rounup - Jan 1949
News digest - Dec 1961
News digest - Jan 1959
News from Britain - June 1958
News from Britain - Oct 1957
News from Britian - Sep 1955
News from Down under - Dec 1949
News roundup - Dec 1950
Nike Hercules Missile
No 4792 - United States of America and Canada - Exchange of notes constituting and agreement concerting the establishment of a Canada-US Ministerial Committee on Joint Defence. Oct 29 Aug and 2 Sep 1958
No Ceiling to Achievment At Avro, Manchester
No Flights of Fancy
No Flights of Fancy at Armstrong Siddeley Motors
No decision on new planes for NATO units
No delay in Avro Arrow Program
No ice today
No other work for makers of Arrow or Engines --Ottawa
Nobel Organization Chart
Nobel photo
Nortel and the Arrow Myth
North America's First "Regional" Jetliner: The Avro C102
North American Air Defense Command
North American F-108A _Rapier
North American F-86 A-L Sabre in USAF and Foreign Service - Arco-Aircom No.19
North American XF-108 Rapier
North Star slander
Norther buffer defends Canada
Northern Defenses Outlined
Northern Flight magazine, Vol. 3. No. 4, August 1996
Northrop entry makes progress
Nose Final Marry Up, J10, Drawing 7-1052-IAJB
Nose final marry up jig drawing 7-1052-1 AJ3
Nose for trouble
Nose utility hydraulics drawing 7-4352-PE-35
Not just a model airplane
Note on aerodynamic stability problems encountered on the CF-105
Note on elevator power and pitching moment at zero lift of CF-105
Note on supersonic bombers powered by turbo-jets - report AE-62 - copy 4
Note on the effect of interceptor performance on kill potential
Note signed by Floyd
Note to File -written by W.A.B. Douglas - CBC Programme on the Avro Arrow written
Note to File prepared by J.C. Floyd following meeting with Air Vice Marshall Easton in Ottawa with J.L. Plant, discussion future plans for Canuck, trainers, Jet transport
Notes of a Meeting to Confirm a USAF Appraisal of the CF 105 held at Avro Aircraft, Malton November 1, 1955
Notes on A.V. Roe Project "Y" in Response to Assessments Carried out by RAE and NTGE
Notes on Aerodynamic and Control Problems in the Design of Avro Arrow
Notes on Arrow Project
Notes on Arrow Project. Questions Most often Asked and some notes on these items
Notes on Developments at Malton
Notes on Proposed Design of CF-105 Armament Pack Hoist/Transport Trailer. Report LOG/105/44
Notes on a meeting to discuss C-105 problems at National Advisory Committee for Aeronautics
Notes on a visit to N.A.C.A./Laboratories to discuss aerodynamic problems of CF-105 aircraft
Notes on proposed design of CF-105 armament pack hoist/transport trailer
Notes on the discussion in Washington of some aerodynamic problems of the C-105 aircraft project
Notes on the operation and installation of the Sparrow II missile Report No. C105-R-0003
Nothing to show for $400,000,000
Notice of Annual Meeting
Notice of Annual Meeting of Shareholders
Notice of Hiring - Gordon Allen Hamilton
Nylon net stops 17 ton CF-100
ONE OF 2 SURVIVING AVRO ARROW IROQUOIS ENGINES
Obituary Arrow Knell Tolled
Objective: Freedom
October 21, 1949 Pay Stub for R.W. Waechter for 5 Day's Wages-$59.50
Old Friends
Olé for Canada's Rebel Guitar Maker
On Production of an All Weather Long Range Jet Fighter
One Canada
One Canada, The Crusading Years 1895-1956
One Canada, The Tumultuous Years 1962-1967
One Straight Arrow
One Third of MP's Miss Arrow Debate
Online Avrocar kit
Ontario Science Center images
Opening Notes
Operation of a Service Department
Operational Status Nears for Bomarc
Operator's Notes - Nov 1958
Operators' Notes - Mar 1956
Operators' Notes - Sep 1956
Opposition Mixed up on Arrow Criticism / Mass Layoffs 2nd KO punch for Nobel men
Orenda
Orenda
Orenda - 50 yrs
Orenda - Wikipedia
Orenda 14 Engine SN 5056 on Wheeled Dolly
Orenda 8 Engine at The Hangar Flight Museum
Orenda Aerospace
Orenda Aerospace building - showing main entrance
Orenda Aerospace building - showing sign
Orenda Brochure - A Canadian Contribution to Industrial Technology
Orenda Cigarette Lighter circa 1952; zippo style; produced by Ronson in Toronto Canada
Orenda Courses / Big Drop Hammer / New Forming Press
Orenda Drawing - Wing Tank Ramjet Scheme 35 Dia. (Curtis-Wright Proposal)
Orenda Engine Turbine Blade
Orenda Engine on Display at NAM Ottawa
Orenda Engineering Org Chart
Orenda Engineering Org Chart
Orenda Engines
Orenda Engines Limited, Malton
Orenda Gas Turbine Installations
Orenda Iroquios on stand
Orenda Iroquois
Orenda Iroquois
Orenda Iroquois - Toronto 1957
Orenda Iroquois Engine
Orenda Iroquois Engine Mounted for Display
Orenda Iroquois Engine against clouds
Orenda Iroquois Engine on Wheeled Dolly at Orenda Plant
Orenda Iroquois Engine with 2 Workers at Orenda Plant
Orenda Iroquois X-116 at S&S Turbines 3
Orenda Iroquois at S&S Turbines 2
Orenda J-79-7 Program: Planning the Power for the CF-104 - May 1961
Orenda Military Engine Production
Orenda Model OE600A - Installation manual - condensed version
Orenda Nameplate- from an industrial gas compressor
Orenda News - Fall 1981
Orenda News Mar-Apr 1972
Orenda News Q3 1981 (extract)
Orenda Overhaul Data Plate- A.V.Roe Canada
Orenda PS16 Preliminary Preformance Estimates and Mechanical Description
Orenda Pocket Handbook
Orenda Program
Orenda Series V-8 Aero Engines
Orenda Tie-pins
Orenda Turbojet - S&S Turbines - Maddex Turbines
Orenda ad
Orenda and the Computer - John Duggan, Flight-Lieutenant Ba Peng (ret'd)
Orenda and the Orenda-powered CF-100 steal the show at Farnborough…
Orenda building - showing two different buildings
Orenda image E15611
Orenda interior - engine assembly
Orenda interior - image 1
Orenda interior - image 2
Orenda interior - industrial assembly
Orenda list of supervisors
Orenda power going places
Orenda powered SABRE V files Ottawa-Montreal round trip at 732.5 m.p.h.
Orenda to fly its power giant
Orenda's Arrow, flying toward the four corners of the earth…
Orenda's PS-13 Progresses
Orenda's Program Gets New Boost - Aug 1961
Orenda- Power For The Jet Age
Orenda- Presenting the Orenda Story Brochure
Orendas Up In Front with the RCAF
Orendas... in Operational Service on Four Continents
Orendas… 2000 in service
Orendas… over 2500 in service
Orendas…with 2300 in service
Organisation - Advanced Projects Group
Organization - Memo Issued by C.A. Grinyer announcing the appointment to S.L. Britton as the Project Engineer for the P.S. 13 engine
Organizational Charts
Original pay slips (weekly) from A.V.Roe Canada Limited for George Ryning
Other Small Engines
Ottawa Delays Decision on Arrow
Ottawa Report - 1948
Ottawa Report - Feb 1947
Ottawa Report - Jan 1948
Ottawa Report - Mar 1948
Ottawa-Winnipeg hop made inside 3 hours jet can outfly sound
Our Canada - Oct/Nov 2021
Our Defense Alliance Upheld
Our Strategic Pool of Engineers
Our beloved Arrow
Out of the Past - Progress? The VZ-9 'Avrocar'
Outboard Engine C-105 3 View
Outer wing Interchangeability Control Points , Drawing 7-4364-PE10
Outer wing master model - drawing 7-1064-1-MM1
Outline for CF100 Flight Testing
Outlook newer brighter Noncrieff tells AITA
Outrageous fortune
Outstanding Opportunities for ENGINEERS SCIENTIST MATEMATICIANS
Over the Top
Overhead image of Arrow construction
Overtime
P25 2TF-RB141 Interior Arrangement
P25 Interior Arrangement
P25 w 4 Bristol Orpheus 6 Engines
P25-3TF-TJF10AI - exterior 3 view
P25-4TJ Orpheus 6
PCs can solve Avro, says Mr G
PM gives hard facts on Defence
POOR MAN’S OPTICAL LANDING AID
PS13 first preliminary mock-up inspection|Mock-up board report. Report DAEng-47
Packard concentrates on Turbine Engines
Panicky Feds Call in the Yanks
Paper Toy model Instructions
Passing Show
Patterson Heads CAI; Floyd wins McCurdy Award
Pay Stub
Paying our own way
Pearkes Discusses the Bomarcs
Pearkes and the Avro Arrow
Penhold Bunker - misc 4x6 prints and scanned prints on CD
People - Apr 1955
People - Apr 1956
People - Apr 1957
People - Aug 1955
People - Aug 1956
People - Aug 1957
People - Aug 1963
People - Dec 1957
People - Dec 1960
People - Dec 1962
People - Dec 1965
People - Feb 1956
People - Feb 1958
People - Feb 1959
People - Feb 1961
People - Feb 1963
People - Feb 1967
People - Jan 1957
People - Jan 1958
People - Jul 1955
People - Jul 1956
People - Jul 1959
People - Jul 1960
People - Jun 1955
People - Jun 1957
People - Jun 1958
People - Jun 1962
People - Jun 1966
People - Mar 1952
People - Mar 1955
People - Mar 1956
People - Mar 1958
People - Mar 1960
People - Mar 1962
People - Mar 1963
People - March 1959
People - May 1955
People - May 1957
People - Nov 1957
People - Nov 1958
People - Nov 1959
People - Nov 1963
People - Nov 1968
People - Oct 1961
People - Sep 1956
People - Sep 1959
People - Sep 1960
People - Sep 1963
People - Sep 1964
People in news - May 1958
People in the News - Aug 1948
People in the News - Feb 1948
People in the News - Sep 1948
People in the news - Apr 1947
People in the news - Dec 1948
Performance Analysis of Flights Prior to Phase 2 Performance Testing
Performance Data from Arrow 1 Flight Tests
Performance Data from Arrow I Flight tests
Performance and loading characteristics for the S.A.F.T. battery
Performance of Arrow 2 with Iroquois Series 2 Production Engines 124
Performance of the Arrow 2 - Periodic Performance Report 15
Performance of the Arrow 2 Appendix 1 - Periodic Performance Report No. 15
Performance of the Arrow 2 aircraft 25206 with derated Iroquois (engine nos. 116 & 117): periodic performance report no. 15A
Performance of the Arrow 2 with Iroquois series 2 production engines 124: periodic performance report no. 15B
Performance of the Arrow 2: ferry missions with armament bay fuel: addendum 1 to periodic performance report no. 14
Performance of the Arrow 2: periodic performance report 14
Performance of the Arrow 2: periodic performance report no. 15
Performance of the Arrow 2: periodic performance report no. 15: appendix 1
Periodic Performance Report #15 of the Arrow 2
Personal letter from Sir Roy Dobson to W.A.Curtis
Personal letter from W.A.Curtis to Sir Roy Dobson.
Personal letter from W.A.Curtis to Sir Thomas Sopwith
Peter Bonell
Peter Dempson
Pettersson appointment
Photo Album - Avro Canuck - Courtesy of Peter Cope
Photo Tour of the A.V. Roe Canada Heritage Museum
Photo of 38 Avro Canada executive secretaries getting together at the King Edward Hotel
Photo of 4 Test Pilots looking into Cockpit of Arrow
Photo of Arrow on Assembly Line in early stage of Construction
Photo of Pilot Ian Zurakowski starting up ladder to Arrow Cockpit
Photo of USAF Bomarc Missle on Launchpad in Massachusetts - image 1
Photo of USAF Bomarc Missle on Launchpad in Massachusetts - image 2
Photo of workers from Victory - 1
Photo of workers from Victory - 2
Photo of workers from Victory - 3
Photocopied photos of Wind Tunnel Test Facility for Avrocar - image 1
Photocopied photos of Wind Tunnel Test Facility for Avrocar - image 2
Photocopy of First Official Airmail envelope carried on First Flight of Jetliner Toronto to New York
Photograph in a cardboard display folder of Jetliner on tarmac.
Photograph of Jetliner in flight; full side view
Photograph of Jetliner on tarmac, full side view.
Photograph of Jetliner, rear view of nacelles.
Photographs from master set
Photos - The Avro Canada CF-100
Photos - The Avro Canada CF-105 Arrow
Photos of Bomarc Missle with Specifications
Photos of Orenda powered Sabre located in Red Deer at Air Spray Services in 2000
Photos of TAM Avro Replica - image 1
Photos of TAM Avro Replica - image 10
Photos of TAM Avro Replica - image 11
Photos of TAM Avro Replica - image 12
Photos of TAM Avro Replica - image 2
Photos of TAM Avro Replica - image 3
Photos of TAM Avro Replica - image 4
Photos of TAM Avro Replica - image 5
Photos of TAM Avro Replica - image 6
Photos of TAM Avro Replica - image 7
Photos of TAM Avro Replica - image 8
Photos of TAM Avro Replica - image 9
Picturebatics tough in CF-100
Pictures of CF-101 and Bomarc
Pilot Peter Cope sitting on Wing of Arrow RL204 on ramp after Diverting to Trenton
Pilot hopes Supersonic tests to be carried out with Arrows
Pilot scans problems flying jet airliners
Pilot unhurt in Blazing Crash-Landing at Malton
Pilot's Operating Instructions-Most Important Technical Publication of All
Pinching the Sabre
Pink CF-100's: Collision Course interception
Pioneers in our Midst
Pipeline - TransCanada and the great debate, A history of business and politics
Plan Covers 1000 more, MPs Told
Plane Patter - Feb 1959
Plane Patter - May 1960
Plane Patter - Sep 1961
Plane Patter / Current & Candid / Readers' Reaction
Plane Patter / Readers Reaction
Plane manoeuvres at maximum 'g' for the CF-105 Report No. Extract 2 - A47/A.C. Man./2
Planes in the news - Mar 1955
Plant Safety
Plea made by Hellyer for action
Pledges a mockery, CCF Council claims
Pneumatic Drill
Pneumatic services trailer C-105 Report LOG/105/22
Post Arrow Timeline
Post-Arrow Brain Drain
Postage Stamp
Postcard commemorating the first flight of the C102 Avro Jetliner August 10, 1949.
Poster - Arrow RL205 above Clouds
Poster - Avro Half Century Poster - Framed
Powassan resident talks about his Avro Arrow collection of photographs
Power For Jetflight
Power Plant Bay INTERCHANGEABILITY Drawing 7/4356-PE3
Power for the CF-105
Power from Pratt & Whitney
Power to Burn
Power to Spare - Advertisement for Orenda Jet engines, now being delivered to R.C.A.F. in Canada and also destined to R.A.F. Sations in England and NATO bases in Europe for Canadian made F-86 Sabres.
Power unit for the Avro Vulcan
Power: the Pratt and Whitney Canada Story
Powerhouse for peace
Powerplant... With a Mision
Powerplant… with a mission
Pratt & Whitney J-52 engine
Pre-Flight - Dec 1999
Pre-Flight - Vol 10 No 3
Pre-Flight - Vol 11 No 1
Pre-Flight - Vol 11 No 3
Pre-Flight - Vol 11 No 5
Pre-Flight - Vol 11, No 4
Pre-Flight - Vol 11, No.6
Pre-Flight - Vol 12 No 5
Pre-Flight - Vol 12 No3
Pre-Flight - Vol 12 No4
Pre-Flight - Vol 13 No 1
Pre-Flight - Vol 13 No 6
Pre-Flight - Vol 14 No5
Pre-Flight - Vol 14 No6
Pre-Flight - Vol 15 No 1
Pre-Flight - Vol 15 No 6
Pre-Flight - Vol 15 No2
Pre-Flight - Vol 16 No 1
Pre-Flight - Vol 16 No 4
Pre-Flight - Vol 16 No 5
Pre-Flight - Vol 16 No 6
Pre-Flight - Vol 16 No2
Pre-Flight - Vol 17 No 2
Pre-Flight - Vol 17 No 5
Pre-Flight - Vol 17 No3
Pre-Flight - Vol 18 No 1
Pre-Flight - Vol 18 No 4
Pre-Flight - Vol 18 No 5
Pre-Flight - Vol 18 No2
Pre-Flight - Vol 18 No6
Pre-Flight - Vol 19 No 1
Pre-Flight - Vol 19 No2
Pre-Flight - Vol 19 No3
Pre-Flight - Vol 19 No4
Pre-Flight - Vol 19 No5
Pre-Flight - Vol 19 No6
Pre-Flight - Vol 20 No 3
Pre-Flight - Vol 20 No1
Pre-Flight - Vol 20 No6
Pre-Flight - Vol 21 No 4
Pre-Flight - Vol 21 No 6
Pre-Flight - Vol 21 No1
Pre-Flight - Vol 21 No3
Pre-Flight - Vol 21 No5
Pre-Flight - Vol 22 No 2
Pre-Flight - Vol 22 No5
Pre-Flight - Vol 22 No6
Pre-Flight - Vol 23 No 6
Pre-Flight - Vol 24 No 1
Pre-Flight - Vol 24 No 2
Pre-Flight - Vol 24 No 5
Pre-Flight - Vol 24 No 6
Pre-Flight - Vol 25 No 1
Pre-Flight - Vol 27 No 5
Pre-Flight - Vol 27 No 6
Pre-Flight - Vol 28 No 1
Pre-Flight - Vol 6 No 7
Pre-Flight - Vol 7 No 1
Pre-Flight - Vol 7 No 6 (partial copy)
Pre-Flight - Vol 8 No 1
Pre-Flight - Vol 8 No1
Pre-Flight - Vol 9 No 2
Pre-Flight - Vol 9 No3
Pre-Flight - Vol.7, No 3
Pre-Flight - Vol.7, No 5 - special
Pre-Flight - Vol.7, No.7
Pre-Flight - Vol10 No1
Pre-Flight - Vol11 No2
Pre-Flight - Vol12 No1
Pre-Flight - Vol12 No2
Pre-Flight - Vol14 No3
Pre-Flight - Vol14 No4
Pre-Flight - Vol15 No3
Pre-Flight - Vol16 No3
Pre-Flight - Vol17 No1
Pre-Flight - Vol18 No3
Pre-Flight - Vol20 No4
Pre-Flight - Vol20 No5
Pre-Flight - Vol21 No2
Pre-Flight - Vol22 No1
Pre-Flight - Vol23 No1
Pre-Flight - Vol23 No2
Pre-Flight - Vol23 No3
Pre-Flight - Vol23 No4
Pre-Flight - Vol23 No5
Pre-Flight - Vol8 No4
Pre-Flight - Vol9 No1
Pre-Flight Jan - Feb 2015
Pre-Flight Nov - Dec 2014
Pre-Flight Sept - Oct 2015
Pre-Flight Vol 10 No 2
Pre-Flight Vol 10 No 4
Pre-Flight Vol 10 No 5
Pre-Flight Vol 10 No 5 (Oct issue)
Pre-Flight Vol 15 No 5
Pre-Flight Vol 17 No 4
Pre-Flight Vol 7 No 2
Pre-Flight Vol 7 No4
Pre-Flight Vol26 No6
Pre-Flight- Vol 27 No 1
Pre-Flight- Vol 27 No 2
Pre-Flight- Vol 27 No 3
Pre-Flight- Vol 27 No 4
Pre-flight - Vol 26 No 3
Pre-flight - Vol 26 No 4
Pre-flight unknown 2011
Predict 1949 Expansion for Aircraft Industry
Predicts 500 mph for Future TCA Planes - Feb 1948
Preformance analysis for CF-105 Skid Control System
Preliminary Aircraft Operating Instructions Arrow 1
Preliminary Aircraft Operating Instructions Arrow 1 Part 1
Preliminary Brochure - Proposed Long Range All-Weather Fighter
Preliminary Comments on the Proposal for an Aircraft Powered by a Radial-Flow Jet Turbine Engine
Preliminary Development Phase of CF-105 Falcon Armament
Preliminary Performance analysis of flights prior to Phase 2 Performance Testing
Preliminary Pilot's Operating Instructions, Arrow 1
Preliminary Pilot's Operating Instructions, Arrow 1
Preliminary Pilot's Operating Instructions, Arrow 1 - Jan 1958
Preliminary Proposal for Arrow 3
Preliminary aircraft operating instruction: Arrow 1
Preliminary development phase of CF-105 Falcon armament
Preliminary electrics scheme for duct bay and centre fuselage drawing 7-1150-P1 Issue 2
Preliminary note on a method of estimating trim drag at supersonic speed
Preliminary note on project "Y" low speed tunnel tests
Preliminary note on the CF-105 intake tests at Lewis LAB
Preliminary notes on specifying a report by Avro Aircraft Limited on the C-105 stability problem
Preliminary report: CF-105 electrical power supply. Report No. E-1 February 2, 1955
Premier Frost Lends a Hand
Premier urges substitute work for Malton
Prerformance of the Arrow 2 - Periodic Performance, Report 15
Presentation box of 5 miniature arrows
Press Release - Jan 2001 - Canada's Aviation Hall of Fame
Press views on the Arrow and Defense
Pressure Distribution Measurements on an Avro Swept Back Wing Model
Pressure Measurements on the Upper and Lower Surface of the Nacelle-Fuselage Fillet of the Avro CF100 Half Model
Pressure Measurements on the Upper and Lower Surfaces of the Nacelle-Fuselage Fillet of the CF-100 Half Model
Pressure from US suggested in memo on fate of Arrow
Pride in our past, faith in our future
Pride of Achievement
Prime Factor in Aircraft Production
Probe Jet Fighter “Leak,” But Here's How Transport Looks
Probing tomorrow's frontiers.. Today!
Process Planning Manufacturing Methods and Tool Designing for PV 704 6-Viper Test Rig
Procurement Poses Problems in Jet Engine Development
Procurement and Logistics
Procurement for a Jet Fighter
Production Engineering Department Tool Design - drawing 7-0152-PE-24
Production Engineering Dept, Orenda
Production Engineering for the Civil Market
Production Lines take years to build
Production Plan I.D.I. Avro
Production of a Fighter
Production of an all weather long range jet fighter
Profile of Arrow RL.201
Program Order - Arrow Unveiling Ceremony
Program Planning Report - Project 1794 Extension Program
Program Planning Report Project 1794 Extension Program - 1957
Program Planning Report for Canadian Government Program for the Avrocar
Program planning report Avro V.T.O.L. Project P.V. 704
Programme Arrow ground equipment demonstration: amendment to AVRO report 72/GEQ/11
Programming for performance data from Arrow 1 aircraft 25203 (phase II) flight tests
Progress Report No. 3, AVROCAR 1, U.S. Army Designation VZ-9AV
Progress Report on the Implementation of the Decisions in Regard to Air Defence taken by Cabinet on 21 Sept, 1958
Progress Report: Avro Jetliner
Progress report by TCA
Progress report: the C-105 Sparrow II: armament installation
Progress report: the CF-105 Sparrow II armament installation
Progress report: the CF-105 Sparrow II armament installation (30 Nov 56 version)
Project "Y" Low Speed Tunnel Test Results
Project "Y": preliminary programme and data for low-speed wind tunnel tests
Project 'Y' - A Theoretical and Preliminary Numerical Study of Stability and Control
Project 'Y' - Theoretical and Preliminary Study of Stability and Control of All-Wing Airplane
Project 'Y' An Assessment of the power plant
Project 'Y' Engine Cost Estimate
Project 1794 24 Sept Conference
Project 1794 Avrocar technical data
Project 1794 Comments on Work Statement
Project 1794 Final Development Summary Report 2 April - 30 May 1956 - USAF Contract No. AF33(600)30161
Project 1794 “Avro Canada VZ 9 Avrocar”
Project 1974 Evaluation
Project Research Group
Project Silver Bug
Project Silverbug
Project Studies Made in the Preliminary Design Office from 1952-1959
Project Studies Made in the Preliminatry Design Office From 1952-1959 (of Avro Canada)
Project Y - Aerodynamic Design and Performance Prediction of the Engine
Project Y - Avro Aircraft's Frost Takes a Flyer into the Future - Mar 1956
Project Y, Iroquois, Jetliner?
Project Y2 - Flat Vertical Take-Off Supersonic Gyroplane June 1954
Project Your Carreer in engineering
Promotional Photo with Gas Turbines logo
Promotional picture of Orenda Engines sitting next to each other forever into the picture
Properties of Metals to be used by test equipment design section - Gas Turbine Division A.V. Roe (Canada) Ltd.
Proposal CF-105 Design and Development Program Brochure AD-14 Issue 2
Proposal Project Y2 - Design and Development Program June 1954-June 1956
Proposal for Further Development of the Avrocar - 500/PROP/13
Proposal for VTOL Visual Fighter
Proposal for a Gas-Turbine Propelled All-Wing Aircraft of Circular Plan Form
Proposal for a Vertical Take-off Fighter
Proposal for ground servicing equipment for Avro Arrow II
Proposal for introduction of dual pressure range variable delivery pumps into the utility hydraulic system
Proposal for the modification of the hydraulic systems to enable the ASTRA hydraulics power to come from the utility instead of the flying control "A" system
Proposal layout of Arrow aircraft description and maintenance instructions
Proposals for a simplification of electrical and electronic wiring and accessories for the C105 aircraft
Proposed Flight Test Program Arrow 1 - Phase 1 Aircraft Report FAR/C105/2 Issue 3
Proposed Installation of Four Internally Stowed "Sparrow 2" Missiles in the CF-105
Proposed Layout of Cabling for radar nose, Drawing 7-1351-PE1
Proposed Mass Flow Controller
Proposed Standard I.R.I.G. Instrument Pack Aircraft Nos. 25209 to 14
Proposed Statement of Work-Project No. 1794
Proposed assemblies using narmco 4021 metlbond technique sht 2 of 2, Drawing 7-4400-C/S-PE-01
Proposed detailed programme for demonstration & evaluation conference on ground support equipment: Arrow 2: addendum to report no. 72/GEQ/11
Proposed layout (electrics) of front & rear cockpit nose section C105 drawing 7-1152-PE2
Proposed layout of Arrow aircraft: description and maintenance instructions
Proposed magnesium skins used on C-105
Propped Transports
Propulsion System Ducted Fan Ram-Jet Aeroplane Project 1794 - Technical Report No. 2
Providing a power plant for the Avro supersonic airframe
Proving Out a Flying Saucer
Proxy of Annual Meeting 1959
Publisher's Choice - Shutting Down the National Dream
Pulling In
Push-button engineering for the Avro CF-105
Pushing back the frontiers of tomorrow…
Quality Control No. 2 - The Case for Government Inspection
Quality in Engineering
Quote - James Floyd - framed 8 1/2 x11
R.F.T. 5034. Add. 1, ARROW 1 - STRUCTURAL INTEGRITY TESTS
RCA Camden meeting agenda
RCA Victor
RCAF 416 Squadron History
RCAF Avo Lancaster KB839
RCAF Avro test pilot Jack Woodman in Helmet with Camera Strapped on top of Helmet
RCAF Comets fly again
RCAF Considers ban on low loop in air displays / Avro jet fighter goes backward at air display
RCAF Design Study Request - Introduction of Pratt and Whitney J75-P6 Engines into Arrow 2 Aircraft (Brochure SS120)
RCAF Engineering Study Request on Arrow 2 Aircraft for Increased Combat Radius
RCAF Fighter wing in UK; Howe claims Canada to lead Long-Range Fighter Output; Chatco to build CF-100 parts
RCAF Programmes - Progress Records
RCAF Trenton first host to Arrow
RCAF adds depth in '55
RCAF appointments
RCAF at 75
RCAF at Crossroads
RCAF design study request: introduction of Pratt and Whitney J75-P6 engines in Arrow 2 aircraft
RCAF discussion notes
RCAF engineering study request on Arrow 2: increased combat radius
RCAF evaluation
RCAF flight number two: Arrow mark I aircraft
RCAF leads 104 safety tally
RCAF pilot flies Arrow
RCAF said out when Bomarc to be fired / "Come to Canada" Britons go home
RCAF to buy 10 US planes but can't build them here
RCAF's CF104
RCMP hunting Jet “Leak”
RE: Supersonic fighter configuration study
RT Vol 12 No 3
Race to the moon
Radar Network Preformer
Radar Nose Equiment Area - Nose section C105, Drawing 7-1152-PE7
Radio Trainer C-102 - drawing SK-20051
Radio Trainer C-102 - drawing SK-20052
Rahmer diary
Raising the Arrow
Raising the Arrow: A TV mini-series
Ralph Waechter wedding card
Ramp and air intake
Randall Whitcomb Bio
Rap failure of Gov't over Avro Plight
Rapier F-108
Rare Birds No. 7 - 'Flying Saucer'
Re-union of Giants
Re: Arrow Terminations - Status Reports
Reactor work may save Avro
Reader Reaction - Mar 1959
Reader Reaction - May 1959
Reader's views on the Arrow and Defense - Mar 2, 1959
Reader's views on the Arrow and Defense - Mar 3, 1959
Readers see Avro Arrow conspiracy
Readers views on Arrow and Defense
Readers views on Arrow and Defense - 1959-02-24
Readers views on the scrapping of the Avro Arrow
Readers' Reaction - Jun 1963
Ready to fight
Rear Fuse & Control Surf-Titanium Content, Drawing 7-0159-PE-12, Sheet 1 of 2
Rear Fuse Eng Nascelles G/A , Drawing 7-0159-PE-08
Rebirth of a Legend
Rebuilding aircraft for peacetime flying
Rebuilding the Arrow?
Rebuttal of Arrow mis-information
Reconnaisance Arrow Drag and Power Summary
Reconnaisance Arrow Drag and Power Summary
Record Breakers - Avians & the Australian connection
Red Jet Bomber
Rediscovering a Legend
Reflections on the Arrow
Reflections on the Arrow
Reflections on the Manchester period
Registration of Avrocar Test Vehicle
Rehearsal for Mach 3 at 100,000 feet
Rehearsal for Mach 3 at 100,000 feet.
Remembering the Arrow
Remembering the Arrow - For John Flippance and wife Jean, aircraft's destruction was real tragedy
Remembering the Avro Arrow
Rendezvous with jetflight
Renegade In Power
Replica Arrow - Wing Section & Main Gear
Replica of legendary fighter jet draws a crowd
Report - Dissertation on the Theory of Mutilation
Report E-2 Estimated power loads for CF-105 aircraft
Report E-2 Issue 2 Estimated power loads for CF-105 aircraft. + Report E-3 Estimated power loads for CF-105 aircraft using Sparrow missiles
Report Number System
Report On Accident To Avro Arrow 1 (252201) Part 2 on June 11, 1958 At Malton
Report Typing
Report from Avro Canada's Chief of Technical Design, Frank Brame, to J.C. Floyd to assist with the Hawker Siddely SST effort
Report from Ottawa - March 1946
Report issue
Report of USAF Scientific Advisory Board on AVRO Project Y2 (Avrocar)
Report of a visit to WADC and HAC, 4 to 16 Dec 58 to assess the Arrow project
Report of a visit to the United States to discuss high-speed wind tunnel design: March 3-7, 1952. Report No. AE-20c
Report on Accident of Arrow 1 25201 on June 11, 1958
Report on a Power-Full Decade
Report on a visit to Ames Aeronautical Laboratory Moffett Field California to discuss aerodynamic problems of the CF105 aircraft on the 9 and 10 Dec 1954
Report on a visit to Pasadena and Moffett Field, May 13-21, 1952
Report on accident to AVRO Arrow I 25201 on 11 June 1958 at Malton
Report on accident to AVRO Arrow I 25201 on 11 June 1958 at Malton. Part 2
Report on the state of the CF-105 project in June 1955
Report on the status of the Arrow weapon system Report No. 9 Issue 2
Request for Engine Instalation Temperature Flight Tests
Request for Flight Test #07-5023 to Determine Temperatures on the Deceleration Parachute for the CF-105
Request for Noise Measurements During Engine Ground Runs
Request for Wheel Brake Tests on Arrow 1
Requiem for a Giant - A.V. Roe Canada and the Avro Arrow
Requirement for, and future development of an angular momentum Mass Flow Controller for Mk 2 Air Conditioning System
Requisition for flight test: AIRCRAFT 25206: ASSIGNMENT X74-4018 R.F.T. No. 07-5091 Addendum 2
Research & Development
Research and Development
Research and Development in Canada's Aircraft Industry
Research and Development the Key to Market Success
Research for Mach 2 - Jul 1955
Resident recalls end of Avro Arrow - Doreen Tuck
Resurrecting the Canadian Dream: The Case for the 21st Century Avro Arrow
Retired Major General Lewis MacKenzie Talks Revival of the CF-105 Avro Arrow
Retirement Income Plan - Avro Aircraft Limited
Return of the Arrow
Reunion stirs memories of jet fighter's glory days
Reveal British Air Expert Told Canadian Jet Secrets
Review of Noise Problems of Arrow Aircraft Mk. 1 & 2
Review of a note on Stability and Control Characteristics of A.V. Roe Project Y
Review of the Maintenance and Reliability Aspects of the Arrow Conrol Surface and Trailing Edge Components 71/Maint/15/3
Revised Sheets 8&9 on Report FAR/C105/2 Issue3
Revised Statement of Work-Project No. 1794 (File Incomplete)
Revisionist Historians - reponding to "Canada's Avro Arrow -- The legend that wasn't"
Richard Lake
Rise and Fall of the Arrow
Rites of Passage: The End of the CF-100
Rob Brigham's road race car (Mustang)
Rob Mercer Avrocar related material
Roberts Joins Criticism of Ottawa Tories
Roberts thinks Avro must have some plan
Rockets & Missiles
Rogue Tory - The Life and Legend of John G. Deifenbaker
Role of the Avro Arrow
Rolls Royce SOAR Turbo-Jet Aero-Engines
Rolls-Royce ad for the Tudor VIII
Ron Adley
Ron Fischer
Ron Nakagawa
Root form broach Fixt - Stator Blades - F-461278 sheet 1 of 5
Rotating Discs with Temperature Gradients
Round the clock
Royal Canadian Air Force - Iroquois Advance Data Sheets Description and Maintenance Instructions January 1958 -Revised January 9, 1959
Rubber Stamp of the Arrow
Rudder G/A, Drawing 7-0184-PE-01
Rudder Interchangeability Control points , Drawing 7-4384-PE-10
Rudder and planning breakdown showing sub assemblies , Drawing 7-0184-PE-13
Runway Barrier Trials with the CF-100
Runway surface requirements Report No. LOG/105/50
S.L. Britton appointment as Project Engineer for the PS 13 engine
SAE guide for aircraft engine drafting practise
SAGE System - NORAD Breeds Electronic Watchdog
SAGE missile control centre at North Bay, Ontario
SLEEVE DEPLOYMENT OF DECELERATION PARACHUTE
SNIFFER TESTS
Sabre - 1/72 Scale model
Satellites
Saturday Overtime
Saturday, March 21, 1998 "First Flight"
Schedule of Tests, Mock-Ups and Models of the CF-105
Scheme for assy jig for engine bay and duct bay
Score sheet on the half century
Scramble to attack
Scrap Arrow - 11,600 jobless
Scraping the Arrow made good sense
Scratch build CF-105 Avro Arrow
Script Review of CBC Movie?
Sea Hawk Is Found in a Sorry State
Secret Blueprints
Secret letter to RCAF Air Vice Marshall D.M. Smith from the National Aeronautical Establishment with respect preliminary wind tunnel test results on the A.V. Roe C/105 design study
Secrets of The Exhibit: The Avro Arrow
Secrets of WW2 Germany flying saucers
See it up to Ottawa to find 13,800 jobs
Seek specialist advice on Arrow
Seeker lock on range requirements for the sparrow 1242D missile
Seems like only yesterday
Senate Debates May 12 to Sept 6, 1958
Sep 20, 1958 Financial Post, If Arrow Dies, Who dies with it?
Separation of Employment
Separation of Employment - Gordon Allen Hamilton
Separation of Employment James Victor Lowson
Service Dept Timesheet
Service News - Facts about the Arrow
Set Traps for Freeloaders
Shackletons in Service
Sheet 5 - Arrow technical production
Shell Oil Company of Canada Limited offers its Congratulations to Avro Canada on the success of the first test flight of the jet-powered airliner in North America
Shelving the Arrow is bad militay, economic medicine
Shock for 15,000 as Ottawa drops Arrow
Shooting down the Arrow myth
Shooting down the Arrow myth
Short Commentary on the feasibility of vertical take-off and landing techniques for the All-Wing Airplane-Project Y
Short Report on visit to B-58 and Chance-Vought Crusader Factories in U.S.A.
Should Canada Have Continued to Build the Avro Arrow (CF-105)?
Shutting Down the National Dream
Shutting down the Avro Myth
Silver Dollar - 1958 British Columbia Centennial designed by Avro Employee Steve Trenka
Sir Edwin Alliott Verdon Roe (1877-1970)
Site Survey for remote test station Report ID MISC-N-46
Six-component super-sonic wind tunnel tests of a 1/80 scale model of the C-105 aircraft
Skyward Ho!
Skyward ho
Slide - CF-105 Avro Arrow RL-201 Taxiing
Slide - CF-105 Avro Arrow RL-201 after 6th flight, parachute out, taxiing in, Jan Zurakowski at the controls
Slings and Arrows
Small (2 inx1 in) Engraved Plaque Commemorating the first flight of the Avro Arrow March 25, 1958
Smye letter to all supervisory staff after Black Friday
Snap-up climb manoeuvres for the CF-105 Report No. Extract A67/A.C. Manoeovers/3
Solving The Riddle of Soviet Air Power
Some Canadian Aircraft Engineering Milestones
Some Effects of Internal Heat Sources on the Design of Flight Structures
Some Thoughts On Future Projects
Some notes on the question of supersonic fighter size
Some of those who guide the aircraft industry
Some performance problems associated with the Mach 2 fighter
Some repairs are needed
Some simple considerations of wing camber and twist at high speeds
Some thoughts on VTOL
Some zero-lift characteristics of a 1/80 scale model of the CF-105 aircraft at test Mach number of 1.57
Soon, the newest product of ORENDA's experience and imagination…
Sound Barrier
Source References For The Avro Arrow - NRC/Rockcliffe/DND - Library and Archives Canada
Soviet Spy Scandal
Spar, Rib and Skin Stresses: C 105. Wing Center Box: C-105. Detail Stress analysis for loading report: C-105. Extract from Stability Reports
Sparks fly over Avro discovery
Sparrow II Loading and Transporter Dolly. Report LOG/105/45
Sparrow II loading and transporter dolly - Report No. LOG/105/45
Sparrow Missile
Special Commottee on Defence Expenditure No 1- Minutes and Proceedings Nov 29, Dec 4 1951
Special Commottee on Defence Expenditure No 2- Minutes and Proceedings Dec 6 1951
Special Commottee on Defence Expenditure No 3- Minutes and Proceedings Dec 10 1951
Special Commottee on Defence Expenditure No 4- Minutes and Proceedings Dec 13 1951
Special Proj Org Chart 1955
Special Project Instructions to Design Office Regarding Avrocar over Several Years
Special Projects Group Technical Report No. 112, Stress Analysis of 1/12 Scale Hovering and Transition Model - September 1957
Specification for Auto Control for NAE Electro-Thermal Wing De-Icing System REport LT_34
Specification for Auto Control for NAE Electro-Thermal Wing De-Icing System Report LT_32
Specification for Rocket Sled Testing of the Arrow Escape System RD.84.B
Specification for Rocket Sled Testing of the Arrow Escape System Report RD.84.A
Specification for development of an integrated electronic system for the CF105 aircraft (Air 7-5)
Specification for development of automated flight control sub-system for CF-105 aircraft (INST 92-5)
Specification for requirements for the Sparrow 2 MK 1 missile for the Arrow 2 aircraft (WSC 1-4)
Specification for weapon system, Arrow: AIR 7-4. Issue 4
Specifications for Auto Control for NAE Electro-Thermal Wing De-icing System
Speech by Air Marshall H.L. Campbell
Speech by George R. Pearkes, V.C. - Arrow Rollout
Speech by George R. Pearkes, V.C. - Arrow Rollout (from package)
Speed spells profit
Speeds up to 5,000 MPH Capacity of NRC Tunnel
Speep well, Alex
Spies, Saboteus and Plant Security
Spliced longeron joint at stn 485, Drawing 7-4300-PE-18
Spud Potocki Obituary
Spud Potocki Obituary
Sputnik gave science education a wel-needed boost
Srreening of Surplus Inventories resulting from the termination of the Arrow Program - Termination group formed
Stability Honeywell Data
Stability and Control
Stability and Control Area Report
Stag photos note
Standard Aircraft Characteristics - Advanced Trainer Airplane "Jetliner" Avro Canada
Standard Aircraft Characteristics CF-105 Production Aircraft
Statement by Frost on Arrow decision
Statement from the President and General Manager Avro Aircraft Limited
Statement of Work for Revised Arrow Program as of Oct 28, 1958 (Brochure AD-53 Issue 2)
Statement of a Year's Investigation of A.V. Roe Canada V.T.O. Project
Stator Blade from Orenda 8-1 Engine circa 1953 other id# 5R3722-B; 22673-3V; 22673-3V CDZ
Status Report 28, Section 10 Fire Control Subsystem Engineering Development
Status of Project 1794 Presentation by USAF - Copies of Overhead Displays
Step called body blow to industry
Steve Paikin (The Agenda) interviewed Avro engineer Liam Dwyer March 18 for a show called Defending Canadian Shores
Stop Order on the Arrow
Storms of Controversy
Storms of Controversy
Straight Arrow - The Janusz Zurakowski Story (part of "a scattering of seeds - the creation of Canada" series)
Straight as an Arrow
Straight up from Malton - Turbo lifting fan work puts Orenda on top of VTOL field
Strategy for the Air War
Stress Report No. 7-0510-3 General aircraft analysis for symmetric loading cases
Stress Report No. 7/0510/5 Issue 2 Load system of the general stress analysis of the aircraft
Strikeback - AVRO Arrow & CF-18 episode 4
Structural Integrity Manoevres as required by Specification MIL-S-5711 (USAF)
Structural Integrity of the Arrow Aircraft: A note on the proposed flight plan
Structural integrity program
Structural investigation of a 1:5.25 scale plastic model of the forward fuselage structure on the C-105 aircraft Report No. P/MODELS/48
Structural investigation of a 3% t/c ratio multi-SPAR plastic model fin Report No. P/MODELS/46
Structure Influence Coefficient Matrices
Sub assembly jigs, Drawing PE-7-1062-1-AJ-1 showing nine jigs
Suggested Projects for Study, Other Than Those Presently On Contract
Summary Of Wind Tunnel Testing On The CF-105 (Stability, Control and Armament Tests Only) Report No. P/Wind Tunnel/131
Summary Review of the Continuation Test Program for the Avrocar - Including Review of Allied Programs
Summary Specifications of CF-105 Avro Arrow taken from Global Aircraft Website in 2008
Summary of Air Defense Budget
Summary of Free Flight Model Tests & Results
Summary of Thermodynamic Reports of General Interest
Summary of firings of free flight models 1 and 2 week commencing December 12th 1954 Report No. P/F.F.M./1
Summary of firings of free flight models 3, 4 and 5, May and June 1955 Report No. P/F.F.M./8
Summary of wind tunnel testing on the CF-105 (stability, control and armament tests only)
Summing Up - ICBM Defence Russ A-Blast Aim?
Summing Up - Time to face nuclear facts
Summing up - Aug 1963
Summing up the Chinook
Super Arrow
Superflops - CF-105/TSR-2
Supersonic CF-105 unveiling on Oct 4
Supersonic Fighter Configuration Study
Supersonic Fighter with 2 - 30" Diam Engines
Supersonic Research in the U.S.Navy
Supersonic Sentinel
Supersonic Sentinel - Student Edition
Supersonic Sentinel - The Story of the Avro Arrow
Supersonic Sentinel - Toronto Aerospace Museum Arrow Rollout
Supersonic Sentinel - Toronto Aerospace Museum Memorial Arrow Rollout
Supersonic fighter configurations
Supersonic fighter with 2-30" diam. engines
Supersonic wind tunnel tests of the 1/40 scale intake model of the C-105 aircraft
Supersonic wind tunnel tests on the effects of engine-off operation on lateral characteristics of the C-105 aircraft. Report AE-46e HSAL-M-59
Survival in the Air Age
Swan song for a new sweeper
Swedes Tour RCAF - Oct 1958
Syllabus Iroquois Engine Maintenance Training
T.G. Higgins Appointment as Project Engineer
TALKBACK
TAM Replica Arrow Rollout, speech by Jim Floyd
TAM Replica Arrow next to CF-18 188782
TAXI EVALUATION OF MIRROR LANDING SYSTEM
TCA's time of decision DC-9 or BAC-One Eleven
TESTING OF THE D-HG32A-1 AIR DATA COMPUTER
TESTS OF FABRIC BASE LAMINATED TREAD TIRES
TITANIUM PART C105
TSR-2
TSR-2 and 18393 in Duxford UK, Oct '79
TSR-2 details
TV World Jan 12 - Jan 18, 1997
TWX to Wright Patterson AFB Contract AF-33(600)-33522
Table Summary of Avro CF-105 Arrow Mk 1 Flight Logs
Tactical aircraft selection - Northrop F-5A-15 - Performance and suitability for Canada's role tipped the scale
Take-off for Tomorrow at Armstrong Whitworth - A.V. Roe Canada Limited
Taking politics out of procurement
Taking the Lead
Tale-Spin EL Baudoux
Tale-Spin Flight Lieutenant Bruce Warren
Taming a flying tiger
Tanker shopping for the CF-5
Target Fixture-Compressor Casing - Tool 1-F-011531, Sht 3 of 20
Target Fixture-Compressor Casing - Tool 1-F-011531, Sht 4 of 20
Target Fixture-Compressor Casing - Tool 1-F-011531, Sht 5 of 20
Target Fixture-Compressor Casing - Tool 1-F-011531; Sht 2 of 20
Target-Towing by CF-100
Target…Flight Test
Team restores missing link in Avro Arrow story
Technical Design Department C.105 Report Catalogue
Technical Design/Progress Report/Payroll Sharing, Projects covering period March 1-July 9, 1959
Technical Publications - in the Aircraft Industry Part I
Technical Publications - in the Aircraft Industry Part II
Technical Report No. 10 Thrust Recovery Tests
Technical Report No. 33 Air Cushion Effect Tests - Part 3
Technical Report No. TR-AC-47 - Joint ATIC-WADC report on Project Silver bug Project No. 9961 - 15 February 1955
Technical Report on the Use of Titanium`in Orenda Jet Engines
Technical Reports on Skinning the Rear Empennage of the Cf-105 Arrow
Technical Study of the Capabilities of the CF-105 to Intercept a Target at Mach 2 Speeds
Technical Talk
Technical Topics - May 1949
Technical report No. 54 Combustor requirements for Project PV704
Technical requirements for Arrow 2 starting unit
Technology, Production and Defence
Ted Jones
Teeth Constructed Using Grants Odontograph Tables
Telecon between Frank Brame and Tim McShane 5 Jul 1999
Telecon minutes between Frank Brame and Tim McShane
Telegram to W.A.Curtis from Bailie
Ten-Year Club
Termination Directive
Termination Notice
Termination report on the BG93 AFCS amplifier calibrator
Termination report on the DG6000 three axis repeater for the ASTRA vertical and heading reference system of the CF-105 Avro Arrow aircraft
Termination report on the DG6002 stabilization repeater for the ASTRA vertical and heading reference system of the CF-105 Avro Arrow aircraft
Termination report on the GG63 miniature stable platform for the ASTRA vertical and heading reference system of the CF105 Avro Arrow aircraft
Termination report on the HG32 air data computer for the ASTRA system of the CF-105 Arrow aircraft
Termination report on the HG6000 platform (erection) computer for the ASTRA vertical and heading reference system of the CF-105 Avro Arrow aircraft
Termination report on the JG 168 Mach indicator and the BG94 mach indicator amplifier calibrator for the ASTRA system of the CF-105 Avro Arrow
Termination report on the ground test equipment for the flight control system of the CF-105 Arrow aircraft
Termination report: the ASTRA-1 navigation computer. Report 9201/7601/R1
Test Blade for Wind Tunnel (Turbine? Blade) circa 1953
Test Data Report for the Full Scale 20° Wing Tip Segment of the Avrocar - 148 pages given
Test Department 3110, Jobs in Work
Test Flight
Test Flight at Malton
Test Flight refueling
Test Flying Jet Planes A Problem In Precision
Test Flying jet planes
Test Flying the Avro Jetliner
Test Pilots and Their Aircraft
Test-Flight Checks of Navigation Aids
Testing the Jetliner
Testing the Legends
Tests on .04 scale fin model with I.R. seeker pod at supersonic speeds
Text of Prime Minister's announcement of decision on to discontinue Arrow
Text of Statement by Crawford Gordon on Arrow
The (Almost) Flying Saucer - June 1974
The 12-day war
The Aeronautical engineers at A.V. Roe Ltd.
The Aeroplane Looking Back 40 Years
The Age of Jets
The Air Force - The Role Remains the Same but Government Indecision Makes the Future Method Uncertain
The Air Force - the role remains the same but government indecision make sthe future method uncertain
The Airborne News - May 1962
The Airborne Services - 1956 Sep
The Airborne Services - Apr 1955
The Airborne Services - Apr 1956
The Airborne Services - Apr 1959
The Airborne Services - Apr 1962
The Airborne Services - Aug 1952
The Airborne Services - Aug 1954
The Airborne Services - Aug 1955
The Airborne Services - Aug 1956
The Airborne Services - Aug 1957
The Airborne Services - Aug 1958
The Airborne Services - Aug 1960
The Airborne Services - Dec 1959
The Airborne Services - Feb 1952
The Airborne Services - Feb 1956
The Airborne Services - Feb 1958
The Airborne Services - Feb 1963
The Airborne Services - Jan 1954
The Airborne Services - Jan 1955
The Airborne Services - Jan 1957
The Airborne Services - Jan 1958
The Airborne Services - Jan 1959
The Airborne Services - Jul 1955
The Airborne Services - Jul 1956
The Airborne Services - Jul 1958
The Airborne Services - Jul 1959
The Airborne Services - Jul 1960
The Airborne Services - Jun 1954
The Airborne Services - Jun 1955
The Airborne Services - Jun 1956
The Airborne Services - Jun 1958
The Airborne Services - Jun 1960
The Airborne Services - Jun 1961
The Airborne Services - Mar 1956
The Airborne Services - Mar 1957
The Airborne Services - Mar 1958
The Airborne Services - Mar 1959
The Airborne Services - Mar 1960
The Airborne Services - Mar 1962
The Airborne Services - May 1951
The Airborne Services - May 1953
The Airborne Services - May 1956
The Airborne Services - May 1957
The Airborne Services - May 1958
The Airborne Services - May 1959
The Airborne Services - May 1960
The Airborne Services - Oct 1956
The Airborne Services - Oct 1957
The Airborne Services - Oct 1958
The Airborne Services - Oct 1961
The Airborne Services - Sep 1953
The Airborne Services - Sep 1954
The Airborne Services - Sep 1957
The Airborne Services - Sep 1958
The Airborne Services - Sep 1959
The Airborne Services - Sep 1960
The Airborne Services - Sep 1962
The Airborne services - Jun 1953
The Airbourne Services - Dec 1955
The Airbourne Services - Jun 1959
The Aircraft Growth Factor
The Aircraft industry at work
The Anson Retires
The Application of Plastics Materials to Gas Turbine Engines
The Arrow
The Arrow
The Arrow - Avro CF-105 MK1, Pilot instructions and RCAF testing/Basing plans
The Arrow - Avro CF-105 MK1, Pilot instructions and RCAF testing/Basing plans - with CD
The Arrow - Avro CF-105 MK1, Pilot's instructions and RCAF testing/Basing plans
The Arrow 2000 Project
The Arrow Affair-A Novel
The Arrow Airborne
The Arrow Controversy
The Arrow Decision
The Arrow Flutter Programme
The Arrow Revealed - Avro Aircraft's supersonic fighter may be airborne by year's end
The Arrow Revealed - Avro Aircraft's supersonic fighter may be airborne by years end
The Arrow Revisited
The Arrow Scrapbook
The Arrow Scrapbook
The Arrow Scrapbook
The Arrow Story - told by Avro Aircraft's Vice-President Engineering
The Arrow That Fell
The Arrow at Abbotsford
The Arrow myth still flies
The Arrow's final days
The Arrow: What might have been
The Assembly Begins
The Avian Gyroplane
The Avro Aerocar
The Avro Aircraft Arrow - Sheridanc - Web site
The Avro Arorw
The Avro Arrow
The Avro Arrow
The Avro Arrow
The Avro Arrow - Barry Fortier - Web Site
The Avro Arrow - Chapter 1
The Avro Arrow - Chapter 2
The Avro Arrow - Chapter 3
The Avro Arrow - Chapter 4
The Avro Arrow - Chapter 5
The Avro Arrow - Chapter 6
The Avro Arrow - Chapter 7
The Avro Arrow - Chapter 8
The Avro Arrow - The Greatest Fighter Ever
The Avro Arrow - The official rollout of the Avro Arrow discloses one of the most sensational developments in aviation history…
The Avro Arrow Story
The Avro Arrow Story
The Avro Arrow Story
The Avro Arrow Story: The perspective of Russell Isinger
The Avro Arrow and... a flying saucer? - Hugh Walker
The Avro Arrow by the Arrowheads
The Avro Arrow in Context
The Avro Arrow on Centre Stage - CBC re-creates a Dream
The Avro Arrow takes flight at Clarinton Museums
The Avro Arrow wasn’t that great
The Avro Arrow: Canada's Broken Dream
The Avro Arrow: Canada's Cold War Interceptor
The Avro Arrow: For the Record
The Avro Arrow: Supersonic Sentinel
The Avro Atlantic - An Airliner that Never Was
The Avro Avrocar
The Avro C-102 Jetliner - COVER
The Avro C102 "Jetliner"
The Avro C102 Jetliner
The Avro CF-100
The Avro CF-105 Arrow Rolls Out
The Avro Canada Archives - The Avro Canada C-102 Jetliner
The Avro Canada C-102 Jetliner
The Avro Canada CF-105 Arrow Programme: Decisions and determinants
The Avro Heritage Group
The Avro Jetliner
The Avro Jetliner
The Avro Jetliner
The Avro Jetliner - Shutting Down Another National Dream
The Avro Jetliner: Did You Know?
The Avro Lancaster bomber
The Avro Lancaster is fitted with Dowty undercarriage, tailwheel & hydraulic equipmnet
The Avro Myth Still Flies
The Avro Organization
The Avro Organization
The Avro Story
The Avro VZ-9 Experimental Aircraft Lessons Learned
The Avro VZ-9 Flying Saucer
The Avro men who wouldn’t quit
The Avrocar - Top Secret Flying Saucer (Canada/USA, 1952-1961)
The Avrocar Canada's Flying Saucer
The Avrocar Design
The Avrocar Revealed
The C-102 Progresses
The CAHS Journal - Vol 17 No 4
The CAI and the IAS attend a Joint Meeting
The CF-100 - A community project sponsored by the members of the Malton Branch 528 RCL
The CF-100 and How It Grew
The CF-100/4 Under the Skin
The CF-105 Arrow Story: Destruction of a National Dream and a Nation's Pride
The CF-105 Assessment Study Summary Report 1
The CF-105 Assessment Study Summary Report 11
The CF-105 Weapon System / Dowty and Orenda
The CF105 Avro Arrow: The Players
The CF105 Avro Arrow: Timeline
The CSC at 40 - Looking back at election '57
The Canadian Air and Space Museum is hosting the 60th Anniversary of the inaugural flight of the "The world's first regional jet" C-102 Avro Canada Jetliner
The Canadian Approach to All-Weather Interceptor Development - the 14th British Commonweath Leacture
The Canadian Approach to All-Weather Interceptor Development - the 14th British Commonweath Leacture
The Canadian Contribution to the Ground Cushion Story
The Canadian Magazine
The Career of Janusz Zurakowski
The Chapter Closes - The 692nd and Final CF-100 is Rolled Out at Malton by Avro
The Chosen Ones
The Clunk Remembered
The Comet Arrives
The Conservative Prayer
The Continental Comet
The Day of the Delta
The Day the Avro Arrow Died
The Decision to close Arrow
The Design Deadline
The Development of Avro Canada's Orenda
The Development of the Avro Canada Orenda Jet Propulsion Engine
The Development of the Introduction of the BOMARC Ground to Air guided missle and the MB-1 Air to Air Guided missle on Canadian manned Interceptors for the RCAF for the Defence of Canada
The Diefenbaker Legacy
The Dodo Revisited
The Dodo and the Canada Goose
The Dollar Decision
The Dove
The Drag of the Arrow 1 - Part 1 - Spillage Drag Part 2 - Minimum External Drag Coefficient Report 71 / AERO DATA / 12
The Early History of Canadian Planetary Exploration
The Engineering Jig Saw
The Father of the Jetliner
The Final Betrayal: Trans-Canada Airlines and the Avro Jetliner
The Flyer - Fall 2006
The Flyer - Spring 1997
The Flyer - Summer 1996
The Flyer - Vol 24 No 2
The Flyer - Winter 2004
The Flyer No 1 V13
The Flyer No 1 Vol 19
The Flyer newsletter - page 4
The Fourth National Air Show
The Front Cover / Jet Age / Engine Plant - May - 1952
The Georgetown Gyroplane
The Great Arrow Debate
The Greek Alphabet
The History of Canadair
The History of the Orenda Test Establishment at Nobel
The Holy Grail
The Home Team - Radar, Ground Observers and Fighters from the Air Defence Team
The Illustrated Review of Aviation
The Industry - Apr 1953
The Industry - Apr 1954
The Industry - Apr 1955
The Industry - Apr 1956
The Industry - Apr 1957
The Industry - Apr 1958
The Industry - Apr 1959
The Industry - Apr 1960
The Industry - Apr 1962
The Industry - Aug 1953
The Industry - Aug 1955
The Industry - Aug 1956
The Industry - Aug 1957
The Industry - Aug 1958
The Industry - Aug 1959
The Industry - Aug 1960
The Industry - Aug 1962
The Industry - Dec 1954
The Industry - Dec 1956
The Industry - Dec 1957
The Industry - Dec 1958
The Industry - Dec 1959
The Industry - Dec 1960
The Industry - Dec 1963
The Industry - Feb 1954
The Industry - Feb 1955
The Industry - Feb 1956
The Industry - Feb 1957
The Industry - Feb 1958
The Industry - Feb 1959
The Industry - Feb 1960
The Industry - Jan 1957
The Industry - Jan 1958
The Industry - Jan 1959
The Industry - Jan 1960
The Industry - Jan 1961
The Industry - Jul 1953
The Industry - Jul 1954
The Industry - Jul 1955
The Industry - Jul 1956
The Industry - Jul 1957
The Industry - Jul 1958
The Industry - Jul 1959
The Industry - Jul 1960
The Industry - Jun 1954
The Industry - Jun 1955
The Industry - Jun 1956
The Industry - Jun 1959
The Industry - Jun 1960
The Industry - Jun 1962
The Industry - Mar 1957
The Industry - Mar 1960
The Industry - Mar 1961
The Industry - Mar 1963
The Industry - May 1953
The Industry - May 1954
The Industry - May 1955
The Industry - May 1956
The Industry - May 1957
The Industry - May 1959
The Industry - May 1960
The Industry - May 1962
The Industry - Nov 1953
The Industry - Nov 1954
The Industry - Nov 1955
The Industry - Nov 1957
The Industry - Nov 1959
The Industry - Nov 1960
The Industry - Oct 1954
The Industry - Oct 1955
The Industry - Oct 1956
The Industry - Oct 1957
The Industry - Oct 1958
The Industry - Oct 1958
The Industry - Oct 1960
The Industry - Oct 1961
The Industry - Oct 1962
The Industry - October 1951
The Industry - Sep 1953
The Industry - Sep 1956
The Industry - Sep 1957
The Industry - Sep 1958
The Industry - Sep 1959
The Industry - Sep 1960
The Industry 1958/ Jan
The Industry on Parade
The Industry-Oct 1957
The Industy - Dec 1956
The Integration of Industry - Mar 1958
The Jetliner - Critical Reviews from 50 Years Ago Re-Surface
The Jetliner Comes Out - Public Debut
The Jetliner Flight Trials & Other Things
The Jetliner; Critical Reviews from 50 years ago Re-Surface
The Lancaster At War (Royal Airforce Documentary) | Timeline
The Lancaster Bomber
The Leaders.. They show the way
The Legacy of the Arrow
The Legacy of the Arrow - The Arrow… and the industry
The Legend Lives on… Zurakowski Park
The Long Polar Watch
The Lost AVRO Arrow Iroquois
The Mail - 27 Jan 1997
The Making of an all weather fighter pilot
The Malton scene 30 years ago
The Man Who Wouldn't Give Up
The Mathematical Model of the Arrow 2 Weapons System Report #10
The Matrix Force Method of Structural Analysis
The McCarter collection and the Avro Arrow
The Mighty Arrow
The Ministry of Supply (UK) - detailing people down to who the CF-105 was discussed
The Necessity of Air Power
The News - Apr 1948
The News - Apr 1951
The News - Apr 1954
The News - Aug 1951
The News - Aug 1954
The News - Dec 1947
The News - Dec 1948
The News - Dec 1949
The News - Dec 1951
The News - Feb 1950
The News - Feb 1952
The News - Feb 1953
The News - Feb 1954
The News - Jan 1946
The News - Jan 1952
The News - Jul 1948
The News - Jul 1953
The News - Jun 1950
The News - Jun 1953
The News - Mar 1947
The News - Mar 1948
The News - Mar 1949
The News - Mar 1950
The News - Mar 1951
The News - May 1947
The News - May 1951
The News - Nov 1949
The News - Nov 1951
The News - Oct 1947
The News - Oct 1949
The News - Sep 1949
The News - Sep 1950
The News of Canadian Aviation - April 1946
The News of Canadian Aviation - Aug 1948
The News of Canadian Aviation - Feb 1946
The News of Canadian Aviation - Feb 1948
The News of Canadian Aviation - Mar 1947
The News of Canadian Aviation - Nov 1948
The Next 25 Years in Canadian aviation
The Next 25 Years in Canadian aviation - A Presentation by A. V. Roe Canada Limited to the Royal Commission on Canada's Economic Prospects
The Nobel Gas Turbine Test Establishment
The Norfolk Islander - Dec 2022
The Orenda - Vol. 4, No. 22
The Orenda 2-22-57
The Orenda 3-28-58
The Orenda 9-12-58
The Orenda Iroquois
The Orenda Ring
The Orenda Story
The Orenda Story - Complex Problems Solved in Orenda Development
The Orenda Story - First Details Released on Orenda Jet Engine
The Orenda and the Future
The Origins of the Vulcan
The Other Side Of The Other Side - Paul Campagna
The Paper Pyramid
The Patriot Missive
The Pentagons Flying Saucer problem April/May 2003
The Phoenix has Risen - The CF-105 AVRO Arrow
The Pilots (at Avro)
The Pilots at Farnborough
The Plant Grows
The Powerplant Problem
The Prime Producers
The Production Problem
The Proving Process
The Prowling Mind of Henri Coanda
The RCAF A Potent Air Weapon Nears Completion
The RCAF's Airplanes….
The Red Scare; Cold War Canada
The Return of a Legend
The Role of Research
The Roll-Out of the Avro Arrow
The Root of the Matter
The Royal Canadian Air Force - Canada's Air Force Gains Confidence with its growing strength
The Saga of the Norseman
The Scrapping of the Avro Arrow
The Search for Management
The Shining Sword - Avro Arrow MK.4 - R.L.Whitcomb
The Soviet Threat to North America 1959-1971
The Sped Arrow
The Standard
The Successful Designer
The Symbol of Bold Creative Engineering at Avro Aircraft
The Threat to North America 1958-1967 - Copy 1
The Threat to North America 1958-1967 - Copy 56 includes extra cover page
The U-2 and the Avro Arrow
The U. S. Air Force's Flying Saucer
The VZ-9 "Avrocar"
The VZ-9V Avrocar
The Vancouver Air Show
The WCAM and The Arrow
The Wallis Supersonic Long-Range Formula
The World's ONLY Flying Saucer
The World's Second, North American's First
The Zurabatic Cartwheel
The aerodynamic characteristics of a tail-first delta wing configuration at M=1.57 Laboratory Report LR-116
The airborne services - Dec 1952
The airborne services - Feb 1959
The airborne services - Jan 1960
The airborne services - Jul 1952
The airborne services - Jul 1954
The airborne services - May 1955
The airborne services - Nov 1960
The beginning - and the end
The beginning -- and end: II
The birth and death of a dream
The cancellation of the Avro Arrow project
The changing emphasis in Canadian air power
The day a dream crashed to earth
The day the Iroquois flew 1
The day the Iroquois flew 2
The day the dream crashed to earth
The day they shot down the Arrow
The department of the Chief of the Air Staff (UK) - detailing down to people who the CF-105 was discussed
The economic echoes of Malton
The effect of the steering loop gains on the interception capabilities of the Arrow
The effect of trim-limit conversion manoeuvres on the terminal phase capabilities of the Arrow when operating against equal speed targets. Report No 72/TACTICS/7
The effect of trim-limit conversion manoeuvres on the terminal phase capabilities of the Arrow when operating against equal speed targets. Report No. 72/TACTICS/7
The egg hatches
The end of the Arrow
The first flight of the Avro Arrow
The first real saucer?
The flight limitations of the C-105 summary
The future of Canadian Defence in the Nuclear Era
The hunt for the Avro Arorw
The importance of being a Delta
The induced drag factor of highly swept delta wing at subsonic speeds
The industry - Jan 1955
The industry - Mar 1962
The industry - Nov 1958
The industry - Sept 1955
The last Vulcan
The legacy of the Avro Arrow
The life and Times of Bill Baker
The little boy and the Arrow
The mathematical model of the Arrow 2 weapon system
The new, the old
The news - Jun 1948
The news - May 1950
The news - May 1952
The news - Nov 1948
The news - Oct 1953
The news of Canadian Aviation - Apr 1948
The night before Christmas
The road to serfdom
The rousing lessons of the Avro Arrow
The spirit soars
The supersonic turbojet previously designated the PS-13 - for Project Study 13 - now reaching maturity, is cristened IROQUOIS
The supersonic turbojet previously designationed the PS-13 - for Project Study 13 - now reaching maturity, is christened IROQUOIS
The very end - Jan 1964
The way it all began
The way we were 1953
The weapon that almost was
The well tempered aircraft
The world's newest supersonic jet engine...Iroquois
The world's newest supersonic jet engine… the IROQUOIS
Thee Development of Air Power
Thematic Guide of the National Library and Archives records related to Avro Arrow
Thematic Guides - Avro Arrow
Theory of multi-SPAR and multi-RIB wing structures
There was no conspiracy behind the canellation of the Arrow
They Fight to Fly… and Fly to Fight
Thin Wings of CF-105 influence Hydraulics
This 'Chinook' was their first jet
This and That on Air Defence - A CF-100 replacemetn and a counter-missile effort
This fyling saucer's legit
This is Bristol in Canada
This is the Orenda
Thousands of Avro Employees on Tarmac at Arrow Rollout
Thousands of Westerners
Three arrows on Tarmac
Three ex-servicemen help to put a man on the moon
Three images
Through the years
Through the years with Canadian Aviation - Dec 1963
Thunder Before The Storm - CF-105 Arrow MK.1
Tiger in a bubble, Pilot in Plexiglas
To NATO from Canada
Too Expensive, too late - The myth of the broken Arrow
Too Good To Be True - the Arrow, the Jetliner & James C. Floyd
Too Good to be True
Tool Design Standards Manual, A.V. Roe Canada Limited Gas Turbine Division Vol 1
Tool Design Standards Manual, A.V. Roe Canada Limited Gas Turbine Division Vol 2
Tool Design Standards Manual, A.V. Roe Canada Limited Gas Turbine Division Vol 3
Tool Designers of Arrow job to form Co-op
Tooling Development from design engineering grass cloth drawings, Drawing 4300-PE-2 P.E.S.-2
Tooling and Manufacturing Policy CF-105
Tooling and Manufacturing Policy For Building CF-105 Component Test Sections and First and Subsequent Airplanes
Tooling and manufacturing policy for building CF-105 component test sections and first and subsequent airplanes
Top 5 Strangest Military Aircrafts [HD]
Top Aircraft Producer Destiny of Canadair
Toronto Aerospace Museum Newsletter Vol 1 Issue 1
Tovey Family Photo
Toyota design Engineer sitting in cockpit of Avro CF-100 5D in Canadian Warplane Heritage Museum
Training Course for Compressor Sets for Alberta Gas Trunk Line Company
Trans Canada Airlines Misc
Transonic wind tunnel tests of a .03 scale model of the A.V. Roe C-105 aircraft. Series II. Volume 2
Transonic wind tunnel tests of a modified .03 scale model of the A.V. Roe C-105 aircraft. Series III
Transport Aircraft
Transport Jets
Travel Through Time
Travel expenses
Trim Actuator - reported to be from an arrow
Triple U.S. Air Power Committee Recommends - Mar 1948
Troubled future for RCAF
Try to Sell Arrows in US, Chevrier Asks
Tumult Born of Dead Arrow
Turbo Research Plant Sale under discussion
Two Commentaries on the Government's provision of air defences in Canada post Arrow
Two Firsts
Two U.S. bids for the turbojet era
Two orders from US valued at $8.2M confirmed in house
Typing of Reports
U.S. Army Requirement for a New Family of Air Vehicles
U.S. Patent 2,910,866 Nov 3, 1959
U.S. feared spying ability of Avro Arrow
U.S. pressure on the Arrow for the U-2
UAP cools the brain that guides the Arrow
UK Air Chief says Fighters still needed
UK Commander in Chief letter to Floyd
UK headof Avro see PM
US Tiger considered for RCAF
US a factor in scrapping jet?
US hires engineeers as Avro plant idled
USAF AIR RESEARCH & DEVELOPMEMT COMMAND TECHNICAL REQUIREMENT TR no 54 - Commentary on Technical Research Objectives for Future Aircraft Development
USAF Evaluation of the CF-105 Aircraft and PS-13 Engine
USAF Memo subject Combined Procurement with Canda of F-101B and CL-44
USAF letter - 31 October 1989
USAF letter to Canada's Defence Minister
USAF letter to Mr. Campney
UTILITY HYDRAULICS SYSTEM SURGE PRESSURES ARROW 1 & 2
Ultimate Jet Fighter
Unaddressed envelope 'First Official Airmail' carried on First Flight of Jetliner Toronto to New York 18 April 1950
Unconventional Aircraft Second Edition
Underwater Quest for Lost Treasure of the Arrow
Underwater footage of long-lost Avro Arrow
Unexpected Return Significant
Union to give PM proposals on Avro
Unions say 47,000 jobs involved
Unpublished Mk2 Arrow; Illustrations
Untitled notes summarizing contents of several published books about Avro.
Up, Down, Straight and Level
Urge NATO to standardize
V.T.O. - The Impulsive Excitation of Nutational Oscillations
VTOL 1962
VTOL Design Proposal (RAMJET)
VZ-9A Avrocar
VZ-9AV Avrocar
Vacation pay notice provided to impacted staff
Vacuum Impregnation cuts rejections of Mg Castings
Various Canadian articles from the 40's - 50's
Various Canadian aviation Articles from the 50's
Various graphed drawings
Various graphs and drawings by R.J. Templin and O.E. Michaelsen
Various methods of defueling the C105 and the requirement for pressurized air - Report No. LOG/105/49
Vast Industrial Effort Sparked by Avro Plans
Velvet Glove Missile
Velvet Glove guidance assembly
Vent Fury at Cancelling of Arrow
Vera Fenton
Viable Vulcans
Victory Aircraft Limited Reference Letter for Jean Sellors
Visit to Edwards AFB
Visit to Honeywell re Damping System
Visit to RCA re Fire Control System
Visits to USAF BASES FLYING genie
Voice of the Reader - Oct 1949
Voice of the Reader - Sep 1951
Voyage of Discovery
Vulcan engine Ad
Vulcan image
W.A. Waechter Avro pay stub
Wake Surveys at the Tail Position of the Avro CF-100 Half Model at Mach 0.6 to Mach 0.9
Walkaround - May-Jun 2004
Want List
Want RCAF to play role
War Ace will head Air Transport Board
Warren Twins
WayPoints - Sep/Oct 2004
Wayfarers_ Canadian Achievers
We Found the Avro ARROW!! Plane Savers E81 part 2
We Should and will go on Building Arrows
We need a Canadian Air Policy Now!
We who were there
We're proud of our associations…
Weapons Systems for war
Weekly Engineering Salary Structure
Weekly Ironing - Jan's wife had pressing job, too
Weekly Salary Rates and Ranges
Weight Estimation Data
Weight and Balance C.G. Report for Arrow 2 Aircraft per Issue 22
Weight and Balance C.G. for Arrow 2 Production Aircraft per Issue 21
Weight and Balance Summary For Arrow 1 A/C 25201 Per Issue 16
Weight and Balance Summary for Arrow 1 Aircraft #25202 and 25203 per Issue 2
Weight and C.G. Summary for Arrow 2 Production Aircraft per Issue 19
Weight and C.G.Summary of the C-105 MK 1 with J75 P3 engines - issue 10
Weight and C.G.Summary of the C-105 MK 1 with J75 P3 engines First Aircraft - Issue 9
Weight and C.G.Summary of the C-105 MK 2 Production Aircraft - Issue 11
Weight and CofG Summary of the C-105 Mk1 First Aircraft w/J75 P3 Engines; Report #7-0400-44, Issue 6
Welcome Back Avro Arrow - Mayor Hazel McCallion and Others
West Parry Sound Exhibit at the Calgary Aerospace Museum (The Hangar Flight museum)
Western Skylines - Jul 1953
Western Skylines - Test Pilots
What Missiles Can Do and What They Can't
What Mr. Pearkes Had To Say
What investment opportunity?
What is the Shape of Wings to Come? - Mar 1947
What junking the Arrow could mean to the future of Canada
What led Canada to junk the Arrow
What's in the Air - Feb 1948
What's in the Air - Operating Problems with Jet Airliners
What's in the air - Apr 1949
What's in the air - Jan 1948
What's in the air - May 1948
What's in the air - Oct 1949
What's in the air - Sep 1950
Whats wrong with our airliners?
Wheel Dresser of Turbine Blade-Rotor - Tool F-461194 Sheet 4 of 5
Wheels Lock in Air, Jetliner Crash-lands Safely
When Tes house get de jet
When de whistle blow at A.V. Roe.
Where Canada missed the boat / Hellyer claims economy rules defense policy
Where Orendas Fly… Service Goes Too
Where canada missed the boat
Where do we go from here?
Where do we go from the Arrow?
Wherever there's an airstrip there can be an AVRO 748 - Mar 1960
Who Killed the Avro Arrow
Who flew first in the Commonwealth?
Why Arrows became scrap
Wikipedia - Orenda Engines
Wilkinson, Harold F. "Wilkie"
Will the Avro Arrow fly again?
William Frank Calver A.V. Roe Canada Application for Employement
Wind Tunnel Measurements of the Damping of Yaw on Avro Canada Swept Wing with and without Tip Tanks
Wind Tunnel Tests on a Model of the Avro CF-100 Fitted with Wing Tip Tanks
Wind tunnel investigation of possible rudder flutter on a 1:25 scale fin model of CF-105 at Mach number of 1.22
Wind tunnel tests of a 0.04 scale model of Avro C-105 vertical tail at supersonic speeds
Window dressing
Wing Flow Tests to Determine the Effects of the Installation of 4 N-44 Missiles Under the Nacelle-Fuselage Fillet
Wing tank ramjet scheme. 35 dia. (Curtiss-Wright proposal)
Winging out of the past
Wings - Canada'a Aviation Magazine
Wings - Vol 9 No 1
Wings - Vol 9 No 2
Wings Gallery
Wings Of Britain - Jul 1948
Winnett Boyd fonds - Trent University Archives
Wintermeyer Asks Committee Preserve Avro
With a built in versatility
Without a wing or a prayer
Woe Canada
Woman Buys" Secrert Avro Arrow Files
Wondrous Tory Story
Working the wonder metal - Orenda blazes a trail in titanium. Find many difficulties exaggerated.
World Class Avro
World Militaty Aircraft Since 1945 - extract
Worlds first Delta Bomber
Wound of the Arrow
Wrench with matching cardboard package - Part ST.295 - date pkd July 29/54
Written transcript of speech given by Jim Floyd at 40th Anniversary of 1st Flight of Arrow
XC104A - SK20045 proposal
XC104A with tip tanks - SK20046 proposal
XC104B - SK20038 proposal
XM607 Falklands' Most Daring Raid
YOU'LL NEVER WALK ALONE PIANO SOLO
You get what you pay for - The Light-Weight Fighter Fantasy
Your Basement Fallout Shelter - Emergency Measures Canada
Zura Turning Cartwheels in the sky part 3
Zura Turning cartwheels in the sky - part 1
Zura Turning cartwheels in the sky - part 2
Zura acknoledged in Parliament
Zura being lifted on shoulders in front of 201
Zura news - Ace's survival of crash may save many others / Ace's survival of crash may save many lives though crewman died / What A Minute! Amazine Air Feats / Avro Jet Fighter goes backward at air display
Zura talks about the Arrow
Zurakowski, Janusz "Jan"
a report on the state of The Canadian Aircraft Industry
aircraft wrench marked ST.1391
arrow in the sky avro aircraft wind tunnel testing
arrow_in_the_sky_avro_aircraft_machinery
arrow_in_the_sky_avro_aircraft_rocket_tests
arrow_in_the_sky_avro_aircraft_test_rigs
aviation intelligence - Mar 1960
aviation news digest - Jul 1963
aviation news digest - Jun 1963
aviation news digest - Nov 1956
aviation news digest Aug 1963
bang on view
barbs and bouquets
bottom corner not readable - Looks to be wing assembly sequence
cabinet meeting - multiple dates
canadas sixth generation fighter jet
catalogue of records at NRC applied for downgrading
correspondence DND Canadian Joint Staff (CJS) to Defence Research Board (DRB)
correspondence Director of Engineering Research, Defence Research Board (DRB) to J.R.Douglas, Contracts, Avro
correspondence USAF Aeronautics Division to Canadian Joint Staff (CJS)
correspondence to 'Les' from Ken Carline
double exposure image of CF-100 18101 with story
exploring the Frontiers of Tomorrow
extract from The Flyer Vol 21 No 1
extract from The Flyer Vol 21 No 2
extract from ministers' meeting in Quebec July 1960, Pearkes felt betrayed by the Americans
fall of an arrow
first 50 yrs of powered flight in canada
first place in the sun
flights of fact and fantasy
for back-seat driving at 600 m.p.h.
grand adventure
happier passengers… relaxed crews
higher serviceability… low maintenance
image of 201 in flight
image of Arrow 201 with drag chute deployed
images of Crude Arrow model for kids to ride on
item 18000 meeting Feb 10 1959
letter from H.D. Graham, Chief of the General Staff to Chairman Chiefs of Staff
letter to Brooke Claxton Minister of National Defence - RE: Estimates for 1953-45
letters to editor
lower investment… higher income
memo to Aerodynamics Section from T.D. Earl, Chief Aerodynamicist on "Organization"
memo to Special Projects Group Personnel - RE: Requests for Illustrative Work
more heat = more power
more passengers… fewer aircraft
mounted 23.5x43 - Jetliner
names in the news - Sep 1954
news digest - Aug 1958
news digest - Aug 1961
news digest - Dec 1959
news digest - Jan 1958
news digest - May 1959
news digest - Nov - 1959
news digest - Oct 1957
news digest - Oct 1958
news digest - Oct 1960
news digest - jul 1957
news digest - may 1958
no end to the beginning
on guard in Canada… In Europe… and for the future… The Avro Arrow
people - Jun 1960
poster of 100 yr of powered flight, coast to coast
rudder tooling breakdown, Drawing 7-0184-PE-11
series rekindles arrow debate
technical description of Arrow wing and performance
the avro vulcan 2006 technology documentary hosted by john standing
the simplicity of jetpower
there never was an arrow video Part 1
there never was an arrow video Part 2
there never was an arrow video Part 3
there never was an arrow video Part 4
there never was an arrow video Part 5
there never was an arrow video Part 6
three views of Jetliner model
tribute to teamwork
untitled drawing showing multiple Arrow jigs
way ahead' in Achivement
when the AVRO Jetliner flies over your home
wide Angle shot of CF-100 #18101 firing rockets ; photo mounted on stiff cardboard. Writing on reverse 18101 Feb 7, 1953 or later P. Cope
“Flies Like a Bird,”- Test Pilot Praises New Jetliner
“Made In Canada”