Fuel Oil Filter Mounting Bracket

August 2021, PastPerfect Conversion

August 2021, PastPerfect Conversion

Name/Title

Fuel Oil Filter Mounting Bracket

Entry/Object ID

2021.1.922

Scope and Content

Scanned on 5.10.21 with Canon

Collection

Scripps Technical Legacy Data Collection

Category

Technical drawings

Acquisition

Accession

2021.1

Source or Donor

Peter and Robert Henkel

Acquisition Method

Donation

Archive Details

Date(s) of Creation

1939

Archive Notes

Level of Description: Item

Location

Building

Third Floor Annex