Name/Title
Oil Suction Tube FlangeEntry/Object ID
2021.1.970Scope and Content
Scanned on 5.10.21 with CanonCollection
Scripps Technical Legacy Data CollectionAcquisition
Accession
2021.1Source or Donor
Peter and Robert HenkelAcquisition Method
DonationArchive Details
Date(s) of Creation
1939Archive Notes
Level of Description: ItemLocation
Building
Third Floor Annex