Description
Detailed review with associated drawings of the Control Boxes and Linkage to Control Surfaces and Maintenance Issues. Details of Control Box Bearings, Lubrication. B-1 Test Rig. Time required for Removal and Installation of Control Surfaces and Control Boxes. Report 71/MAINT/15/3.
Names include J.P. Booth, George P. Emmerson, Guest Hake.