Description
The major portion of the available testing time during the first C-105 test programme was devoted to modification of the strut supports and strut-model attachment details. Also the elevator hinge was modified as the elevator slipped considerably during the first test runs.
In view of the time consumed by the above activities it was not possible to complete very many test runs. It was possible to complete one run plus the five correction runs required.
The present note is intended simply as a record of the test results that were obtained in the above force tests as well as in some flow visualization tests. The results of all the correction runs have been included.