Sparrow II Loading and Transporter Dolly. Report LOG/105/45
Entry/Object ID
4025
Category
Report - Technical
Archive Items Details
Description
The CF-100 Mark 6 aircraft specification calls for the design of ground equipment to convoy the missile from the "ready use" store to the aircrafe and raising it from the dolly and loading into the laucher rail. It was considered that the equipment should be designed to support both the CF-100 and CF-105. Description of 2 Proposed Transporter Dollies for Sparrow II Missles Included drawings are quite faded. September 1956 - LOG/105/45