Name/Title
Hoover Dam constructionEntry/Object ID
0002:1267Description
Hoover Dam construction: "Upper portals of Diversion Tunnels Nos. 3 and 4 and temporary dike after the diversion of the Colorado River was completed." 11-14-32; W. A. Bechtel Collection Photo #1737 - Volume Two; Roll 27 - Photo No. 7 Copy Negative - Bureau of ReclamationCollection
Hoover Dam Construction, Bureau of Reclamation, Colorado River Collection, W. A. Bechtel CollectionMade/Created
Artist Information
Artist
Bechtel, William A.Role
PhotographerDate made
Nov 14, 1932 - Nov 14, 1932Notes
Original or Negative: Original
[W. A. Bechtel Collection Photo #1737 - Volume Two] [Roll 27 - Photo No. 7 Copy Negative - Bureau of Reclamation]Lexicon
Nomenclature 4.0
Nomenclature Secondary Object Term
Print, PhotographicNomenclature Primary Object Term
PhotographNomenclature Sub-Class
Graphic DocumentsNomenclature Class
Documentary ObjectsNomenclature Category
Category 08: Communication ObjectsSearch Terms
Hoover Dam, Construction, Diversion Tunnels, Diverting RiverOther Names and Numbers
Other Number
Negative No.: Roll 27-Photo No.7Dimensions
Dimension Notes
Printsize: (8 x 10)Location
Location
* Untyped Location
Research Room, Photo Drawer 3Date
December 17, 2025Inventory
Inventoried By
Brandy CarlinInventoried Date
Sep 23, 2026Notes
Digitized Photo BCHDDARPPC00021267Provenance
Notes
BCL William A. Bechtel Album 2, photo No.1737General Notes
Note Type
Cataloging NoteNote
(AZ. Inner) (AZ. Outer)Create Date
November 30, 2020Update Date
September 23, 2026