Name/Title
Hoover Dam construction: diversion tunnels May 20, 1932Entry/Object ID
0002:1227Description
Hoover Dam construction: diversion tunnels: "The first jumbo for pouring concrete lining in the top, or arch, section of the tunnel was erected on the "beach" in front of Tunnel No. 2 and transported across the river in sections by cableway." 5-20-32; W. A. Bechtel Collection Photo #1202 - Volume Two; Roll 20 - Photo No. 5 Copy Negative - Bureau of ReclamationCollection
Hoover Dam Construction, Bureau of Reclamation, W. A. Bechtel Collection, Six Companies Inc.Made/Created
Artist Information
Artist
Bechtel, William A.Role
PhotographerDate made
May 20, 1932 - May 20, 1932Notes
Original or Negative: Original
[W. A. Bechtel Collection Photo #1202 - Volume Two] [Roll 20 - Photo No. 5 Copy Negative - Bureau of Reclamation]Lexicon
Nomenclature 4.0
Nomenclature Secondary Object Term
Print, PhotographicNomenclature Primary Object Term
PhotographNomenclature Sub-Class
Graphic DocumentsNomenclature Class
Documentary ObjectsNomenclature Category
Category 08: Communication ObjectsSearch Terms
Hoover Dam, Construction, Diversion TunnelsOther Names and Numbers
Other Number
Negative No.: Roll 20-Photo No.5Dimensions
Dimension Notes
Printsize: (8 x 10)Location
Location
* Untyped Location
Research Room, Photo Drawer 3Date
August 23, 2026Inventory
Inventoried By
Brandy CarlinInventoried Date
Sep 21, 2026Notes
Digitized Photo BCHDDARPPC00021227Provenance
Notes
BCL William A. Bechtel Album 2, photo No.1202General Notes
Note
Negative Location: N/A
Notes: copy neg.
June 2015 PastPerfect ConversionCreate Date
November 30, 2020Update Date
September 21, 2026