Image of three construction workers working on the raising of the Cascade Locks canal around the year 1978-79 when the new powerhouse at Bonneville dam was installed. The worker in the image are working on a hallow wooden structure roughly 6ft tall based on the individuals standing inside the box. In the bottom of the image the original staircase is visible.
Back of image reads; Raising of water when 2 power house was built. Canal work. C. locks.
Inscription/Signature/Marks
Type
Inscription
Location
Back of image
Transcription
Raising of water when 2 power house was built. Canal work. C. locks.
Language
English
Material/Technique
Ink
Lexicon
Nomenclature 4.0
Nomenclature Secondary Object Term
Photograph, Color
Nomenclature Primary Object Term
Photograph
Nomenclature Sub-Class
Graphic Documents
Nomenclature Class
Documentary Objects
Nomenclature Category
Category 08: Communication Objects
Dimensions
Height
5 in
Length
7 in
Colors
Color
Gray, Yellow, White, Green, Brown
Color Notes
The gray stone walkway is surrounded by brown mud, and flooded green grass. Wood structure is yellow and white.