Name/Title
2001 Shower-Locker Room Expansion Phase 3 - Part 2Entry/Object ID
Architectural Plans 2001Scope and Content
6 page pdf includes approved permit drawings, multiple dates, application no. 2001/09/10/7888; architectural drawings by Lee Hammack, structural drawings by Peter Van Maren.
Scope included repair of deteriorated wall between DSBC and SERC and remodel area floor framing.
Constructed by Dolphin member and contractor Terry Keenan.Archive Details
Creator
Lee Hammack ArchitectDate(s) of Creation
September 10, 2001Location
Building
Lee Hammack's files