Name/Title
1999 Shower Tiles Locker Room Expansion Phase 2 Womens' Shower TilesEntry/Object ID
Architectural Plans 1999Scope and Content
One page pdf of diagram prepared by Lee Hammack, exact date unknown.
As part of fundraising for locker room expansion, Club members were given an opportunity to create personalized wall tiles, for a donation of $500 per tile, to help cover the costs of Phase 2 of the renovation projects. The diagram was prepared to assist tile setters with placement of the personalized wall tiles. Total of 112 tiles.
Member Lorna Newlin, a pottery maker, organized an event at the club in December 1999 at which donors could decorate their own tiles.
Attached: Photos of installed tiles (2020) and list of tile donors.Archive Details
Creator
Lee Hammack ArchitectDate(s) of Creation
circa 1999Location
Building
Lee Hammack's files