Name/Title
Print, PhotographicEntry/Object ID
2024.0.523Description
Nos. 2-8, 2-9, 2-10, 2-11. Pelton Wheel originally installed in the DWP's Division Creek Power Plant No. 1. It is not connected to the original generator. Division Creek supplied power to the electric-powered dredge that the DWP used to dig the aqueduct. Later, Division Creek power was delivered to the area which began the generation of power in Owens Valley.