Name/Title
Washington Cemetery Restoration Roof Clean, LLC Bid PacketEntry/Object ID
GCA3_0622Scope and Content
The document contains the bid packet from Restoration Roof Clean, LLC, outlining the proposal to clean marble, granite, and concrete elements, cradle, and coping at Washington Cemetery. Blake Meaux, the owner of Restoration Roof Clean, prepared this packet. It includes an introduction to the bid, detailed specifications for the cleaning work, pricing for stone restoration, and a contractor agreement.
The bid highlights that twenty-seven plots have already been cleaned at Washington Cemetery, with twenty-one of these located in Section C. It further discusses the cleaning of the remaining one hundred and seven plots, along with eighty-seven copings, three hundred and one granite stones, one hundred and seventy-nine marble stones, and one hundred and twenty-seven cradles that still require attention in Section C. The total cost to complete the cleaning in Section C is quoted at $16,780. Additionally, a contractor agreement accompanies the bid.Context
This artifact serves as an essential overview of the restoration efforts undertaken for various plots, monuments, and the cemetery as a whole. It aims to enhance understanding of the significance and impact of these initiatives.Collection
Collection 03: Restoration ProjectsLexicon
Getty AAT
Concept
restoration projects, copings, restoration (process), sepulchral monumentsLOC Thesaurus for Graphic Materials
Documents, Photocopies, Sepulchral monuments, Restoration, Conversation & restoration, Plot plansSearch Terms
washington cemetery, restoration, repair, llc bid packet, restoration roof cleanArchive Details
Creator
Washington CemeteryDate(s) of Creation
Feb 6, 2011Date(s) Material Assembled
Feb 6, 2011Archive Size/Extent
12 pagesDimensions
Dimension Description
DocumentsHeight
11 inWidth
8-1/2 inLocation
Location
* Untyped Location
Collection 3, Box 5 [Archive Room]Category
PermanentCondition
Reason for Exam
InventoryOverall Condition
Very GoodCondition Type
Wear, Creasing, Missing Areas / HolesDate Examined
Nov 18, 2025Surface
The item is free from rips, stans, and tears. The item exhibits general wear from use, creasing, and holes.Create Date
April 15, 2026Update Date
October 14, 2026