Letter dated 9/3/54 from Fred S. Langdon Architect to Housing & Home Finance Agency Attn: Dexter B. Hill Field Engineer Re: Pleasant Valley School Project Conn. 52-C-3B Groton Change Order #9
Letter dated 9/3/54 from Fred S. Langdon Architect to Housing & Home Finance Agency Attn: Dexter B. Hill Field Engineer Re: Pleasant Valley School Project Conn. 52-C-3B Groton Change Order #9
Entry/Object ID
2016.1.1295
Scope and Content
A copy of a letter on onion-skin ppaper, typed. It begins with a black stamp that reads, "Fred S. Langdon Architect 325 State Street New London, Conn. September 3, 1954 Housing & Home Finance Agency 1301 Post Office Building Boaston, Mass. Att: Dexter B. Hill Field Engineer Re: Pleasant Valley School Project Conn. 52-C-3B Groton Connecticut Dear Mr. HIll: I am enclosing herwith an original and five (5) copies of change order #9, in connection with the above referenced project which have been executed by M. George L. Bilderbeck, Chairman of the Groton School Building Committee and the writer Architect and accepted by the Elci Company contractors for this project..." 'COPY' is stamped in red in the middle of this letter.
Collection
James L. Streeter Collection
Acquisition
Accession
2016.1
Source or Donor
Streeter, James L.
Acquisition Method
Gift
Lexicon
Nomenclature 4.0
Nomenclature Secondary Object Term
Letter
Nomenclature Primary Object Term
Correspondence
Nomenclature Sub-Class
Other Documents
Nomenclature Class
Documentary Objects
Nomenclature Category
Category 08: Communication Objects
LOC Thesaurus for Graphic Materials
Architects, Committees, Construction
Search Terms
Banking & Financial Structures, Correspondence/Letter, Schools, Elci Company, Fred S. Langdon Architect, Housing and Home Finance Agency, Pleasant Valley School, Project Conn 52-C-3B Elementary School, Town of Groton School Building Committee, School Building Committees, School buildings
Archive Details
Date(s) of Creation
Sep 3, 1954
Restrictions
Access: Discoloration/fading, paper clip rust mark at the top left corner of the page on both sides, creases/wrinkles and wear.
General Notes
Note
Status: Good
Status By: Maureen A. McClellan
Status Date: 2019-09-03