Manual: Erie Lackawanna Railway Co.. General Track Work Standards. March 1, 1966 [with revisions into 1972.]

front cover

front cover

Name/Title

Manual: Erie Lackawanna Railway Co.. General Track Work Standards. March 1, 1966 [with revisions into 1972.]

Entry/Object ID

2014.013.0128

Scope and Content

Manual: Erie Lackawanna Railway Company. General Track Work Standards. March 1, 1966 [with revisions into 1972.] Printed pressboard covers; three prong binding with 100 pages including foldouts. Although titled as RAILWAY, in 1966 it was still RAILROAD (name was changed in April 1968). The old name and new name are found on various pages. Revision dates up to 1972 were found. Thus the actual issue date with the revised cover and contents would have been after 1968, See notes for text of the two indexes.

Acquisition

Accession

2014.013

Source or Donor

Lukacs, Claire

Acquisition Method

Gift

Credit Line

Museum Collections. Gift of a friend of the Museum.

Archive Details

Date(s) of Creation

1966 - 1972

Archive Notes

Date(s) Created: 1966-1972 Date(s): 1966-1972

General Notes

Note

Notes: Archives 2014.013.0128 ==== Index Page No. Subject [# of pages numbered in section] A General Track Work Standards [13] B Ball and O. T. M. [4] C Laying of Continuous Welded Rail Special Gang Operations [2] D Maintenance of Continuous Welded Rail [4] E Matisa, McWilliams & Jackson Tamping Machines & Equipment of Like Nature When Working Under Traffic [1] F Protection of Gangs Working on Tracks [2] G Pre-arranged Detours [2] H Instructions Governing the Testing of Rail by Sperry Detector Car. [2] J Machinery & Equipment [2] L Instructions Relating to Program Gang Organisation [4] M General Instructions [6] N Standard Plans [3] Insulated Joint - Locations - Appendix "A" Standard Roadway Sections Minimum Roadway Clearances Special Gang Operations See Index and individual Gang Organisations after Last Standard Plan. ==== [Index following Last Standard Plan in section N] Special Gang Operations Page FORCE No SET-UP 1 "CWR" - Tie Plate Renewals RWA 2 "CWR" - No Tie Plate Renewals RWB 3 Rail Jointed - Tie Plate Renewals RJA 4 Rail Jointed - No Tie Plate Renewals RJB 5 Rail Expansion Correction REC 6 Tie Renewals - 3" Raise under Detour TRA 7 Tie Renewals - Under Traffic-Branch and Main TRB 8 Crossing & Timber Renewal, Switch Raising - Under Detour CTR 9 Tie Renewals - 3” Raise Under Traffic TRD 10 Surfacing 3" Raise Under Traffic SA 11 Surfacing 3" Raise Under Traffic, Tandem Tamper SAJ 12 Surfacing 3" Raise Under Traffic SB 13 Special Projects SP l4 Switch Raising - Jackson Switch Tamper SR 15 Spot Surfacing and Lining Under Traffic SS 16 Crossing Renewals CR 17 Preparing Crossings "Sections" CRB 18 Bolt Maintenance, Boltmaster Machine BM 19 Ballast Reclaiming - Athey Loader BR 20 Straightening Rail Joints. RMC Machine JS 21 Turnout Renewals & Temporary Crossovers TR 22 Tie Plate Renewals PR 23 Tie Loading - Speed Swing Loaders TL 24 Work Train Ballast Unloading WTB 25 Work Train - Hand Tie Unloading WWT 26 Work Train - Bundle Tie Unloading WTTB 27 Work Traln-Bundle Tie Unloading & Distribution WPTBD 28 Work Train-Unloading for Sub-Grade WTSG 29 Unloading Welded Rail WTRA 30 Unloading Jointed Rail and O.T.M. WTRB 31 Loading Rail and O.T.M. WRC 32 Stabilization of Track (Grouting) GR 33 Yard Track Abandonments YTA 34 Yard Track Cleaning YTC 35 Rock Gang RG 36 Brush Cutting BC April 7, 1969 ==== ==== Status: OK Status By: dw Status Date: 2014-11-12