Manual: Erie Lackawanna Railway Co.. General Track Work Standards. March 1, 1966 [with revisions into 1972.]
Entry/Object ID
2014.013.0128
Scope and Content
Manual: Erie Lackawanna Railway Company. General Track Work Standards. March 1, 1966 [with revisions into 1972.]
Printed pressboard covers; three prong binding with 100 pages including foldouts.
Although titled as RAILWAY, in 1966 it was still RAILROAD (name was changed in April 1968). The old name and new name are found on various pages. Revision dates up to 1972 were found. Thus the actual issue date with the revised cover and contents would have been after 1968,
See notes for text of the two indexes.
Acquisition
Accession
2014.013
Source or Donor
Lukacs, Claire
Acquisition Method
Gift
Credit Line
Museum Collections. Gift of a friend of the Museum.
Archive Details
Date(s) of Creation
1966 - 1972
Archive Notes
Date(s) Created: 1966-1972
Date(s): 1966-1972
General Notes
Note
Notes: Archives 2014.013.0128
====
Index
Page No. Subject [# of pages numbered in section]
A General Track Work Standards [13]
B Ball and O. T. M. [4]
C Laying of Continuous Welded Rail Special Gang Operations [2]
D Maintenance of Continuous Welded Rail [4]
E Matisa, McWilliams & Jackson Tamping Machines & Equipment of Like Nature When Working Under Traffic [1]
F Protection of Gangs Working on Tracks [2]
G Pre-arranged Detours [2]
H Instructions Governing the Testing of Rail by Sperry Detector Car. [2]
J Machinery & Equipment [2]
L Instructions Relating to Program Gang Organisation [4]
M General Instructions [6]
N Standard Plans [3]
Insulated Joint - Locations - Appendix "A"
Standard Roadway Sections
Minimum Roadway Clearances
Special Gang Operations
See Index and individual Gang Organisations after Last Standard Plan.
====
[Index following Last Standard Plan in section N]
Special Gang Operations
Page FORCE
No SET-UP
1 "CWR" - Tie Plate Renewals RWA
2 "CWR" - No Tie Plate Renewals RWB
3 Rail Jointed - Tie Plate Renewals RJA
4 Rail Jointed - No Tie Plate Renewals RJB
5 Rail Expansion Correction REC
6 Tie Renewals - 3" Raise under Detour TRA
7 Tie Renewals - Under Traffic-Branch and Main TRB
8 Crossing & Timber Renewal, Switch Raising - Under Detour CTR
9 Tie Renewals - 3” Raise Under Traffic TRD
10 Surfacing 3" Raise Under Traffic SA
11 Surfacing 3" Raise Under Traffic, Tandem Tamper SAJ
12 Surfacing 3" Raise Under Traffic SB
13 Special Projects SP
l4 Switch Raising - Jackson Switch Tamper SR
15 Spot Surfacing and Lining Under Traffic SS
16 Crossing Renewals CR
17 Preparing Crossings "Sections" CRB
18 Bolt Maintenance, Boltmaster Machine BM
19 Ballast Reclaiming - Athey Loader BR
20 Straightening Rail Joints. RMC Machine JS
21 Turnout Renewals & Temporary Crossovers TR
22 Tie Plate Renewals PR
23 Tie Loading - Speed Swing Loaders TL
24 Work Train Ballast Unloading WTB
25 Work Train - Hand Tie Unloading WWT
26 Work Train - Bundle Tie Unloading WTTB
27 Work Traln-Bundle Tie Unloading & Distribution WPTBD
28 Work Train-Unloading for Sub-Grade WTSG
29 Unloading Welded Rail WTRA
30 Unloading Jointed Rail and O.T.M. WTRB
31 Loading Rail and O.T.M. WRC
32 Stabilization of Track (Grouting) GR
33 Yard Track Abandonments YTA
34 Yard Track Cleaning YTC
35 Rock Gang RG
36 Brush Cutting BC
April 7, 1969
====
====
Status: OK
Status By: dw
Status Date: 2014-11-12