Program: Galapalooza 25. A Party for the Hoboken Historical Museum's 25th Anniversary. Nov. 4th, 2011 at W Hotel.

front cover

front cover

Name/Title

Program: Galapalooza 25. A Party for the Hoboken Historical Museum's 25th Anniversary. Nov. 4th, 2011 at W Hotel.

Entry/Object ID

2011.059.0001

Scope and Content

Galapalooza 25. A Party for the Hoboken Historical Museum's 25th Anniversary. November 4th, 2011 - W Hotel. Program. Perfect bound book, 5-3/8" wide x 8-1/2" high, 62 pp. plus covers. 4 copies. PDF on file. Event held in Great Room of hotel at Third Street and Frank Sinatra Drive to celebrate the twenty-fifth anniversary of the Museum as well as a fundraising event. Portion of ticket price and the proceeds of a live auction during the event were to benefit the Museum. Gala Event co-chaired by Carol Losos (President) and Eugene Flinn. Presentation made to the Barry family by Losos and Museum Director Bob Foster. Includes names of previous officers, current and past trustees, event committee and museum staff members. Greetings from Governor Chris Christie, U.S. Senator Robert Menendez, Congressman Albio Sires and Mayor Dawn Zimmer. Galapalooza25 logo designed by Ron Leighton.

Acquisition

Accession

2011.059

Source or Donor

Staff, Collected by

Acquisition Method

Collected by Staff

Credit Line

Museum Collections.

Archive Details

Date(s) of Creation

2011 - 2011

Archive Notes

Date(s) Created: 2011 Date(s): 2011

General Notes

Note

Status: OK Status By: dw Status Date: 2011-11-25