Photographer's number 493
Date: 5-21-1932
Written on photograph: "Driver taking out spliced pile - Pile 4 Bent 10"
Footer description in scrapbook reads:
"Owing to the difficulty of driving piles in the old fill, holes were dug for each pile beyond Bent 1,
and in almost every case it was necessary to drill and shoot the
holes, Sheeting was placed as the holes were dug to prevent the soft material from sloughing
back in."