Jonathan Maynard Parmenter provided in his will $225,000 to create a water supply for central and north Wayland. The wells are near Baldwin Pond where the pumphouse forces the water through a standpipe to a watertank on Reeves Hill. J.J. Ducey Company of Framingham, MA was awarded the contract to extend the water system in the north end of Wayland in 1930
Collection
W. H. Folsom Shoebox Collection
Acquisition
Notes
(these were discovered in an old shoe box in the closet off the Stone Room, next to Willie’s shed in 1983)
Made/Created
Artist
Folsom, Wallace Herbert
Lexicon
Search Terms
Folsom, Wallace Herbert, (1884-1954) -- Photographer Parmenter, Jonathan Maynard (1831-1921) Baldwin’s Pond -- Wayland, (Mass.) Ducey, James Joseph (1887-1975) -- Civil Engineer Wayland pumphouse Waterworks
Other Names and Numbers
Other Number
C-87
Dimensions
Height
2-1/2 in
Width
4-1/4 in
General Notes
Note
[Total 761 negatives from original shoebox of Folsom negatives]