Letter: Willard Seiberling to Seiberling Family

Name/Title

Letter: Willard Seiberling to Seiberling Family

Entry/Object ID

A 2025.16.b1.f5.55

Description

The letter is titled "THE SAGA OF THE SAGGINGS Chapter I". The writer opens the letter describing the sinking condition of the Hessel Lodge's kitchen porch and wood room beneath and plans to get contractors lined up for summer work. The writer then shares details on the involved work in jacking up and bracing the walls and redoing the foundation to make it level. The writer then mentions their grandsons rigging a contraption to pull up logs from the wood room and errands in town to get the right materials to improve the contraption and make a trap door in the kitchen porch for that purpose. The writer ends the letter with "More in my next." and signs it "W" in black ink. At the top of the letter is a handwritten note to Irene commenting about the good write up in the paper and that they will mail postcards, but they are going to Democrats.

Subject Person/Organization

Seiberling, Willard Penfield, Harrison, Irene Seiberling

Collection

PERMANENT COLLECTION

Cataloged By

Katrina Neff

Acquisition

Accession

A 2025.16

Source or Donor

Unknown

Acquisition Method

Found

Letter Details

Letter Date

Jul 10, 1977

Sender

Name

Willard Seiberling

Primary Language

English

Transcription

Transcription

Irene: That was a GOOD write-up in the paper. I’ll mail your postcards, but they are going to Democrats, Bill THE SAGA OF THE SAGGINGS Chapter I Sun. 7-10-77. Dear Family,- For 50 years or more the east end of the wood storage room with the kitchen porch above it has been gradually sinking, so gradually that it has not been noticeable from year to year, but when we bought the place back after a vacancy of eleven years it was very noticeable, and now that we have had another eleven years of gradual sinking, it has become xxxx still more noticeable. With the east wall of the wood room about a foot lower than it should be, I wondered if it would be possible to save the structure. The ridge pole in the kitchen porch roof was sagging badly, the shingles on the roof were covered with moss, and the roof leaked in several places. The main reason for going up to Hessel early in May was to get contractors lined up for a lot of work this summer. Mr. Nye and I spent a whole morning over on the island goingover [sic] all the things that had to be done – enough to keep him or some other contractor busy for over a month. After a careful inspection of the wood room and the roof over the kitchen porch he said it was possible to jack the whole building up, roof and all, and by taking offthe [sic] old moss covered shingles, reinforcing the ridge pole and the rafters so as to take out the sag, and re-shingling the straightened roof with fire-proof asphalt shingles, we would have the equivalent of a new building, good for another 50 years. Little did he realize what he was getting into. If I had obtained firm bids on the whole job from several contractors and Nye had been the low bidder, he would have lost his shirt. They started by jacking up the eastwall [sic] slowly - about an inch or so between inspections - and found that the top of the wall (the porch level) was beginning to tilt eastward). So they rigged up some long braces butted against the trunks of trees and against big bolders [sic] in the ground - wait ‘til you see my slide show on this whole operation! I was inside the wood room with the workmen when one of the jacks slipped. WOW! For a moment I thought we all were going to be goners! The north wall, where the jack slipped, started to bulge out, but the men quickly braced it - otherwise the whole structure might have collapsed. After several days of gradual jacking and bracing and reinforcing as they went, the porch was again about level, but the bottoms of the wood room walls were hanging in air, with the rotted foundations staying in the ground. The old foundations had to be dug out, new 6”x6” creosoted timbers were placed on concrete block to establish new foundations, and new 2”x4”s were spliced to the old studs with their rotted bottome [sic] hanging in the air,with [sic] the new studs reaching down to the new foundations. Then the walls had to be shingled all the way around on the bottom and up the sides in some places. We walled up that narrow door at the northeast/corner of the wood room and put a wide double door in the center of the east wall for bringing in the big four-foot logs for the livingroom [sic] fireplace. The male members of the family - particularly my grandsons - who have the job of carrying fireplace logs from the wood room up to the wood bins on the porchea [sic], will be interested in the following: Frankie Shaw rigged up a Rube Goldberg contraption whereby he could pull up several logs at a time outside the east wall and over the railing on the kitchen porch. Bill and John Davis also used this pulley hoist. To improve upon this system I could not get what I wanted in Cedarville or Pickford, and had to go to four hardware stores in the Soo before I found the right “block and tackle” for my Rube Goldberg. Then I went over to Fireck Upholstering Shop near the St. Mary’s River, gave them a drawing to scale to show exactly what they were to make to provide a sling to hold a bundle of logs. Then I gave Nye a scale drawing showing the dimensions and construction of a trap door in the floor of the kitchen porch, with a support across the rafters of the roof directly above the center of the trap door, from which the block and tackle would hang. A ten lb. pull on the rope will lift a 30 lb. load of fire-wood. And as you all know, with blown-down trees each year giving us a big surplus of logs, we have “wood to burn.” More in my next. W

Transcriber

Cindi Roke

Language

English

Create Date

August 12, 2026

Update Date

August 14, 2026